Completed No litigation declared Residential / Group Housing project

Bloomdale Duplex Home 6

By Mahindra Bebanco Developers Limited

RG-MH-00435 · RERA P50500009336 · Last updated on MahaRERA portal: 24 Mar 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2022Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 80%
1Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

Bloomdale Duplex Home 6 is a Residential / Group Housing project by Mahindra Bebanco Developers Limited in Nagpur, Maharashtra, registered with MahaRERA as P50500009336 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2022. The completion date has moved by 24 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBloomdale Duplex Home 6
  • TypeResidential / Group Housing
  • Location
    • Wardha Road
    • MIHAN
    • Khapri
    • Khapari
    • Nagpur (Rural)
    • Nagpur
    • 441108
  • Pincode441108
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500009336
  • ReraGenie IDRG-MH-00435

Builder

  • NameMahindra Bebanco Developers Limited
  • Entity typeCompany
  • DirectorsVimal Virendra Agarwal, Vimalendra Dashrath Singh, Parveen Prakash Mahtani
  • Other registrations18 more →
  • Completed19 of 19
  • Declared earlier projects37 →

Key dates

this monthRegisteredAug 2017First promiseMar 2020Revised toMar 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Mar 2022
  • Revised completionRevised to 30 Mar 2022 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed68 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Duplex Home 6 DH 15 DH 16NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 80%.

Duplex Home 6 DH 15 DH 16: 41% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities22

As on 24 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes72%
Water SupplyYes76%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes67%
Storm Water DrainsYes81%
Landscaping & Tree PlantingYes70%
Street LightingYes81%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes98%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes69%
Electrical meter room, sub-station, receiving stationYes55%
Aggregate area of recreational Open SpaceYes61%
Open ParkingYes65%
CCTV system in Common AreaYes30%
Childrens play AreaYes100%
Half Basket ball courtYes100%
Power Back through DGYes100%
Sub Station WorkYes67%
Swimming poolYes100%
Tennis courtYes100%

Parking filed12

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots12
Open Space12

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,256 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI1483.66
Proposed, not sanctioned1,484 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKotak Mahindra Bank Ltd 5 C Ii Mittal Court 224 Nariman Point Mumbai Maharashtra 400 021 Tel 022 66

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchitect Hafeez Contractor
EngineerSynergy Property Development Services Pvt Ltd
PartnerRole in project
Mahindra Bebanco Developers Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT50500003627Mar 2020 → Mar 2021

Reason as filed by the promoterDue to delay in issuing of Statutory Compliance from Maharashtra Airport Development Company (MADC) we are unable to complete Construction Work on said time.

Litigation declared4

CaseCourtStatus
35/2017High Court Mumbaiclosed
64/2017Bombay High CourtDisposal off on with Consent of Both the parties
147/2018National Company Law TribunalWithdrawn with consent of both the parties
111/2018High Court MumbaiDisposal off on with Consent of Both the parties

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC004000000010088ADITYA KUKDAYMahindra Lifespaces08/01/2019

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 29 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Aug 2022

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Other - TechnicalFile: Bloomdale Final OC.pdf24 Mar 2025
Other - TechnicalFile: Form 4 (New Format) 9336.pdf4 Mar 2025
Other - TechnicalFile: Approval Drawings DH 06.pdf4 Mar 2025
Architect’s Certificate on Completion of Project (Form 4)File: Duplex Homes No06 DH 1516.PDF29 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A DH 6 (15 16) 20-21.pdf21 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A DH 6 (15 16) 21-22.pdf21 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5A DH 6-compressed.pdf21 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: DUP 6 P50500009336.pdf10 Sep 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC 15605560.pdf30 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR DH 15-16.pdf7 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER DH 15-16.pdf7 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ER DH 15-16 2A.pdf7 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR Certifictate DH 15-16 (1612044567).pdf15 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ER Certificate DH 15-16.pdf15 Apr 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: ER Certificate 2a DH 15-16 (1612044567).pdf15 Apr 2022
Certificates of CA (Form 3)File: DH 01516.pdf8 Apr 2022
Disclosure of sold/ booked inventoryFile: Inv dh 15-16.pdf23 Nov 2021
Certificates of CA (Form 3)File: DH 15-16-Form 3.pdf23 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Dup 6 P50500009336.pdf1 Oct 2021
Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate.pdf13 Jul 2021
Certificates of CA (Form 3)File: DH06 15-16.pdf7 Jun 2021
Certificates of CA (Form 3)File: DH 06 15-16.pdf1 Feb 2021
Certificates of CA (Form 5)File: Form DH 6 15-16.pdf15 Dec 2020
Certificates of CA (Form 3)File: DH 06 15-16.pdf2 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect`s Certificate DH 15-16.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer`s Certificate DH 15-16.pdf23 Nov 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DH 6 15-6.pdf16 Oct 2020
Certificates of CA (Form 3)File: DH 6 15-6.pdf16 Oct 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: DH 6 15-16.pdf11 Aug 2020
Certificates of CA (Form 5)File: DH 6 15-16.pdf11 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR-DH 15-16.pdf28 Jan 2020
Certificates of CA (Form 3)File: CA DH 15-16.pdf28 Jan 2020
Certificates of CA (Form 3)File: DH 06 15-16.pdf31 Oct 2019
Certificates of CA (Form 5)File: DH 15-16.pdf3 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR DH 15 16-min.pdf24 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Cert F 20 Q1 4D Dup Home 6 (15-16 ).pdf1 Aug 2019
Certificates of CA (Form 3)File: DH 6.pdf1 Aug 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC DH 06 15-16.pdf9 May 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: MAHA RERA Engineer Certificate bldg DH 15 16-min.pdf30 Apr 2019
Certificates of CA (Form 3)File: DH 6-min.pdf30 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: DH 6 15-16.pdf31 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR DH 15 16.pdf24 Jan 2019
Certificates of CA (Form 3)File: DH 6.pdf24 Jan 2019
Proforma of Allotment letterFile: DH Allotment Letter.pdf19 Nov 2018
Proforma of Allotment letterFile: Agreement For Sale-DH 6 15-16.pdf19 Nov 2018
OtherFile: Certificate of Incorporation after change of name.pdf19 Nov 2018
Certificates of CA (Form 3)File: Duplex Home 6.pdf9 Nov 2018
Certificates of CA (Form 5)File: MBDL RERA Certificate Home 6-min.pdf6 Oct 2018
Certificates of CA (Form 5)File: MBDL RERA Certificate Home 6-min.pdf6 Oct 2018
Layout approvalFile: Master Layout Plan New.pdf2 Feb 2018
Copy of Layout Approval (in case of layout)File: Master Layout Plan New.pdf2 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AR DH 15 16.pdf2 Feb 2018
Proforma of Allotment letterFile: Agreement For Sale Duplex 06.pdf7 Nov 2017
OtherFile: Fitout-Guidelines.pdf7 Nov 2017
Layout approvalFile: Lay out Plan_ Bloomdale.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Lay out Plan_ Bloomdale.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: MBDL Commencement_certificate_New 1.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: MBDL Commencement_certificate_New.pdf29 Jul 2017
Declaration in FORM BFile: Declaration Form B _ Bloomdale.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AC Duplex Home06.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EC Duplex Home 06.pdf29 Jul 2017
Proforma of Allotment letterFile: AllotmtLtr-DuplexHome.pdf29 Jul 2017
Building plan approvalFile: Bloomdale_Duplex Home.pdf4 Jul 2017
Building Plan Approval (IOD)File: Bloomdale_Duplex Home.pdf4 Jul 2017
Certificates of CA (Form 3)File: Bloomdale_Duplex Home 6 DH 15 16.pdf4 Jul 2017
PAN CardFile: MBDL PAN Card.pdf3 Jul 2017
Copy of the legal title reportFile: TITLE REPORT MBDL.pdf3 Jul 2017
Details of encumbrancesFile: Bloomdale _ Encumbrances.pdf3 Jul 2017

Promoter's earlier projects37

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

25 delivered on promise12 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Luminare PH2Sector 59 Gurgaon Manesar Urban Complex120CompletedFeb 2021Feb 2021
Luminare PH1Sector 59 Gurgaon Manesar Urban Complex120CompletedMar 2020Mar 2020
Aqualily Phase 2EMAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002196CompletedMar 2019Mar 2019
WindchimesMahindra Homes Pvt Ltd Sy No 37 2 37 3 Opposite BPL Bannerghatta Road Arekere Bangalore 560075454CompletedJun 2018Jun 2018
Boisar Phase 2Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar238CompletedDec 2017Jun 2017
Nova Phase 2MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002369CompletedAug 2017Aug 2017
Boisar Phase 1Gut No 50 Plot No 1 Village Kambalgaon Taluka Palghar District Palghar359CompletedJun 2017Jan 2017
AshvitaSy No 78 2 78 3 Near Hitech city MMTS railway station Hafeezpet Road Kukatpally Hyderabad 500072664CompletedJun 2017May 2017
Aqualily Phase 2C1 Block C5MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300224CompletedMar 2017Mar 2016
LartistaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 01821CompletedSep 2016Sep 2016
Avadi Phase IBlock No 84 WARD No 1 Paruthipattu Village Avadi Municipality Taluka Poonamallee604CompletedJun 2016Late, Apr 2017
Nova- Phase 1MAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 21 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002357CompletedMay 2016Mar 2016
IRIS Court Phase 3BMAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 60300296CompletedMar 2016Mar 2016
AntheiaMahindra Lifespace Developers Ltd Mahindra Towers 5th Floor Dr G M Bhosale Marg Worli Mumbai 400 018516CompletedMar 2016Late, Oct 2016
BloomdaleMahindra Bloomdale Project MIHAN SEZ DeNotified Area Beside D Y Patil International School Khapri Nagpur 441108342CompletedMar 2016Late, Jan 2017
Aqualily Phase 2C1 Block C6MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300228CompletedDec 2015Late, Mar 2016
IRIS Court Phase 2 Block C DMAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 60300296CompletedSep 2015Mar 2015
Aqualily phase 2C1 Block C3 C4MAHINDRA RESIDENTIAL DEVELOPERS LIMITED PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300256CompletedSep 2015Late, Mar 2016
Aqualily Phase 2C1-Block C1 C2PLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300256CompletedSep 2015Late, Mar 2016
IRIS Court Phase 3AMAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002133CompletedMar 2015Mar 2015
IRIS Court Phase 2 Block EMAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002133CompletedMar 2015Mar 2015
Aura PH5Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex150CompletedJan 2015Late, Sep 2016
Aura PH4Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex142CompletedJan 2015Late, Dec 2015
Aqualily Phase 2BPLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 603002178CompletedNov 2014Nov 2014
Aqualil Phase 1C 1DPLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300277CompletedOct 2014Oct 2014
Aura PH3Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex110CompletedJun 2014Late, Aug 2015
Aura PH2Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex166CompletedNov 2013Late, Oct 2014
Aqualily Phase 2APLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300280CompletedNov 2013Nov 2013
Splendour Phase 2CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP W MUMBAI 400078233CompletedNov 2013Nov 2013
Aqualily Phase 1BPLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300233CompletedOct 2013Oct 2013
Iris Court Phase IMAHINDRA INTEGRATED TOWNSHIP LIMITED Plot no 18 Near Paranur Railway Station Mahindra World City Chengalpet Taluk Kanchepuram Dist Tamil Nadu 603002244CompletedJun 2013Late, Dec 2013
Aura PH1Village Chauma Sector 110A Gurgaon 122017 Manesar Urban Complex231CompletedMay 2013Late, Oct 2014
AngelicaBldg C on plot bearing cts no 899 A TO E of village pahadi goregaon S V Road Mumbai67CompletedMar 2013Mar 2013
AspenBldg A on plot bearing cts no. 899 A TO E of village pahadi goregaon S. V. Road Mumbai68CompletedDec 2012Dec 2012
Aqualily Phase 1APLOT 33 1st CROSS ROAD 1st MAIN ROAD MAHINDRA WORLD CITY CHENGALPET TALUK KANCHEPURAM DIST TAMIL NADU 60300241CompletedOct 2012Oct 2012
Splendour Phase 1CTS NO 617 part 617 30 617 39 PLOT B L B S Marg BHANDUP WEST MUMBAI 400078265CompletedOct 2011Oct 2011
ChlorisMilestone 16 3 Sector 19 Faridabad160CompletedJul 2011Jul 2011

How this compares with Nagpur

13%of Nagpur projects moved their completion datethis one moved by 24 months
22%of Nagpur registrations have lapsed or been cancelledthis one is completed

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bloomdale Duplex Home 6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Khapri2,800+ in Nagpur

2 kmBloomdale Duplex Home 6Completed 12Other 9Dot size: filed unitsN

Filed coordinates, straight-line distance. 21 registered projects within 2 km.

Builder: Mahindra Bebanco Developers Limited

Mahindra Bebanco Developers Limited has 19 registrations on MahaRERA, including Bloomdale Building 04 and Bloomdale Bloomdale 07. Its filings disclose 37 earlier MahaRERA projects: declares 25 of 37 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if Bloomdale Duplex Home 6 is delayed beyond 30 Mar 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bloomdale Duplex Home 6?

The registered promoter entity is Mahindra Bebanco Developers Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bloomdale Duplex Home 6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Bloomdale Duplex Home 6?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Bloomdale Duplex Home 6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bloomdale Duplex Home 6?

The professionals named in the filing: Architect: Architect Hafeez Contractor; Engineer: Synergy Property Development Services Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bloomdale Duplex Home 6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bloomdale Duplex Home 6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bloomdale Duplex Home 6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.