Home / Browse projects / Pune, Maharashtra / BLUE DICE PHASE III
BLUE DICE PHASE III
RG-MH-22020 · RERA P52100031264 · Last updated on MahaRERA portal: 16 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 7 months past the filed date
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BLUE DICE PHASE III is a Others project by SHWETALI JITENDRA SONIGARA in Pune, Maharashtra, registered with MahaRERA as P52100031264 on 15 Oct 2021. Possession was promised by 31 Mar 2026 and is now 7 months past that date. The completion date has moved by 24 months from the original filing. 87 of the 93 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.
At a glance
Project
- NameBLUE DICE PHASE III
- TypeOthers
- Location
- Patil Nagar Road
- Patil Nagar
- Chikhali
- Haveli
- Pune
- 412114
- Pincode412114
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100031264
- ReraGenie IDRG-MH-22020
Builder
- NameSHWETALI JITENDRA SONIGARA
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on15 Oct 2021
- Promised completion31 Mar 2026
- Revised completionRevised to 31 Mar 2026 (originally 31 Mar 2024)
- Buildings2 building records
- Documents filed155 files
Current status
Figures as on 16 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F-1 | NA | 12 | 12 | 42 | 6 | 48 |
| F-2 | NA | 12 | 12 | 42 | 3 | 45 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 0%.
F-182%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
F-282%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed75
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Open Space | Total |
|---|---|---|
| F-1 | 37 | 37 |
| F-2 | 38 | 38 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| F-1 | NA | Rs 7.41 cr | Rs 7.04 cr |
| F-2 | NA | Rs 7.41 cr | Rs 7.04 cr |
| - | NA | Rs 2.31 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rushikesh Bhutkar |
| Engineer | Rahul Kapse |
| Engineer | Vikas Krushna Kolhe |
| Chartered Accountant | SANKET RAM KURHE |
| Chartered Accountant | CA Satish Aghav |
| Chartered Accountant | CA Karuna Shah |
| Chartered Accountant | Ashish Sanjay Oswal |
| Partner | Role in project |
|---|---|
| SHWETALI JITENDRA SONIGARA | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAs per new rules of UDCPR adding additional F.S.I. to the said building.
Reason as filed by the promoter1)The primary reason for a delay in the site work has been a delayed rivision in building sanction. 2) S J Associates had applied for a revision in building F1 & F2 floors from 11 to 12 residential floors in 2024, which was not granted after a long delay of almost 8 months.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Oct 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Jul 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 12 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed155
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 155 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 ARCHITECT CERTIFICATE Q4.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form 3_CA Certificate_Q4.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: Form 1_Q3_S J_11zon.pdf | 27 Mar 2026 |
| Withdrawal Update Form 2File: Form 2_S J_Q3.pdf | 27 Mar 2026 |
| Withdrawal Update Form 3File: Form 3_S J_Q3.pdf | 27 Mar 2026 |
| Withdrawal Update Form 1File: Form 1_Q2_S J.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: Form 2_S J_Q2.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: Form 3_S J_Q2.pdf | 26 Mar 2026 |
| Form 1File: ARCHITECT CERTIFICATE F1 & F2.pdf | 14 Aug 2025 |
| Form 2File: Form 2_Engineer Certificate.pdf | 14 Aug 2025 |
| Form 3File: CA Form 3_11zon.pdf | 14 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf | 14 Aug 2025 |
| Form 1File: Form 1_Mar25.pdf | 13 Aug 2025 |
| Form 2File: Form 2_Q4.pdf | 13 Aug 2025 |
| Form 3File: 11 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf | 13 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold March 25.pdf | 13 Aug 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY 2425_compressed.pdf | 7 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Q4 FY 2425.pdf | 7 May 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2324.pdf | 7 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Q4.pdf | 6 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM III_SJ_11zon.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_SJ_F1.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_SJ_F2.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Mar25.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_June 2024.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 2024.pdf | 28 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q3 FY 24-25_11zon.pdf | 28 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering certificate II_11zon.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold_F1_June24.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_F2_June24.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_F1_Sep24.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_F2_Sep24.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_F1_Dec24.pdf | 28 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold_F2_Dec24.pdf | 28 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE S J.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S J_Form 2.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: FINAL F1 Sold unsold Inventory.pdf | 24 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: FINAL F2 sold unsold inventory.pdf | 24 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE 2021.pdf | 17 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance 2022.pdf | 17 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance 2023.pdf | 17 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Assurance 2024.pdf | 17 Jun 2024 |
| Building plan approvalFile: 1 (2)_11zon.pdf | 12 Jun 2024 |
| Building plan approvalFile: 2 (1)_11zon.pdf | 12 Jun 2024 |
| Building plan approvalFile: 3_11zon.pdf | 12 Jun 2024 |
| Building plan approvalFile: 4_11zon.pdf | 12 Jun 2024 |
| Building plan approvalFile: 20_11zon_Y.pdf | 12 Jun 2024 |
| Building plan approvalFile: 21_11zon_Y.pdf | 12 Jun 2024 |
| Building plan approvalFile: 22_11zon_Y.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 (2)_11zon.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 (1)_11zon.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 3_11zon.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 4_11zon.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 20_11zon_Y.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 21_11zon_Y.pdf | 12 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 22_11zon_Y.pdf | 12 Jun 2024 |
| Declaration about Commencement CertificateFile: P52100031264_FileName_0.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT F1 JUNE 2023.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT F2 June 2023.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHIECT F1 DEC 2023.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT F1 MARCH 2024.pdf | 12 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT F2 MARCH 2024.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 30 SEP 2023.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31 march 2024.pdf | 12 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: F1 F2 Details 11zon.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SJ_Updated Form 3.pdf | 12 Jun 2024 |
| Building plan approvalFile: HPSC0049_1_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0050_2_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0051_3_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0051_3_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0053_4_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0054_5_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0055_6_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0056_7_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0057_8_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0058_9_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0059_10_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0060_11_11zon.pdf | 11 Jun 2024 |
| Building plan approvalFile: HPSC0061_12_11zon.pdf | 11 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 155 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BLUE DICE PHASE III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Patil Nagar13,700+ in Pune
Filed coordinates, straight-line distance. 84 registered projects within 2 km.
Aishwaryam Anand
Sai Essen Developers
AISHWARYAM HAMARA ABHIMAAN
SAI ESSEN DEVELOPERS
AISHWARYAM HAMARA GAURAV
SAI ESSEN DEVELOPERS
VAASTU DREAMS III
SAI ESSEN 7 AND 8 LLP
AISHWARYAM COURTYARD GOLD
SAI ESSEN PROPERTIES
GANESH PARADISE PHASE 2
EKDANTA NEST LLP
Builder: SHWETALI JITENDRA SONIGARA
SHWETALI JITENDRA SONIGARA has 1 registration on MahaRERA, including BLUE DICE PHASE III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that BLUE DICE PHASE III shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BLUE DICE PHASE III is delayed beyond 31 Mar 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BLUE DICE PHASE III?
The registered promoter entity is SHWETALI JITENDRA SONIGARA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BLUE DICE PHASE III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BLUE DICE PHASE III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BLUE DICE PHASE III?
The professionals named in the filing: Architect: Rushikesh Bhutkar; Engineer: Rahul Kapse; Engineer: Vikas Krushna Kolhe; Chartered Accountant: SANKET RAM KURHE; Chartered Accountant: CA Satish Aghav; Chartered Accountant: CA Karuna Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BLUE DICE PHASE III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback