Home / Browse projects / Mumbai Suburban, Maharashtra / Building No 2 Pearl Regency Phase 1

Registration lapsed No litigation declared Residential / Group Housing project

Building No 2 Pearl Regency Phase 1

By Prime Infrabuildcon Pvt. Ltd.

RG-MH-30073 · RERA P51800029784 · Last updated on MahaRERA portal: 6 Jan 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
2 of 103Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 165 documents Report an error

Building No 2 Pearl Regency Phase 1 is a Residential / Group Housing project by Prime Infrabuildcon Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800029784 on 29 Jun 2021. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 101 of the 103 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameBuilding No 2 Pearl Regency Phase 1
  • TypeResidential / Group Housing
  • Location
    • SV Road
    • Opposite Andheri Subway
    • Andheri
    • Mumbai Suburban
    • 400058
  • Pincode400058
  • RERA no.P51800029784
  • ReraGenie IDRG-MH-30073

Builder

  • NamePrime Infrabuildcon Pvt. Ltd.
  • Entity typeCompany
  • DirectorsSajid Ahmed Chandiwala, Adil Ahmed Chandiwala, Hubert Crasto
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredJun 2021PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on29 Jun 2021
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed165 files

Current status

98%101 of 103 units booked
90.5%Work done, per cost certificate

Figures as on 6 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No 2 Pearl Regency Phase 1NA1091030103

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 6 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building No 2 Pearl Regency Phase 1: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 6 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed36

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots36
Closed/Covered36

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,716 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on4 Dec 2025
LandownerVillageDistrict
Government Of MaharashtraGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILATION AUTHORITY
Permissible FSI19097.73
Proposed, not sanctioned5,002 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndian Bank Andheri west Mumbai 400058
Estimated costRs 163.12 cr
Cost incurredRs 147.58 cr
Work done90.47%
BuildingWingEstimatedIncurred
Building No 2 Pearl Regency Phase 1NARs 146.12 crRs 130.58 cr
-NARs 17.00 crRs 17.00 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAASHISH SOLANKI
EngineerUJAS LIMBANI
Chartered AccountantKUMAVAT AND COMPANY
Chartered AccountantBhupendra Natvarlal Jagdishwala
PartnerRole in project
Prime Infrabuildcon Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jun 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jun 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed165

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 165 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: 300925.pdf6 Jan 2026
Withdrawal Update Form 2File: form2.pdf6 Jan 2026
Withdrawal Update Form 3File: PEARL REGENCY PHASE_SIGNED_1 30092025.pdf6 Jan 2026
Withdrawal Update Form 1File: 300625.pdf8 Dec 2025
Withdrawal Update Form 2File: form2.pdf8 Dec 2025
Withdrawal Update Form 3File: Phase 1.pdf8 Dec 2025
Form 5 (FY 2021-2022)File: Audit Report rera.pdf4 Dec 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_signed_6 May 2025.pdf10 May 2025
Form_1_of_RERA_updated_on_1804202529 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_Signed_18 April 2025.pdf26 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Regency - I 19042025.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Regency Stock Inventory.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_18032025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_31032025.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_Signed_31 Mrch 2025.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 200225.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT MAR25.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 310325.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_12022025 (1).pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_20022025 (1).pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_Signed_13 Feb 25.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase I_Signed_20 Feb 25.pdf5 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_Signed_20 March 2025 (1).pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 220125.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: eNG cERT 010225 PHASE 1.pdf5 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CERT 130225 PHASE 1.pdf5 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_31012025.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_Signed_22 Jan 25 (1).pdf5 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency I Engineers Certificate 07012025.pdf21 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PEARL REGENCY PHASE 1 07012025.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency I Engineers Certificate 31122024.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_31122024.pdf4 Jan 2025
Disclosure of sold/ booked inventoryFile: Stock Phase 1.pdf3 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PEARL REGENCY PHASE 1_Signed_31 Dec 24.pdf2 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_19122024.pdf1 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency I Engineers Certificate 20122024.pdf1 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_10122024.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency Engineers Certificate dated 04122024.pdf11 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_13102024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_19102024.pdf9 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_06112024.pdf9 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1_signed_04 Dec 24.pdf9 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency - I Engineers Certificate dated 12092024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency - I Engineers Certificate dated 25112024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency - I Engineers Certificate dated 06112024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency - I Engineers Certificate dated 19102024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: P Regency - I Engineers Certificate dated 13102024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Regency 061124_compressed.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Regency 251124_compressed.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert Regency Oct 24_compressed.pdf5 Dec 2024
Disclosure of sold/ booked inventoryFile: Stock P Regency1 300924.pdf27 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cer P Regency 131024 (1).pdf21 Nov 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Sale Bldg No 02.pdf21 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P Regency CA Cert 120824 Phase 1.pdf20 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: P Regency CA Cert 120924_compressed.pdf20 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert 250624.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form_1_of_RERA_updated_on_30062024.pdf9 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Pearl Regency Phase 1 signed - 25 June 24 (1).pdf9 Jul 2024
Disclosure of sold/ booked inventoryFile: P Regency Phase 1.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG CER 150524.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cer Pearl regency 150524 (2).pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERT 150524.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 16062023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 26072023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 13082023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 19092023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 24102023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 30112023 Phase 1 C A Certificate.pdf29 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 26122023 Phase 1 C A Certificate.pdf29 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 30062021 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 30092021 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 31122021 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 31032022 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 30062022 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 30092022 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 31122022 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 31032023 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 30062023 Form 1 Pearl Regency.pdf25 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 30092023 Form 1 Pearl Regency.pdf25 Apr 2024

How this compares with Mumbai Suburban

98%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Building No 2 Pearl Regency Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opposite Andheri Subway6,700+ in Mumbai Suburban

Builder: Prime Infrabuildcon Pvt. Ltd.

Prime Infrabuildcon Pvt. Ltd. has 2 registrations on MahaRERA, including Building No 2 Pearl Regency Phase 1 and Building No 2 Pearl Regency Phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that Building No 2 Pearl Regency Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Building No 2 Pearl Regency Phase 1 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Building No 2 Pearl Regency Phase 1?

The registered promoter entity is Prime Infrabuildcon Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Building No 2 Pearl Regency Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Building No 2 Pearl Regency Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Building No 2 Pearl Regency Phase 1?

The professionals named in the filing: Architect: AASHISH SOLANKI; Engineer: UJAS LIMBANI; Chartered Accountant: KUMAVAT AND COMPANY; Chartered Accountant: Bhupendra Natvarlal Jagdishwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Building No 2 Pearl Regency Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Building No 2 Pearl Regency Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Building No 2 Pearl Regency Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.