Red flags
- Registration lapsed
- Possession 4 months past the filed date
- Completion date moved by 3 months
- 1 extension taken
- Rs 30.00 crore secured on the land, in favour of KARUR VYSYA BANK
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BLA BUSINESS PARK is a Commercial project by BLA Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049334 on 7 Feb 2023. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 3 months from the original filing. 77 of the 115 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameBLA BUSINESS PARK
- TypeCommercial
- Location
- Sonawala Road
- C.T.S. No. 492/A
- 492/A/1
- 492/A/2
- 492/A/3
- 492/A/4
- 492/B
- Pahadi-Goregaon
- Borivali
- Mumbai Suburban
- 400063
- Pincode400063
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800049334
- ReraGenie IDRG-MH-67513
Builder
- NameBLA Developers LLP
- Entity typePartnership
- PartnersAnubhav Agarwal, Anurag Agarwal
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Feb 2023
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Mar 2026)
- Buildings1 building record
- Documents filed96 files
Current status
Figures as on 7 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BLA BUSINESS PARK | NA | 21 | 20 | 114 | 1 | 115 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
BLA BUSINESS PARK: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed132
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BLA BUSINESS PARK | NA | Rs 40.00 cr | Rs 40.00 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | REZA KABUL ARCHITECTS PVT. LTD. |
| Architect | YOMESH NARAYAN RAO |
| Engineer | JW CONSLTANTS |
| Engineer | GLOBERA CONSULTANCY PRIVATE LIMITED |
| Engineer | ER MAHAVIR THAKAN |
| Chartered Accountant | KOCHAR & ASSOCIATES |
| Chartered Accountant | JAIN VIJENDRA AND CO |
| Partner | Role in project |
|---|---|
| BLA Developers LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Dec 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 23 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_ MARCH 26_ BLA BUSINESS PARK.pdf | 7 May 2026 |
| Withdrawal Update Form 2File: FORM 2_ MARCH 26_ BLA BUSINESS PARK.pdf | 7 May 2026 |
| Withdrawal Update Form 3File: FORM 3_ MARCH 26_ BLA BUSINESS PARK_compressed.pdf | 7 May 2026 |
| Withdrawal Update Form 1File: FORM 1_ DEC 25_ BLA BUSINESS PARK.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_ DEC 25_ BLA BUSINESS PARK.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3_ SEP 25_ BLA BUSINESS PARK_compressed.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1_ SEP 25_ BLA BUSINESS PARK.pdf | 10 Oct 2025 |
| Withdrawal Update Form 2File: FORM 2_ SEP 25_ BLA BUSINESS PARK.pdf | 10 Oct 2025 |
| Withdrawal Update Form 3File: FORM 3_ SEP 25_ BLA BUSINESS PARK_compressed.pdf | 10 Oct 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A_ MARCH 25_ BLA BUSINESS PARK.pdf | 10 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 BLA DEV March 2025.pdf | 3 Oct 2025 |
| Form 1File: FORM 1_ JUNE 25_ BLA BUSINESS PARK.pdf | 18 Jul 2025 |
| Form 2File: FORM 2_ JUNE 25_ BLA BUSINESS PARK.pdf | 18 Jul 2025 |
| Form 3File: FORM 3_ JUNE 25_ BLA BUSINESS PARK_compressed.pdf | 18 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD_ JUNE 25_ BLA BUSINESS PARK.pdf | 18 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ MARCH 25.pdf | 17 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_ MARCH 25_compressed.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ MARCH 25.pdf | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD_ MARCH 25.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 DEC 2024.pdf | 16 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 Dec 2024_compressed.pdf | 16 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - Engineer's Certificate Dec 24.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD STATEMENT DEC 2024.pdf | 16 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A BLA Developers LLP March 2024.pdf | 8 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ SEP 24.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ SEP 24_compressed.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ SEP 24.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ SEP 24.pdf | 15 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1_ JUNE 24.pdf | 17 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2_ JUNE 24.pdf | 17 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: 4 SOLD UNSOLD_ JUNE 24.pdf | 17 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3_ JUNE 24_compressed.pdf | 17 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 11411 FurtherCC_signed.pdf | 17 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 copy.pdf | 21 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 19 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 19 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 19 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 09022024 CC ABOVE 10TH FLOOR.pdf | 9 Feb 2024 |
| Details of encumbrances concerned to FinanceFile: BLA packaging Encumbrances 13012024.pdf | 15 Jan 2024 |
| Details of encumbrances concerned to LegalFile: BLA packaging Encumbrances 13012024.pdf | 15 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 12 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 12 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 13 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 13 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold unsold_compressed.pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3_compressed.pdf | 13 Oct 2023 |
| Building plan approvalFile: PLANS NEW-1.pdf | 19 Jul 2023 |
| Building plan approvalFile: PLANS NEW-2.pdf | 19 Jul 2023 |
| Building plan approvalFile: PLANS NEW-3.pdf | 19 Jul 2023 |
| Building plan approvalFile: PLANS NEW-4.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS NEW-1.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS NEW-2.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS NEW-3.pdf | 19 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: PLANS NEW-4.pdf | 19 Jul 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Approved fcc to 10th floor signed .pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 12 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 12 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD _compressed.pdf | 12 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 12 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A-BLA BUSINESS PARK_22-23.pdf | 29 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5-BLA BUSINESS PARK_22-23.pdf | 29 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-BLA BUSINESS PARK_MAR 23.pdf | 13 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-BLA BUSINESS PARK_MAR 23.pdf | 13 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD-BLA BUSINESS PARK_MAR 23_compressed.pdf | 13 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-BLA BUSINESS PARK_MAR 23.pdf | 13 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A disclosure of interest_compressed.pdf | 30 Jan 2023 |
| Proforma of Agreement for saleFile: AFS NEW.pdf | 27 Jan 2023 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATION AGREEMENT FOR SALE.pdf | 27 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to finance 492.pdf | 13 Jan 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance to legal 492.pdf | 13 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance to finance 492.pdf | 13 Jan 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance to legal 492.pdf | 13 Jan 2023 |
| Copy of the legal title reportFile: titlw new draft.pdf | 28 Dec 2022 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER.pdf | 28 Dec 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION_ALLOTMENT.pdf | 28 Dec 2022 |
| Layout approvalFile: Concession Drawing_1-1.pdf | 23 Dec 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BLA BUSINESS PARK on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near C.T.S. No. 492/A, 492/A/1, 492/A/2, 492/A/3, 492/A/4, 492/B6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 333 registered projects within 2 km.
Elysian Tower C, D, E
Oberoi Realty Limited
Elysian Tower B
Oberoi Realty Limited
Elysian Tower A
Oberoi Realty Limited
Sheetal Sangam
DGS Township Pvt Ltd
SEJAL SQUARE
ALCHEMI DEVELOPERS PRIVATE LIMITED
Mehta Marquina 1978
Shreeram Builders
See every Mumbai Suburban project, with the district possession charts
Builder: BLA Developers LLP
BLA Developers LLP has 1 registration on MahaRERA, including BLA BUSINESS PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that BLA BUSINESS PARK shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BLA BUSINESS PARK is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BLA BUSINESS PARK?
The registered promoter entity is BLA Developers LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BLA BUSINESS PARK?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BLA BUSINESS PARK?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BLA BUSINESS PARK?
The professionals named in the filing: Architect: REZA KABUL ARCHITECTS PVT. LTD.; Architect: YOMESH NARAYAN RAO; Engineer: JW CONSLTANTS; Engineer: GLOBERA CONSULTANCY PRIVATE LIMITED; Engineer: ER MAHAVIR THAKAN; Chartered Accountant: KOCHAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BLA BUSINESS PARK?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback