Home / Browse projects / Pune, Maharashtra / BLISS FIELDS-PHASE-I

Registered No litigation declared Plotted project

BLISS FIELDS-PHASE-I

By SAI SHRADDHA VENTURE

RG-MH-07469 · RERA P52100077073 · Last updated on MahaRERA portal: 22 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
28 of 136Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 103 documents Report an error

BLISS FIELDS-PHASE-I is a Plotted project by SAI SHRADDHA VENTURE in Pune, Maharashtra, registered with MahaRERA as P52100077073 on 23 Jul 2024. Possession is promised by 31 Oct 2026. The completion date has moved by 10 months from the original filing. 108 of the 136 units on this registration are recorded sold or booked.

At a glance

Project

  • NameBLISS FIELDS-PHASE-I
  • TypePlotted
  • Location
    • GAT NO 1
    • ZENDEWADI
    • Purandhar
    • Pune
    • 412301
  • Pincode412301
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100077073
  • ReraGenie IDRG-MH-07469

Builder

  • NameSAI SHRADDHA VENTURE
  • Entity typePartnership
  • PartnersKAVITA LOKHANDE, NAVNATH LOKHANDE, SOMNATH LOKHANDE, RANI LOKHANDE, KALPANA LOKHANDE, SANDHYA LIMBHORE

Key dates

this monthRegisteredJul 2024First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Jul 2024
  • Promised completion31 Oct 2026
  • Revised completionRevised to 31 Oct 2026 (originally 31 Dec 2025)
  • BuildingsNot stated in filing
  • Documents filed103 files

Current status

79%108 of 136 units booked

Figures as on 22 Jun 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 22 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes95%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes95%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area40,697 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on25 Dec 2025

Approvals and building plan

Sanctioning authorityPMRDA

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop 1A, 1Band 2, City Point, Pune Saswad Road, Bhekrai Nagar, Fursungi Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANOHAR YERAWAR
EngineerShubham Kamthe
Chartered AccountantT J Unecha & Co
Chartered AccountantSWAPNIL R UNECHA & ASSOCIATES
PartnerRole in project
SAI SHRADDHA VENTURE-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA30122519128Dec 2025 → Oct 2026

Reason as filed by the promoterThe project was originally registered on the basis of the Commencement Certificate, with the declared completion date of 31/12/2025. Subsequently, demarcation of the project land was proposed, pursuant to which a government survey was required and duly applied for. Despite the promoter having followed up and having waited for a considerable period, the government survey has not been completed within the stipulated time and is still pending with the concerned government surveyor. The said delay is entirely attributable to the statutory authority and is beyond the control of the promoter, and no

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Jul 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 30 May 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Oct 2026

Documents filed103

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 103 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 (MAR-26).pdf22 Jun 2026
Withdrawal Update Form 2File: FORM-2 (MAR-26).pdf22 Jun 2026
Withdrawal Update Form 3File: FORM-3 (MAR-26).pdf22 Jun 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf17 Feb 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf17 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3 Dec 25 Final.pdf17 Feb 2026
Withdrawal Update Form 3File: FORM 3 Dec 25 Final.pdf17 Feb 2026
Form 1File: Form 1 ( Sep 24 ).pdf17 Dec 2025
Form 2File: Form 2 ( sep 24 ).pdf17 Dec 2025
Form 3File: Form 3 ( Sep 24 ).pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory September 2024.pdf17 Dec 2025
Self-declaration of Quarterly ProgressFile: Self Declaration September 2024.pdf17 Dec 2025
Form 1File: Form 1 ( Dec 24 ).pdf17 Dec 2025
Form 2File: Form 2 ( Dec 24 ).pdf17 Dec 2025
Form 3File: Form 3 ( Dec 24 ).pdf17 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold Inventory December 2024.pdf17 Dec 2025
Self-declaration of Quarterly ProgressFile: Self Declaration December 2024.pdf17 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A ( March 25 )..pdf17 Dec 2025
Form 5 (FY 2024-2025)File: Form 5.pdf17 Dec 2025
Form 1File: form 1 march 25.pdf16 Dec 2025
Form 2File: Form 2 march 25.pdf16 Dec 2025
Form 3File: FORM 3 MAR 25-merged_compressed.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory Status MAR 25.pdf16 Dec 2025
Self-declaration of Quarterly ProgressFile: Self Declaration March 2025.pdf16 Dec 2025
Form 1File: form 1 june 25.pdf16 Dec 2025
Form 2File: form 2 june 25.pdf16 Dec 2025
Form 3File: FORM 3 JUN 25_compressed.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory JUN 25.pdf16 Dec 2025
Self-declaration of Quarterly ProgressFile: Self Declaration June 2025.pdf16 Dec 2025
Form 1File: form 1 sep 25.pdf16 Dec 2025
Form 2File: form 2 sep 25.pdf16 Dec 2025
Form 3File: FORM 3 SEP 25_compressed.pdf16 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Inventory SEP 25.pdf16 Dec 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Sept 2025.pdf16 Dec 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate Dec24.pdf1 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 Architect Certificate Dec24.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 31Dec CA Certificate_compressed.pdf1 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Engineer Certificate Dec24.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 Engineer Certificate Dec24.pdf1 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2 Engineer Certificate Dec24.pdf1 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE FORM 3 311224 for Upload.pdf18 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31122024 F 1.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECH CERTIFICATE 30092024 F 1.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE 612025.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENG CERTIFICATE 6122024.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: CA CERTIFICATE FORM 3.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY FOR SEP DEC 24_compressed.pdf21 Feb 2025
Deviation Report with respect to model copy of AgreementFile: Articles of agreement f.pdf17 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 revised.pdf19 Jul 2024
Other - FinanceFile: Form 3 revised.pdf19 Jul 2024
Layout approvalFile: Layout 5 - converted.pdf18 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 5 - converted.pdf18 Jul 2024
Declaration about Commencement CertificateFile: Form D revised.pdf18 Jul 2024
Other - TechnicalFile: Plot Details.pdf18 Jul 2024
Other - TechnicalFile: Form D revised.pdf18 Jul 2024
Proforma of Agreement for saleFile: Agreement - converted.pdf12 Jul 2024
Deviation Report with respect to model copy of AgreementFile: No Deviation.pdf12 Jul 2024
Other - LegalFile: Email from Authority about CC.pdf12 Jul 2024
Other - TechnicalFile: Email from Authority about CC.pdf12 Jul 2024
Layout approvalFile: Layout 1.pdf2 Jul 2024
Layout approvalFile: Layout 2 - converted.pdf2 Jul 2024
Layout approvalFile: Layout 3 - converted.pdf2 Jul 2024
Layout approvalFile: Layout 4 - converted.pdf2 Jul 2024
Layout approvalFile: Layout 5 - converted.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 1.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 2 - converted.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 3 - converted.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 4 - converted.pdf2 Jul 2024
Copy of Layout Approval (in case of layout)File: Layout 5 - converted.pdf2 Jul 2024
Other - TechnicalFile: SALE DEED 5-4-2024-compressed - converted-pages-1.pdf2 Jul 2024
Other - TechnicalFile: SALE DEED 5-4-2024-compressed - converted-pages-2.pdf2 Jul 2024
Other - TechnicalFile: SALE DEED 5-4-2024-compressed - converted-pages-3.pdf2 Jul 2024
Other - TechnicalFile: फेरफाराची नोटीस.pdf2 Jul 2024
Other - TechnicalFile: Declaration About CC.pdf2 Jul 2024
Proforma of Allotment letterFile: Allotment letter - converted.pdf25 Jun 2024
Other - LegalFile: फेरफाराची नोटीस.pdf25 Jun 2024
Copy of the legal title reportFile: Legal Title Report.pdf19 Jun 2024
Details of encumbrances concerned to FinanceFile: Legal Encumbrance Report - Promoter.pdf19 Jun 2024

How this compares with Pune

79%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 10 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BLISS FIELDS-PHASE-I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ZENDEWADI13,700+ in Pune

2 kmBLISS FIELDS-PHASE-ILapsed / revoked 2Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 7 registered projects within 2 km.

Builder: SAI SHRADDHA VENTURE

SAI SHRADDHA VENTURE has 1 registration on MahaRERA, including BLISS FIELDS-PHASE-I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BLISS FIELDS-PHASE-I is delayed beyond 31 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BLISS FIELDS-PHASE-I?

The registered promoter entity is SAI SHRADDHA VENTURE, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BLISS FIELDS-PHASE-I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BLISS FIELDS-PHASE-I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BLISS FIELDS-PHASE-I?

The professionals named in the filing: Architect: MANOHAR YERAWAR; Engineer: Shubham Kamthe; Chartered Accountant: T J Unecha & Co; Chartered Accountant: SWAPNIL R UNECHA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BLISS FIELDS-PHASE-I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BLISS FIELDS-PHASE-I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BLISS FIELDS-PHASE-I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.