ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Bliss

Completed No litigation declared Residential / Group Housing project

Bliss

By Advait Builders & Developers

RG-MH-69662 · RERA P51800048293 · Last updated on MahaRERA portal: 8 Jul 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promisedregistration recorded completed
2 of 11Construction stages donefurthest along: Basement (if any), 90%
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Bliss is a Residential / Group Housing project by Advait Builders & Developers in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800048293 on 22 Dec 2022. The registration is recorded completed; possession was promised by 31 Dec 2025.

At a glance

Project

  • NameBliss
  • TypeResidential / Group Housing
  • Location
    • Nehru Nagar
    • Kurla East
    • Kurla
    • Mumbai Suburban
    • 400024
  • Pincode400024
  • RERA no.P51800048293
  • ReraGenie IDRG-MH-69662

Builder

  • NameAdvait Builders & Developers
  • Entity typePartnership
  • PartnersAshish Umesh Sakhare, Shrikant Krishna Jambhulkar, Tushar Shrikrishna Khatu
  • Other registrations2 more →
  • Completed3 of 3

Key dates

this monthRegisteredDec 2022PromisedDec 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Dec 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed78 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building No - 136NA1817000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 90%.

Building No - 136: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 8 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed32

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots32
Closed/Covered32

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,118 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Vishal Co Operative Housing Society LimitedKurlaMumbai Suburban

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI8485.23
Proposed, not sanctioned8,119 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAnchorage Building 170/171 Central Avenue Chembur - 400071

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
EngineerS K Consultants & Engineers
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Advait Builders & Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Nov 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Jul 2025

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: s.pdf8 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bliss as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 31-03-2025.pdf20 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bliss as on March 2025.pdf20 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 31-12-2024.pdf16 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on 31-12-2024.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-RERA 136 BLISS.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bliss Sep 2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 30-09-2024_compressed.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on Sept 2024.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Bliss Sep 2024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on June 2024.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 30-06-2024.pdf19 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Bliss 136.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bliss as on June 2024.pdf15 Jul 2024
Layout approvalFile: Plan 1.pdf28 Jun 2024
Building plan approvalFile: Plan 2_rotated_rotated.pdf28 Jun 2024
Building plan approvalFile: Plan 3_rotated_rotated.pdf28 Jun 2024
Building plan approvalFile: Plan 4_rotated_rotated.pdf28 Jun 2024
Building plan approvalFile: Plan 5.pdf28 Jun 2024
Building plan approvalFile: Plan 6.pdf28 Jun 2024
Copy of Layout Approval (in case of layout)File: Plan 1.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 2_rotated_rotated.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 3_rotated_rotated.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 4_rotated_rotated.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 5.pdf28 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6.pdf28 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC - Bliss.pdf28 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bliss as on March 2024.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bliss as on March 2024.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Bliss.pdf12 Apr 2024
Proforma of Agreement for saleFile: Draft Agreement Sale - Bliss.pdf13 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on Dec 2023.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 31-12-2023.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bliss as on Dec 2023.pdf15 Jan 2024
Building plan approvalFile: Page 1 to 3.pdf24 Nov 2023
Building plan approvalFile: Page 4 to 6.pdf24 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 1 to 3.pdf24 Nov 2023
Building Plan Approval / NA Order for plotted developmentFile: Page 4 to 6.pdf24 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Bliss Building No 136 as on September 2023.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on September 2023.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bliss as on 30-09-2023.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: New Format Form 5 Bliss.pdf25 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on June 2023.pdf3 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Bliss as on 30-06-2023.pdf3 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Bliss.pdf28 Jul 2023
Disclosure of sold/ booked inventoryFile: Bliss Project Inventory details.pdf14 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on December 2022.pdf3 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Bliss as on March 2023.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Bliss as on December 2022.pdf3 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Bliss as on March 2023.pdf3 Jun 2023
Details of encumbrances concerned to FinanceFile: Encumbrance Letter -Bliss.pdf16 May 2023
Details of encumbrances concerned to LegalFile: Encumbrance Letter -Bliss.pdf16 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architech Certificate -Bldg No136.pdf29 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BLISS-2.pdf24 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: CC Revalidation - Bliss.pdf3 Dec 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Finance.pdf28 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter- Finance.pdf28 Nov 2022
Layout approvalFile: Plan - 136.pdf17 Nov 2022
Building plan approvalFile: Plan - 136.pdf17 Nov 2022
Copy of the legal title reportFile: MahaRERA Title Bliss.pdf17 Nov 2022
Copy of Layout Approval (in case of layout)File: Plan - 136.pdf17 Nov 2022
Building Plan Approval / NA Order for plotted developmentFile: Plan - 136.pdf17 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 - Bliss.pdf17 Nov 2022
Proforma of Allotment letterFile: Final Draft Allotment Letter-136 15-11-22.pdf17 Nov 2022
Proforma of Agreement for saleFile: Final Agreement for sale-136 -15-11-2022.pdf17 Nov 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Bliss.pdf17 Nov 2022
CERSAI detailsFile: CERSAI_Search_Report_200252257889_For_Asset_Based_Search_15_11_2022_16_14_57_976.pdf15 Nov 2022
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter ( Bliss).pdf15 Nov 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement For Sale ( Bliss)_compressed (1).pdf15 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Finance.pdf11 Nov 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter - Legal.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Finance.pdf11 Nov 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter - Legal.pdf11 Nov 2022
Declaration about Commencement CertificateFile: Declaration About Commencement Certificate (Format -D).pdf11 Nov 2022
Declaration in FORM BFile: Affidavit Cum Declaration ( Rera) Advait.pdf11 Nov 2022
PAN CardFile: Pancard Advait Builders.pdf8 Nov 2022
Commencement Certificates / NA Order for plotted developmentFile: Bldg No 136 CC.pdf8 Nov 2022

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bliss on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kurla East6,700+ in Mumbai Suburban

Builder: Advait Builders & Developers

Advait Builders & Developers has 3 registrations on MahaRERA, including 78 East and Eternal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Bliss is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bliss?

The registered promoter entity is Advait Builders & Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bliss?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bliss?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bliss?

The professionals named in the filing: Engineer: S K Consultants & Engineers; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bliss?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bliss. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bliss to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.