Registration lapsed No litigation declared Residential / Group Housing project

Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali

By Anubhav Anilkumar Aggarwal

RG-MH-10898 · RERA P51800005383 · Last updated on MahaRERA portal: 16 Sep 2023

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 72 months past the filed date
  • 1 complaint at MahaRERA
  • Completion date moved by 30 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2020Possession promised72 months past this date
10 of 11Construction stages donefurthest along: Installation of Lifts, 96%
1Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali is a Residential / Group Housing project by Anubhav Anilkumar Aggarwal in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005383 on 11 Aug 2017. Possession was promised by 30 Oct 2020 and is now 72 months past that date. The completion date has moved by 30 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBuildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali
  • TypeResidential / Group Housing
  • Location
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800005383
  • ReraGenie IDRG-MH-10898

Builder

  • NameAnubhav Anilkumar Aggarwal
  • Entity typeIndividual
  • Named personAnubhav Anilkumar Aggarwal

Key dates

72 months past promisethis monthRegisteredAug 2017First promiseApr 2018Revised toOct 2020

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on11 Aug 2017
  • Promised completion30 Oct 2020
  • Revised completionRevised to 30 Oct 2020 (originally 30 Apr 2018)
  • Buildings1 building record
  • Documents filed65 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RNA GrandeNA240000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 16 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 96%.

RNA Grande: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.96%

Progress on shared amenities17

As on 16 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%
Not applicableYes0%
Covered ParkingYes100%

Parking filed113

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots113
Closed/Covered105
Open Space8

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,903 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI12839.5
Proposed, not sanctioned12,734 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJeles Education Societys Bldg J L Shershekar Marg Bandra East Mumbai 400051

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s B.S.Barot License Surveyor
EngineerHM Raje Structural Consultants Pvt. Ltd
PartnerRole in project
Anubhav Anilkumar Aggarwal-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800000305Apr 2018 → Apr 2020

Reason as filed by the promoterThe proposed Residential building no. 2 consists of 2 wings. The 1st to 15th floors in wing ‘D’ & 1st to 16th floor in wing ‘E’ were proposed as per the DCR prevailing prior to 06.01.2012 and 16th to 18th Floors in wing ‘D’ and 17th and 18th floors were proposed as per modified DC Regulation dtd. 06.01.2012. The latest building plan approval was issued 24.07.2014 & CC was issued on 22.10.2014. We uploaded the request for approval of revised bldg. plans in view of regularization of electrical meter room, Meter & Panel room, society office, filtration/pump room, changing room at stilt & podium l

EXT51800001709Apr 2018 → Apr 2020

Reason as filed by the promoterThe proposed residential bldg. no. 2 consists of 2 wings. The 1st to 15th floor in wing ‘D’ & 1st to 16th floor in wing ‘E’ were proposed as per the DCR prevailing prior to dtd. 06.01.2012 & 16th to 18th floor in wing ‘D’ & 17th & 18th floors were proposed as per modified DC Regulation dtd. 06.01.2012. The latest bldg. plan approval was issued dtd. 24.07.2014 & CC was issued on dtd. 22.10.2014. We uploaded the request for approval of revised bldg. plans in view of regularization of Electrical meter room, Meter & Panel room, Society office, Filtration/Pump room, Changing room at stilt & Podium

Litigation declared5

CaseCourtStatus
First Appeal No 247 of 2017/2017National Consumer Disputes Redressal Commission at DelhiDisposed off
SLP Civil 2017/2017Supreme Court of India Stay of the proceeding of Consumer Complaint Eight eighty one of Twenty sixteen until further order
COMSL 57 2016/2016High Court at BombayDisposed off
Appeal No 330 of 2016/2016Dy Joint Registrar Co Op SocDisposed off
881 of 2016/2016State Consumer Dispute Redressal CommissionFor Hearing the complainant along with the Application raising Preliminary Issues of Jurisdiction

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000078389Dilip Murlidhar BhatiaRNA Universal through proprietor Anubhav Anilkumar Aggarwal08/03/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: grande form5 of 19.pdf16 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Grande form 5 for 2020.pdf16 Sep 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: grande form 5 for 2021.pdf16 Sep 2023
Certificates of CA (Form 3)File: Form 3 Grande 2019 Signed_compressed.pdf8 Jun 2023
Certificates of CA (Form 3)File: Form 3 Grande 2020 Signed (2)_compressed.pdf8 Jun 2023
Certificates of CA (Form 3)File: Form 3 Grande 2021 Signed (1)_compressed.pdf8 Jun 2023
Form 2AFile: FORM 2A.pdf31 Jul 2019
Certificates of CA (Form 5)File: Grande signed form 5.pdf30 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Grande.pdf11 Jun 2019
Copy of the legal title reportFile: Project Grande - One Page Title Report.pdf26 Apr 2018
Proforma of Allotment letterFile: Final approved grande agreement 20-3-2018.pdf20 Mar 2018
OtherFile: Grande Note 1.pdf31 Jul 2017
Details of encumbrancesFile: Grande Encum.pdf30 Jul 2017
Details of encumbrancesFile: 7.pdf30 Jul 2017
Details of encumbrancesFile: 8.pdf30 Jul 2017
Declaration in FORM BFile: Form B and DA of Grande.pdf30 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Grande Architects Certificate.pdf30 Jul 2017
Certificates of CA (Form 3)File: Form 3 Grande.pdf30 Jul 2017
Proforma of Allotment letterFile: Grande.pdf30 Jul 2017
OtherFile: Grande Note 2.pdf30 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate for Grande.pdf29 Jul 2017
Building plan approvalFile: RNA Grande Amended IOA dt 22seprt2014.pdf25 Jul 2017
Building plan approvalFile: 2 Plot Area Calculation dt 22 Sept 2014.pdf25 Jul 2017
Building plan approvalFile: 3 Lower Gr Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 1 Block plan dt 22 Sept 2014.pdf25 Jul 2017
Building plan approvalFile: 8 4th Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 9 1fl plan wing Dand E Typical FlPl(Wing DandE) 2 to7, 9 to14 Fl Pl dt 22sept2014.pdf25 Jul 2017
Building plan approvalFile: 10 16 17 18 Fl Plan (Wing D and E) dt22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 5 1st Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 6 2nd Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 4 Ground Fl Plan dt 22 april 2014.pdf25 Jul 2017
Building plan approvalFile: 11 Line area diagram Wing D and E for 16 18 fl pl dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 12 Wing D and E 8 15 Fl Pl and Terrace Fl pl dt 22 sept2014 (FILEminimizer).pdf25 Jul 2017
Building plan approvalFile: 13 Line area diagram wing D and E dt 22sept 2014.pdf25 Jul 2017
Building plan approvalFile: 14 Section Plan dt 22 sept 2014.pdf25 Jul 2017
Building plan approvalFile: 7 3rd Podium Fl plan dt 22 sept 2014 (FILEminimizer).pdf25 Jul 2017
Layout approvalFile: Kandivali Layout Plan Document 29 Mar 2007 Pg 1-10.pdf25 Jul 2017
Layout approvalFile: kandivali layout approval plan 29 march 2007.pdf25 Jul 2017
Layout approvalFile: kandivali layout approval plan 29032007.pdf25 Jul 2017
Layout approvalFile: Kandivali Layout Plan Document 29 Mar 2007 11to20.pdf25 Jul 2017
Layout approvalFile: Kandivali Layout Plan Document 29 Mar 2007 Pg 21 to 34.pdf25 Jul 2017
PAN CardFile: PAN Anubhav Aggarwal.pdf25 Jul 2017
Copy of the legal title reportFile: Grande Title Report Pg 1to10.pdf25 Jul 2017
Copy of the legal title reportFile: Grande Title Report Pg 11 to 19.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Kandivali Layout Plan Document 29 Mar 2007 Pg 1-10.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Kandivali Layout Plan Document 29 Mar 2007 11to20.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: Kandivali Layout Plan Document 29 Mar 2007 Pg 21 to 34.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: kandivali layout approval plan 29 march 2007.pdf25 Jul 2017
Copy of Layout Approval (in case of layout)File: kandivali layout approval plan 29032007.pdf25 Jul 2017
Building Plan Approval (IOD)File: RNA Grande Amended IOA dt 22seprt2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 1 Block plan dt 22 Sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 2 Plot Area Calculation dt 22 Sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 3 Lower Gr Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 4 Ground Fl Plan dt 22 april 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 5 1st Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 6 2nd Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 7 3rd Podium Fl plan dt 22 sept 2014 (FILEminimizer).pdf25 Jul 2017
Building Plan Approval (IOD)File: 8 4th Podium Fl Plan dt 22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 9 1fl plan wing Dand E Typical FlPl(Wing DandE) 2 to7, 9 to14 Fl Pl dt 22sept2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 10 16 17 18 Fl Plan (Wing D and E) dt22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 11 Line area diagram Wing D and E for 16 18 fl pl dt 22 sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 12 Wing D and E 8 15 Fl Pl and Terrace Fl pl dt 22 sept2014 (FILEminimizer).pdf25 Jul 2017
Building Plan Approval (IOD)File: 13 Line area diagram wing D and E dt 22sept 2014.pdf25 Jul 2017
Building Plan Approval (IOD)File: 14 Section Plan dt 22 sept 2014.pdf25 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC RNA Grande further CC dt 22 Oct 2014.pdf25 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 30 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Buildings on portion of Sub plot A CTS no 67 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali6,700+ in Mumbai Suburban

2 kmBuildings on portion of Completed 112Lapsed / revoked 69Other 150Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: Anubhav Anilkumar Aggarwal

Anubhav Anilkumar Aggarwal has 1 registration on MahaRERA, including Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali is delayed beyond 30 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

The registered promoter entity is Anubhav Anilkumar Aggarwal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

The professionals named in the filing: Architect: M/s B.S.Barot License Surveyor; Engineer: HM Raje Structural Consultants Pvt. Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Buildings on portion of Sub plot A CTS no 671A 662A 610A etc of Kandivali. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Buildings on portion of Sub plot A CTS no 67 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.