Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Jun 2025Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 75%
18 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 90 documents Report an error

Brajesh Sapphire is a Residential / Group Housing project by Life Good Happiness Homes in Raigarh, Maharashtra, registered with MahaRERA as P52000033994 on 17 Mar 2022. The registration is recorded completed; possession was promised by 29 Jun 2025. The completion date has moved by 12 months from the original filing. 20 of the 38 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBrajesh Sapphire
  • TypeResidential / Group Housing
  • Location
    • Panvel
    • Harigram
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000033994
  • ReraGenie IDRG-MH-70326

Builder

  • NameLife Good Happiness Homes
  • Entity typePartnership
  • PartnersNeelam Bhardwaj, Brajesh Kumar Bhardwaj, Sanjeev Kumar

Key dates

this monthRegisteredMar 2022First promiseJun 2024Revised toJun 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Mar 2022
  • Promised completion29 Jun 2025
  • Revised completionRevised to 29 Jun 2025 (originally 30 Jun 2024)
  • Buildings1 building record
  • Documents filed90 files

Current status

53%20 of 38 units booked

Figures as on 26 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Brajesh SapphireNA6538038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 75%.

Brajesh Sapphire: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.75%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 26 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes90%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes80%
Landscaping & Tree PlantingYes80%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Closed/Covered12

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,880 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Ram Shankar BhopiHarigramRaigarh

Approvals and building plan

Sanctioning authorityCity And Industrial Development Corporation Of Maharashtra Ltd
Permissible FSI2740.28
Proposed, not sanctioned1,900 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTulsi Pooja, Plot No 5 - 7, S C Marg, Sector 1, New Panvel 410 206, Dist Raigad

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSwapnil Kalyankar Architects
EngineerSK Consultants & Engineers
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Life Good Happiness Homes-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000019622Jun 2024 → Jun 2025

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Mar 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed90

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 90 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Brajesh Sapphire as on June 2025.pdf26 Dec 2025
Form 2File: Form 2 - Brajesh Sapphire as on June 2025.pdf26 Dec 2025
Form 3File: Form 3 - Brajesh Sapphire as on June 2025.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Brajesh Sapphire as on June 2025.pdf26 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 12 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 15 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf17 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 13 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf17 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Brajesh Sapphire as on September 2024.pdf20 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Brajesh Sapphire as on September 2024.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - UPDATED - JUNE 2024_compressed.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - June 2024_compressed.pdf25 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - June 2024_compressed.pdf25 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - June 2024_compressed.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: Circular 29 - June 2024.pdf25 Oct 2024
Declaration about Commencement CertificateFile: Format D.pdf25 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24_compressed.pdf25 Oct 2024
Layout approvalFile: Copy of Layout.pdf30 Jul 2024
Building plan approvalFile: 1.pdf30 Jul 2024
Building plan approvalFile: 2.pdf30 Jul 2024
Building plan approvalFile: 3.pdf30 Jul 2024
Building plan approvalFile: 4.pdf30 Jul 2024
Copy of Layout Approval (in case of layout)File: Copy of Layout.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf30 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf30 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf30 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Brajesh Sapphire as on June 2024.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Brajesh Sapphire as on June 2024.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Brajesh Sapphire as on March 2024.pdf28 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Brajesh Sapphire as on March 2024.pdf28 Jun 2024
Declaration about Commencement CertificateFile: Format D.pdf17 Apr 2024
Declaration in FORM BFile: Form B.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Dec 23.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mar 24.pdf17 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Dec 23.pdf17 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23_11zon.pdf17 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf17 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf17 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf17 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Brajesh Sapphire as on March 2024.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: Information of Sold Booked inventory (Building Wise)PDF.pdf28 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Brajesh Sapphire as on Dec 2023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Brajesh Sapphire as on Dec 2023.pdf12 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Brajesh Sapphire as on Dec 2023.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Brajesh Sapphire as on Sep 2023.pdf7 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on 30-09-2023.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Brajesh Sapphire as on 30 Sept2023_compressed.pdf28 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Brajesh Sapphire FY 22-23.pdf24 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Brajesh Sapphire as on June 2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Brajesh Sapphire as on 30-06-2023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Brajesh Sapphire_compressed.pdf29 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_compressed (1).pdf29 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Signed.pdf27 Jul 2023
Proforma of Agreement for saleFile: Agreement for sale - Brajesh Sapphire.pdf17 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Brajesh Sapphire Mar 22 - Form 2.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Brajesh Sapphire Jun 22 - Form 2.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Brajesh Sapphire Sept 22 - Form 2.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Brajesh Sapphire Dec 22 - Form 2.pdf15 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Brajesh Sapphire Mar 23 - Form 2.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on March 2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on June 2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on September 2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on December 2022.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Brajesh Sapphire as on March 2023.pdf15 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Brajesh Sapphire as on March 2023.pdf15 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S041000491_2304091119000-1-3.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S041000491_2304091119000-4-6.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S041000491_2304091119000-7-9.pdf11 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S041000491_2304091119000-10-12.pdf11 Apr 2023
Proforma of Agreement for saleFile: AFS_BS_LGHH_07042023 (1).pdf11 Apr 2023
Proforma of Agreement for saleFile: Draft Agreement Brajesh Sapphire 07-11-2022.pdf22 Nov 2022
Proforma of Agreement for saleFile: Draft Agreement for Sale_Lifehomes_29 October 2022.pdf31 Oct 2022
Layout approvalFile: Harigram Plan-1_11zon.pdf14 Mar 2022
Building plan approvalFile: Harigram Plan-1_11zon.pdf14 Mar 2022
Building plan approvalFile: Harigram Plan-2-3_11zon (1).pdf14 Mar 2022
Copy of the legal title reportFile: merged title (1)-1-3 (1).pdf14 Mar 2022
Copy of Layout Approval (in case of layout)File: Harigram Plan-1_11zon.pdf14 Mar 2022
Building Plan Approval / NA Order for plotted developmentFile: Harigram Plan-1_11zon.pdf14 Mar 2022

How this compares with Raigarh

53%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Brajesh Sapphire on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Panvel5,900+ in Raigarh

2 kmBrajesh SapphireCompleted 7Lapsed / revoked 6Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 40 registered projects within 2 km.

Builder: Life Good Happiness Homes

Life Good Happiness Homes has 1 registration on MahaRERA, including Brajesh Sapphire. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Brajesh Sapphire is delayed beyond 29 Jun 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Brajesh Sapphire?

The registered promoter entity is Life Good Happiness Homes, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Brajesh Sapphire?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Brajesh Sapphire?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Brajesh Sapphire?

The professionals named in the filing: Architect: Swapnil Kalyankar Architects; Engineer: SK Consultants & Engineers; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Brajesh Sapphire?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Brajesh Sapphire. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Brajesh Sapphire to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.