Registration approved Residential/Group Housing project

Brigade Sapphire

By Brigade Enterprises Ltd

RG-KA-16154 · RERA PRM/KA/RERA/1268/378/PR/200123/003232 · Last updated on RERA Karnataka portal: 21 Jan 2020

Source: official RERA Karnataka filing

Red flags

  • Completion date moved by 15 months
  • 2 extensions taken

Clear

  • No complaints on record
  • Separate project account declared
Mar 2024Possession promisedmoved 15 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 89 documents Report an error

Brigade Sapphire is a Residential/Group Housing project by Brigade Enterprises Ltd in Mysore, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1268/378/PR/200123/003232 on 23 Jan 2020. Possession is promised by 31 Mar 2024. The completion date has moved by 15 months from the original filing.

At a glance

Project

  • NameBrigade Sapphire
  • TypeResidential/Group Housing
  • Location
    • MYSORE
  • PincodeNot stated
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1268/378/PR/200123/003232
  • ReraGenie IDRG-KA-16154

Builder

  • NameBrigade Enterprises Ltd
  • Entity typeCompany
  • CINL85110KA1995PLC019126
  • Authorized SignatoryViswa Prathap Desu
  • Other registrations4 more →
  • Declared earlier projects37 →

Key dates

this monthRegisteredJan 2020First promiseDec 2022Revised toMar 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jan 2020
  • Promised completion31 Mar 2024
  • Revised completionRevised to 31 Mar 2024 (originally 31 Dec 2022)
  • Buildings2 building records
  • Documents filed89 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Block A---47047
Block B---46046

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Jan 2020, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level BeamNot applicable
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 21 Jan 2020, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterNoNot applicable
Solid waste management and disposalYes-
Water conservationYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesNoNot applicable
Electricity supply transformer and substationNoNot applicable
Emergency Evacuation servicesNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseYes-
Community HallYes-
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasNoNot applicable
Water and SanitationYes-
Air Conditioning And incerntionNoNot applicable
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areas and common storage spacesNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-

Land and ownership

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,975 sq m
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 38.00 cr

Certifying professionals and partners2

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectALAY Design
EngineerVIJAY KUMAR

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

ExtensionDec 2022 → Sep 2023

No reason recorded in the filing

EX/PRM/KA/RERA/1268/378/PR/230922/003232Sep 2023 → Mar 2024

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed89

As listed on the registration, under the names the promoter filed them with; the newest 80 of 89 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1268/378/PR/200123/003232 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Joint Affidavit Cum DeclarationFile: Affidavit Cum Declaration.pdf21 Jan 2020
Site PlanFile: Site Plan.pdf21 Jan 2020
Typical Floor PlansFile: Typical Floor Plans.pdf21 Jan 2020
CertificateFile: Certificate of Incorporation - BEL copy.pdf-
Architect Certificate for Work Completion Schedule till DateFile: Brigade Sapphire - Form EX1.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: Brigade Sapphire - Form EX5.pdf-
CA Certificate for Funds UtilizationFile: Brigade Sapphire - Form EX3.pdf-
Architect Certificate for Pending Work Completion Schedule.File: Brigade Sapphire - Form EX2.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: Brigade Sapphire - Form EX6.pdf-
CA Certificate for Funds required for Project CompletionFile: Brigade Sapphire - Form EX4.pdf-
AffidavitFile: Brigade Sapphire - Form EX7_compressed.pdf-
Latest Encumbrance CertificateFile: Encumbrance Certificate.pdf-
Details Of Sold/ Un-sold UnitsFile: SoldUnsoldDetails.xlsx-
Document 1File: Brigade Sapphire - Form B.pdf-
Brigade Sapphire Building Plan Sanction-
Site Plan (3)-
Typical Floor Plans (1)-
Note - Sale Deed-
Proforma Agreement to Sell - Sapphire-
Sale Deed and RTC-
Elevation and Section (1)-
Site Plan (3)-
Brigade Sapphire Pro forma Allotment Letter-
Sapphire RERA Brochure-
Sapphire Specifications-
EC Sapphire-
Affidavit-
Affidavit Cum Declaration-
E-khata - Sapphire-
JDA - Sapphire-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Fire NOC- Sapphire-
AAI NOC-
CHESCOM NOC-
Unnamed document-
KSPCB-
Unnamed document-
BSNL NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Elevation and Section (1)-
Site Plan (3)-
Section Elevation and Specification - Sapphire (1)-
Title opinion - Sapphire-
Balance Sheet 2018 - 2019File: Balance Sheet - 2018-2019.pdf-
Balance Sheet 2017 - 2018File: Balance Sheet - 2017-2018.pdf-
Balance Sheet 2016 - 2017File: Balance Sheet - 31-03-2017 (1).pdf-
Audited Profit and Loss Statement 2018 - 2019File: Profit and Loss - 2018-2019.pdf-
Audited Profit and Loss Statement 2017 - 2018File: Profit and Loss - 2017-2018 (1).pdf-
Audited Profit and Loss Statement 2016 - 2017File: P&L Account - 31-03-2017 (1).pdf-
Director's Report 2018 - 2019File: Board Report - 2018-19.pdf-
Director's Report 2017 - 2018File: Board's Report - 2017-2018 (1).pdf-
Director's Report 2016 - 2017File: Director's Report 2016-17.pdf-
Cash Flow Statement 2018 - 2019File: Cash Flow - 2018-2019.pdf-
Cash Flow Statement 2017 - 2018File: Cash Flow - 2017-2018 (1).pdf-
Auditor's Report 2018 - 2019File: Auditors Report - 2018-2019.pdf-
Auditor's Report 2017 - 2018File: Auditors Report 2017-2018 (1).pdf-
Auditor's Report 2016 - 2017File: Auditor's Report - 31-03-2017.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: ITRV - 2018-2019.pdf-
Income Tax Return Acknowledgement 2017 - 2018File: ITRV - 2017-18 (1).pdf-
Income Tax Return Acknowledgement 2016 - 2017File: ITR 2017 (1).pdf-
Form B-
Prospectus/BrochureFile: Sapphire RERA Brochure.pdf-
Tower Excel SheetFile: PRM_KA_RERA_1268_378_PR_200123_003232.xlsx-
Stability CertificateFile: BRIGADE SAPPHIRE - Structural Stability Certificate.pdf-
Road cutting permission letter issued by the planning Authority for laying Water supply line, sanitary line, UFile: Brigade Sapphire - Road Cutting Permission Letter.pdf-
NOC issued by the Fire Force department after completion of workFile: Brigade Sapphire - Fire CC.pdf-
Occupancy CertificateFile: Brigade Sapphire - Occupancy Certificate from KIADB.pdf-

How this compares with Mysore

28%of Mysore projects moved their completion datethis one moved by 15 months
0%of Mysore registrations are shown as withdrawn or revokedthis one is not

Computed across the 700+ Mysore projects on ReraGenie, from their own filings.

Keep Brigade Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Mysore700+ in Mysore

2 kmBrigade SapphireOther 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 3 registered projects within 2 km.

Builder: Brigade Enterprises Ltd

Brigade Enterprises Ltd has 5 registrations on RERA Karnataka, including Brigade Misty Greens and Brigade Oak Tree Place. Its filings declare 37 earlier projects, 22 of them declared completed. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mysore district page.

Frequently asked questions

What are my rights if Brigade Sapphire is delayed beyond 31 Mar 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Brigade Sapphire?

The registered promoter entity is Brigade Enterprises Ltd, a company as per the filing. Its CIN L85110KA1995PLC019126 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Brigade Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Brigade Sapphire?

The professionals named in the filing: Architect: ALAY Design; Engineer: VIJAY KUMAR. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brigade Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brigade Sapphire. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brigade Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.