ReraGenieLog inGet a buyer report

Home / Browse projects / Dakshina Kannada, Karnataka / BLOSSOM TOWERS

Registration approved No litigation declared Mixed Development project

BLOSSOM TOWERS

By SIMON MASCARENHAS

RG-KA-69749 · RERA PRM/KA/RERA/1257/478/PR/160425/007671 · Last updated on RERA Karnataka portal: 3 Apr 2025

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Jan 2025Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 74 documents Report an error

BLOSSOM TOWERS is a Mixed Development project by SIMON MASCARENHAS in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/478/PR/160425/007671 on 16 Apr 2025. Possession is promised by 30 Jan 2025.

At a glance

Project

  • NameBLOSSOM TOWERS
  • TypeMixed Development
  • Location
    • Moodabidri
    • Dakshina Kannada
    • 574213
  • Pincode574213
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/478/PR/160425/007671
  • ReraGenie IDRG-KA-69749

Builder

  • NameSIMON MASCARENHAS
  • Entity typeProprietorship
  • Authorized SignatorySIMON MASCARENHAS

Key dates

Registered
16 Apr 2025
Promised
30 Jan 2025

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on16 Apr 2025
  • Promised completion30 Jan 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BLOSSOM TOWERS-----29

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 3 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 3 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area526 sq m
Named landowners2
LandownerVillageDistrict
SIMON MASCARENHAS--
SIMON MASCARENHAS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 4.46 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 4.46 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHALINI SURESH
EngineerSRINIVAS G.K PAI
Chartered AccountantUMESHA RAO M

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed74

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/478/PR/160425/007671 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
single layoutFile: single layout.pdf3 Apr 2025
Building LicenseFile: Building licence.pdf3 Apr 2025
ADLR Certified survey sketch 6 centsFile: ADLR sketch 6 cents.pdf3 Apr 2025
ADLR Certified survey sketch 7 centsFile: ADLR sketch 7 cents.pdf3 Apr 2025
all original sanctioned drawingsFile: section elevation and typical floor plan.pdf3 Apr 2025
OCFile: OC.pdf3 Apr 2025
Village mapFile: village map.pdf3 Apr 2025
ClarificationFile: clarification.pdf3 Apr 2025
RTC, survey 123/16-
Mutation, survey 123/16-
Encumbrance Certificate, survey 123/16-
Conversion/Alienation Order, survey 123/16-
Sale/Title/Gift Deed, survey 123/16-
Khatha, survey 123/16-
RTC, survey 123/2A5-
Mutation, survey 123/2A5-
Encumbrance Certificate, survey 123/2A5-
Conversion/Alienation Order, survey 123/2A5-
Sale/Title/Gift Deed, survey 123/2A5-
Khatha, survey 123/2A5-
Registration CertificateFile: MSME.pdf-
Certificate issued by CA Form 1File: CA report form 1.pdf-
Certificate issued by Architect Form 2File: form 2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: form 3 engineer certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: litigation affidavit.pdf-
Balance Sheet 2023 - 2024File: BS AY 2024-25.pdf-
Balance Sheet 2022 - 2023File: BS AY 2023-24.pdf-
Balance Sheet 2021 - 2022File: BS AY 2022-23.pdf-
Audited Profit and Loss Statement 2023 - 2024File: PL AY 2024-25.pdf-
Audited Profit and Loss Statement 2022 - 2023File: PL AY 2023-24.pdf-
Audited Profit and Loss Statement 2021 - 2022File: PL AY 2022-23.pdf-
Income Tax Return Acknowledgement 2023 - 2024File: ITR AY 2024-25.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR AY 2023-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR AY 2022-23.pdf-
Building licence-
approved plan-
single layout-
stability certificate-
specification-
proforma AOS-
Proforma allottment letter-
form b-
affidavit 3(!)-
search report-
mescom noc-
water noc-
KSPCB-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
OC-
Estimation cost by engineer-
mescom fee receip-
village map-
affidavit for sold unsold unit-
title deed-
land calculation sheet-
carpet area statement-
form 6 engineer certificate-
form 5 Architect Certificate -
reason for delay-
CA certificate-UDIN for 3 FY 2022,2023,2024-
Occupancy CertificateFile: OC.pdf-
Completion certificate issued by the competent authorityFile: OC.pdf-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep BLOSSOM TOWERS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

Builder: SIMON MASCARENHAS

SIMON MASCARENHAS has 1 registration on RERA Karnataka, including BLOSSOM TOWERS. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if BLOSSOM TOWERS is delayed beyond 30 Jan 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BLOSSOM TOWERS?

The registered promoter entity is SIMON MASCARENHAS, a proprietorship as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BLOSSOM TOWERS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BLOSSOM TOWERS?

The professionals named in the filing: Architect: SHALINI SURESH; Engineer: SRINIVAS G.K PAI; Chartered Accountant: UMESHA RAO M. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLOSSOM TOWERS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLOSSOM TOWERS. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLOSSOM TOWERS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.