Home / Browse projects / Nagpur, Maharashtra / Bloomdale Row House 12 61 to 66
Bloomdale Row House 12 61 to 66
By Mahindra Bebanco Developers Limited
RG-MH-33707 · RERA P50500019115 · Last updated on MahaRERA portal: 30 Sep 2023
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bloomdale Row House 12 61 to 66 is a Residential / Group Housing project by Mahindra Bebanco Developers Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500019115 on 4 Jan 2019. The registration is recorded completed; possession was promised by 30 Sep 2021.
At a glance
Project
- NameBloomdale Row House 12 61 to 66
- TypeResidential / Group Housing
- Location
- Wardha Road
- MIHAN
- Khapari
- Nagpur (Rural)
- Nagpur
- 441108
- Pincode441108
- RERA no.P50500019115
- ReraGenie IDRG-MH-33707
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on4 Jan 2019
- Promised completion30 Sep 2021
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Row House 12 61 to 66 | NA | 2 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Sep 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Row House 12 61 to 66: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities21
As on 30 Sep 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 94% |
| Water Supply | Yes | 93% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 96% |
| Landscaping & Tree Planting | Yes | 82% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 88% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 88% |
| Electrical meter room, sub-station, receiving station | Yes | 89% |
| Aggregate area of recreational Open Space | Yes | 50% |
| Open Parking | Yes | 81% |
| Swiming Pool | Yes | 100% |
| Tennis Court | Yes | 100% |
| Power Back up through DG | Yes | 100% |
| Half Basket Ball Court | Yes | 100% |
| Childrens Play Area | Yes | 100% |
| CCTV System In Common Area | Yes | 38% |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Hafeez Contractor |
| Engineer | Synergy Property Development Services Pvt Ltd |
| Chartered Accountant | P G BHAGWAT LLP Chartered Accountants |
| Partner | Role in project |
|---|---|
| Mahindra Bebanco Developers Limited | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to second wave of COVID-19 & due to lock down announced by the government, experiencing unusual acute shortage of construction labors. Hence due to such unexpected conditions the completion of project on given date seems difficult, hence request to consider time extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Dec 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Dec 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Dec 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Dec 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 18 Apr 2023
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RH 61-66 - 19115 signed.pdf | 30 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RH115560FY1819.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RH115560FY1920.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RH115560FY1920.pdf | 21 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5FY18-19.pdf | 20 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form5FY19-20.pdf | 20 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form5FY21-22.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARRH6166.pdf | 18 Apr 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERRH6166.pdf | 18 Apr 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ER2ARH6166.pdf | 18 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: CARH6166.pdf | 18 Apr 2023 |
| Certificates of CA (Form 3)File: CARH6166.pdf | 18 Apr 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf | 18 Apr 2023 |
| Architect’s Certificate on Completion of Project (Form 4)File: ARF4RH6166.pdf | 18 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5)File: 1 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 3 Annual Audit Report of Statutory CA (Form 5).pdf | 23 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1 Annual Audit Report of Statutory CA (Form 5).pdf | 23 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARRH6166.pdf | 18 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERRH6166.pdf | 18 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: ERRH61662A.PDF | 18 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: CARH6166.pdf | 18 Jan 2023 |
| Certificates of CA (Form 3)File: CARH6166.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5)File: 2 Annual Audit Report of Statutory CA (Form 5) (FY 2020-21).pdf | 18 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: CARH6166.pdf | 20 Oct 2022 |
| Certificates of CA (Form 3)File: CARH6166.pdf | 20 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARRH6166.pdf | 19 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ERRH6166.pdf | 19 Oct 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QARH6166.pdf | 19 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RH 12 P50500019115.PDF | 10 Sep 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate RH 61-66.pdf | 20 Jul 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate RH 61-66.pdf | 20 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate RH 61-66.pdf | 20 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER RH 61-66.pdf | 20 Jul 2022 |
| Certificates of CA (Form 3)File: CA 61-66 (2).pdf | 20 Jul 2022 |
| Certificates of CA (Form 3)File: RH 12 (RH 61-66) - Rera Certificate1.pdf | 25 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER-RH 61-66.PDF | 18 Apr 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2a Building RH 61-66.PDF | 18 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: MBDL AR - RH 61-66.PDF | 15 Apr 2022 |
| Certificates of CA (Form 3)File: RH 06166.pdf | 8 Apr 2022 |
| Certificates of CA (Form 3)File: rh 61-66 Form 3.pdf | 23 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: RH 12 P50500019115.pdf | 30 Sep 2021 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf | 13 Jul 2021 |
| Certificates of CA (Form 3)File: RH12 61-66.pdf | 7 Jun 2021 |
| Certificates of CA (Form 3)File: RH 12 61-66.pdf | 1 Feb 2021 |
| Annual Audit Report of Statutory CA (Form 5)File: Form 5 RH 12 61-66.pdf | 15 Dec 2020 |
| Certificates of CA (Form 3)File: RH 12 61-66.pdf | 2 Dec 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect`s Certificate RH 61-66.pdf | 23 Nov 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer`s Certificate RH 61-66.pdf | 23 Nov 2020 |
| Certificates of CA (Form 3)File: RH 11 55-60.pdf | 16 Oct 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RH 11 61-66.pdf | 11 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RH 11 61-66.pdf | 11 Aug 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RH 12 61-66.pdf | 11 Aug 2020 |
| Certificates of CA (Form 3)File: RH 12 61-66.pdf | 11 Aug 2020 |
| Proforma of Allotment letterFile: Agreement for Sale RH 61-66.pdf | 22 Jun 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR-RH 61-66.pdf | 28 Jan 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EN-RH 61-66.pdf | 28 Jan 2020 |
| Certificates of CA (Form 3)File: CA RH 61-66.pdf | 28 Jan 2020 |
| Certificates of CA (Form 3)File: RH 12 61-66.pdf | 31 Oct 2019 |
| Annual Audit Report of Statutory CA (Form 5)File: RH 61-66.pdf | 3 Oct 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert F 20 Q1 4D RH 12 (61-66).pdf | 1 Aug 2019 |
| Certificates of CA (Form 3)File: RH 12 61 66.pdf | 1 Aug 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC RH 12 61-66.pdf | 9 May 2019 |
| Certificates of CA (Form 3)File: RH 12 (61 to 66).pdf | 6 May 2019 |
| Declaration in FORM BFile: Form B.pdf | 31 Dec 2018 |
| Building plan approvalFile: Bloomdale_ Row House.pdf | 19 Dec 2018 |
| Building plan approvalFile: Bloomdale_ Row House.pdf | 19 Dec 2018 |
| Layout approvalFile: Lay out Plan_ Bloomdale.pdf | 19 Dec 2018 |
| PAN CardFile: Company PAN.pdf | 19 Dec 2018 |
| Copy of the legal title reportFile: TITLE REPORT MBDL.pdf | 19 Dec 2018 |
| Details of encumbrancesFile: Bloomdale _ Encumbrances.pdf | 19 Dec 2018 |
| Copy of Layout Approval (in case of layout)File: Lay out Plan_ Bloomdale.pdf | 19 Dec 2018 |
| Building Plan Approval (IOD)File: Bloomdale_ Row House.pdf | 19 Dec 2018 |
| Building Plan Approval (IOD)File: Bloomdale_ Row House.pdf | 19 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MBDL Commencement_certificate B10.pdf | 19 Dec 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: MBDL Commencement_certificate_2011.pdf | 19 Dec 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: synergy engineer,s certificate.pdf | 19 Dec 2018 |
| Certificates of CA (Form 3)File: RH 6 CA Certificate.pdf | 19 Dec 2018 |
| Certificates of CA (Form 3)File: RH 6 CA Certificate.pdf | 19 Dec 2018 |
| Proforma of Allotment letterFile: Agt for Sale-RH12 (61-66 ).pdf | 19 Dec 2018 |
Promoter's earlier projects37
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Luminare PH2 | Sector 59 Gurgaon Manesar Urban Complex | 120 | Completed | Feb 2021 | Feb 2021 |
| Luminare PH1 | Sector 59 Gurgaon Manesar Urban Complex | 120 | Completed | Mar 2020 | Mar 2020 |
| Aqualily Phase 2E | MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 196 | Completed | Mar 2019 | Mar 2019 |
| Windchimes | Mahindra Homes Pvt Ltd Sy No 37 2 37 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075 | 454 | Completed | Jun 2018 | Jun 2018 |
| Boisar Phase 2 | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 238 | Completed | Dec 2017 | Jun 2017 |
| Nova Phase 2 | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 369 | Completed | Aug 2017 | Aug 2017 |
| Boisar Phase 1 | Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar | 359 | Completed | Jun 2017 | Jan 2017 |
| Ashvita | Sy No 78 2 78 3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072 | 664 | Completed | Jun 2017 | May 2017 |
| Aqualily Phase 2C1 Block C5 | MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 24 | Completed | Mar 2017 | Mar 2016 |
| Lartista | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 21 | Completed | Sep 2016 | Sep 2016 |
| Avadi Phase I | Block No 84 WARD No 1 Paruthipattu Village Avadi Municipality Taluka Poonamallee | 604 | Completed | Jun 2016 | Late, Apr 2017 |
| Nova- Phase 1 | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 357 | Completed | May 2016 | Mar 2016 |
| IRIS Court Phase 3B | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 96 | Completed | Mar 2016 | Mar 2016 |
| Antheia | Mahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018 | 516 | Completed | Mar 2016 | Late, Oct 2016 |
| Bloomdale | Mahindra Bloomdale Project MIHAN SEZ DeNotified Area Beside D Y Patil International School Khapri Nagpur 441108 | 342 | Completed | Mar 2016 | Late, Jan 2017 |
| Aqualily Phase 2C1 Block C6 | MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 28 | Completed | Dec 2015 | Late, Mar 2016 |
| IRIS Court Phase 2 Block C D | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 96 | Completed | Sep 2015 | Mar 2015 |
| Aqualily phase 2C1 Block C3 C4 | MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 56 | Completed | Sep 2015 | Late, Mar 2016 |
| Aqualily Phase 2C1-Block C1 C2 | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 56 | Completed | Sep 2015 | Late, Mar 2016 |
| IRIS Court Phase 3A | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 133 | Completed | Mar 2015 | Mar 2015 |
| IRIS Court Phase 2 Block E | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 133 | Completed | Mar 2015 | Mar 2015 |
| Aura PH5 | Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex | 150 | Completed | Jan 2015 | Late, Sep 2016 |
| Aura PH4 | Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex | 142 | Completed | Jan 2015 | Late, Dec 2015 |
| Aqualily Phase 2B | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 178 | Completed | Nov 2014 | Nov 2014 |
| Aqualil Phase 1C 1D | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 77 | Completed | Oct 2014 | Oct 2014 |
| Aura PH3 | Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex | 110 | Completed | Jun 2014 | Late, Aug 2015 |
| Aura PH2 | Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex | 166 | Completed | Nov 2013 | Late, Oct 2014 |
| Aqualily Phase 2A | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 80 | Completed | Nov 2013 | Nov 2013 |
| Splendour Phase 2 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078 | 233 | Completed | Nov 2013 | Nov 2013 |
| Aqualily Phase 1B | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 33 | Completed | Oct 2013 | Oct 2013 |
| Iris Court Phase I | MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002 | 244 | Completed | Jun 2013 | Late, Dec 2013 |
| Aura PH1 | Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex | 231 | Completed | May 2013 | Late, Oct 2014 |
| Angelica | Bldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S V Road Mumbai | 67 | Completed | Mar 2013 | Mar 2013 |
| Aspen | Bldg A on plot bearing cts no. 899 A TO E of village pahadi goregaon S. V. Road Mumbai | 68 | Completed | Dec 2012 | Dec 2012 |
| Aqualily Phase 1A | PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002 | 41 | Completed | Oct 2012 | Oct 2012 |
| Splendour Phase 1 | CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP WEST MUMBAI 400078 | 265 | Completed | Oct 2011 | Oct 2011 |
| Chloris | Milestone 16 3 Sector 19 Faridabad | 160 | Completed | Jul 2011 | Jul 2011 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 18 other registrations, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
Keep Bloomdale Row House 12 61 to 66 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MIHAN2,800+ in Nagpur
Kanher Nagri Developers
KANHER NAGRI DEVELOPERS
MAHALAXMI NAGAR 6
MAHALAXMI ESTATE
MAHALAXMI NAGAR 4
PADMALAXMI DEVELOPERS
Moreshwar park 4
PRASANNA PLANNERS
PRIME PLATINUM
UMAKANT VITTHAL MENDHE
MAULI NAGAR 8
MAULI INFRATECH
See every Nagpur project, with the district possession charts
Builder: Mahindra Bebanco Developers Limited
Mahindra Bebanco Developers Limited has 19 registrations on MahaRERA, including Bloomdale Building 04 and Bloomdale Bloomdale 07. Its filings disclose 37 earlier MahaRERA projects: declares 25 of 37 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if Bloomdale Row House 12 61 to 66 is delayed beyond 30 Sep 2021?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bloomdale Row House 12 61 to 66?
The registered promoter entity is Mahindra Bebanco Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bloomdale Row House 12 61 to 66?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bloomdale Row House 12 61 to 66?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bloomdale Row House 12 61 to 66?
The professionals named in the filing: Architect: Hafeez Contractor; Engineer: Synergy Property Development Services Pvt Ltd; Chartered Accountant: P G BHAGWAT LLP Chartered Accountants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bloomdale Row House 12 61 to 66?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.