Home / Browse projects / Palghar, Maharashtra / BLDG NO 1
BLDG NO 1
By M/s AMEYA BUILDERS & PROPERTY DEVELOPERS
RG-MH-51294 · RERA P99000046786 · Last updated on MahaRERA portal: 1 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BLDG NO 1 is a Others project by M/s AMEYA BUILDERS & PROPERTY DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000046786 on 10 Sep 2022. Possession is promised by 31 Dec 2027. 0 of the 110 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.
At a glance
Project
- NameBLDG NO 1
- TypeOthers
- Location
- NEAR VIRAR RAILWAY STATION
- MAYEKAR WADI
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000046786
- ReraGenie IDRG-MH-51294
Builder
- NameM/s AMEYA BUILDERS & PROPERTY DEVELOPERS
- Entity typePartnership
- PartnersRAJEEV YASHWANT PATIL, MORESHWAR KRUSHNA BARIA, UPESH MORESHWAR BARIA, UDAY MORESHWAR BARIA
- Other registrations4 more →
- Completed3 of 5
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on10 Sep 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed113 files
Current status
Figures as on 1 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 1 | NA | 16 | 16 | 90 | 20 | 110 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.
1: 0% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed188
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| 1 | NA | Rs 26.34 cr | - |
| - | NA | Rs 34.05 lakh | - |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr. Abhay Damodar Raut |
| Architect | ABHAY DAMODAR RAUT |
| Architect | Kuldeep Bharat Patil |
| Engineer | Mr. Paresh Ramniklal Unnarkar |
| Engineer | PARESH UNNARKAR |
| Chartered Accountant | Brijesh Sampat |
| Chartered Accountant | BRIJESH DEVENDRA SAMPAT |
| Chartered Accountant | MUKUND TRIMBAK PHADNIS |
| Chartered Accountant | HBK & ASSOCIATES LLP |
| Partner | Role in project |
|---|---|
| M/s AMEYA BUILDERS & PROPERTY DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 26 Jul 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 26 Jul 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 26 Jul 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed113
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 11042026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 11042026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPIRE 310326.pdf | 1 Jun 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPIRE 310326.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 EMPIRE 21052026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 3File: FORM 3 EMPIRE 21052026.pdf | 1 Jun 2026 |
| Withdrawal Update Form 1File: FORM 1 11042026.pdf | 23 May 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPIRE 310326.pdf | 23 May 2026 |
| Withdrawal Update Form 3File: FORM 3 EMPIRE 21052026.pdf | 23 May 2026 |
| Withdrawal Update Form 1File: FORM 1 03022026.pdf | 1 Mar 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPIRE - 31122025.pdf | 1 Mar 2026 |
| Withdrawal Update Form 3File: FORM NO 3 100226.pdf | 1 Mar 2026 |
| Withdrawal Update Form 1File: FORM 1 03022026.pdf | 25 Feb 2026 |
| Withdrawal Update Form 2File: FORM 2 EMPIRE - 31122025.pdf | 25 Feb 2026 |
| Withdrawal Update Form 3File: FORM NO 3 100226.pdf | 25 Feb 2026 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 23.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 23.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 04.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 04.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 1124.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 2105.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 1106.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 11 06.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 1124.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 3110.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 2111.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 21 11.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 1124.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 3110.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 2111.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 21 11.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 3112.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 3112.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 0801.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 08 01 2025.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 31032025.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 31032025.pdf | 20 Oct 2025 |
| Form 3File: FORM NO 3 24042025.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 24 04 2025.pdf | 20 Oct 2025 |
| Form 1File: FORM 1 30 06 25.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 30062025.pdf | 20 Oct 2025 |
| Form 3File: FORM 3 23 08 2025.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 24 04 2025.pdf | 20 Oct 2025 |
| Form 1File: Inventories 08 10 2025.pdf | 20 Oct 2025 |
| Form 2File: FORM 2 30 09 2025.pdf | 20 Oct 2025 |
| Form 3File: FORM 3 23 08 2025.pdf | 20 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventories 08 10 2025.pdf | 20 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE FORM NO 3 24042025.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 31032025.pdf | 7 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 31032025.pdf | 7 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE EMPIRE.pdf | 8 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 8 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A FORM 3 EMPIRE.pdf | 23 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE FORM 1.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BLDG NO 1.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf | 12 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf | 12 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3.pdf | 12 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 113 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BLDG NO 1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MAYEKAR WADI3,200+ in Palghar
Filed coordinates, straight-line distance. 182 registered projects within 2 km.
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: M/s AMEYA BUILDERS & PROPERTY DEVELOPERS
M/s AMEYA BUILDERS & PROPERTY DEVELOPERS has 5 registrations on MahaRERA, including BLDG NO-16 VIOLET and BLDG NO-3 ROSE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if BLDG NO 1 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BLDG NO 1?
The registered promoter entity is M/s AMEYA BUILDERS & PROPERTY DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BLDG NO 1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BLDG NO 1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BLDG NO 1?
The professionals named in the filing: Architect: Mr. Abhay Damodar Raut; Architect: ABHAY DAMODAR RAUT; Architect: Kuldeep Bharat Patil; Engineer: Mr. Paresh Ramniklal Unnarkar; Engineer: PARESH UNNARKAR; Chartered Accountant: Brijesh Sampat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BLDG NO 1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback