Home / Browse projects / Mumbai Suburban, Maharashtra / BIZ POINT
BIZ POINT
RG-MH-65609 · RERA P51800009838 · Last updated on MahaRERA portal: 24 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- 1 complaint at MahaRERA
- Completion date moved by 60 months
- 2 extensions taken
- Rs 295.00 crore secured on the land, in favour of Karnatka Bank Ltd
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BIZ POINT is a Commercial project by N N DATAR & ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800009838 on 22 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 60 months from the original filing. 49 of the 111 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBIZ POINT
- TypeCommercial
- Location
- LAXMI NARYAN TEMPLE ROAD
- KURLA
- Mumbai Suburban
- 400086
- Pincode400086
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800009838
- ReraGenie IDRG-MH-65609
Builder
- NameN N DATAR & ASSOCIATES
- Entity typePartnership
- PartnersRAJIV NIRANJAN DATAR, ANAGHA NARENDRA DATAR, NAMITA NILKANT DATAR, NITA NITIN DATAR
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Aug 2017
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2022)
- Buildings1 building record
- Documents filed202 files
Current status
Figures as on 24 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| NIRMAN | NA | 17 | 17 | 0 | 111 | 111 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 99%.
NIRMAN: 90% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 98% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 99% |
Progress on shared amenities15
As on 24 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 98% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed50
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| NIRMAN | NA | Rs 34.63 cr | Rs 37.20 cr |
| - | NA | Rs 1.12 cr | Rs 80.00 lakh |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DEOLE BROS |
| Engineer | SHRIKHANDE CONSULTANCY |
| Engineer | Vivekanand Kulkarni |
| Engineer | Ace Project Management Consultant |
| Engineer | Rajiv Pratapchandra Johari |
| Chartered Accountant | S J Bajaria & Co. |
| Chartered Accountant | Nikhil D Shah & Co |
| Partner | Role in project |
|---|---|
| N N DATAR & ASSOCIATES | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoter1. DCPR 2034 - We had received permission for FSI =1 beyond plinth on 22nd April 2014. But due to introduction of fungible FSI, the parking requirement doubled as per the amended rules. We had to take all fresh permissions and NOCs from various departments incorporation fungible FSI and increased parking. We therefore applied for fresh concession from Hon. M.C. who was pleased to grant us in May 2018. Thereafter we took permission for 1.33 FSI on February 2018. DCPR 2034 was enforced and has become applicable to all ongoing projects seeking permission for balance Development potential of the p
Reason as filed by the promoterAs per the attachment
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000500411 | Mohd Shahid Mohd Sabir Siddiqui | N N Dattar & Associates | 08/05/2024 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Aug 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 31 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 31 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed202
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 202 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 Mar 26.pdf | 24 Jun 2026 |
| Withdrawal Update Form 2File: Form 2 Mar 26.pdf | 24 Jun 2026 |
| Withdrawal Update Form 3File: Form 3 Mar 26.pdf | 24 Jun 2026 |
| Form 2A (FY 2020-2021)File: Form 2A - March 21.pdf | 3 Apr 2026 |
| Form 2A (FY 2021-2022)File: Form 2A - March 22.pdf | 3 Apr 2026 |
| Form 2A (FY 2022-2023)File: Form 2A - March 23.pdf | 3 Apr 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf | 3 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 December 25.pdf | 18 Mar 2026 |
| Withdrawal Update Form 2File: Form 2 December 25.pdf | 18 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 December 25.pdf | 18 Mar 2026 |
| Withdrawal Update Form 1File: Form 1 - Sept 25.pdf | 2 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 - Sept 25.pdf | 2 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 - Sept 25.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: signed form 1 rera.pdf | 18 Aug 2025 |
| Withdrawal Update Form 2File: form no-2 jun 2025.pdf | 18 Aug 2025 |
| Withdrawal Update Form 3File: Form 3 - June 25 - Datar_compressed.pdf | 18 Aug 2025 |
| Form 1File: FORM NO-1 MARCH 25.pdf | 18 Jun 2025 |
| Form 2File: FORM NO-2 MARCH 25.pdf | 18 Jun 2025 |
| Form 3File: FORM NO 3 MARCH 25.pdf | 18 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD 310325.pdf | 18 Jun 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form No- 5 23-24.pdf | 12 Apr 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO 1 DEC 2024.pdf | 28 Mar 2025 |
| Certificates of CA (Form 3)File: Form no 3 december 2024.pdf | 28 Mar 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM NO 2 DEC 2024.pdf | 28 Mar 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no1 octo24.pdf | 22 Nov 2024 |
| Certificates of CA (Form 3)File: form 3 oct 2024_compressed.pdf | 22 Nov 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM NO-2 SEPT 2024.pdf | 22 Nov 2024 |
| CERSAI detailsFile: Declaration for CERSAI 20062024.pdf | 24 Jun 2024 |
| Certificates of CA (Form 3)File: Form-3 CA Certificate upto 31032024_compressed.pdf | 24 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in Other Real Estate Organization 20062024.pdf | 24 Jun 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration for Bank Account 20062024.pdf | 24 Jun 2024 |
| Declaration in FORM BFile: FOrm B.pdf | 19 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold_Booked Inventory Mar 24.pdf | 19 Jun 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no-1 March 24.pdf | 8 Jun 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No-2 April 2024.pdf | 8 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM-2A APRIL 2024.pdf | 8 Jun 2024 |
| Certificates of CA (Form 3)File: FORM NO 3 MARCH 2024_compressed.pdf | 8 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form No 2A.pdf | 9 May 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO-1 JAN 2024.pdf | 31 Jan 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form no-2 Dec 2023.pdf | 31 Jan 2024 |
| Certificates of CA (Form 3)File: Form no-3 Dec 2023_compressed.pdf | 31 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form -5 2022-2023.pdf | 23 Jan 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no-1 sept 23.pdf | 25 Nov 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no -2 sept23.pdf | 25 Nov 2023 |
| Certificates of CA (Form 3)File: FORM NO 3 SEPT 2023_compressed.pdf | 25 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no-1 july 2023.pdf | 5 Oct 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no-2 july 2023.pdf | 5 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form no 2A 22-23.pdf | 5 Oct 2023 |
| Certificates of CA (Form 3)File: form no-3 july 2023.pdf | 5 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no1 apr23.pdf | 12 Aug 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no 2 apr 23.pdf | 12 Aug 2023 |
| Certificates of CA (Form 3)File: form no3 apr23.pdf | 12 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: form 5 a.PDF | 25 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5.pdf | 25 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 13 Feb 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2.pdf | 13 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3.pdf | 13 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Discloser of Sold Inventory.pdf | 1 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM NO 1 .pdf | 25 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2, june22.pdf | 25 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form no 2 .pdf | 25 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 1, june22.pdf | 17 Jan 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form no1 sept22.pdf | 27 Oct 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form no2 sept22.pdf | 27 Oct 2022 |
| Certificates of CA (Form 3)File: form no-3 sept22.pdf | 27 Oct 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form no -5 2022.pdf | 27 Oct 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form No 1- Apr 2022.pdf | 28 May 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form No 2.pdf | 28 May 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form No 2A.pdf | 28 May 2022 |
| Certificates of CA (Form 3)File: Form No 3.pdf | 28 May 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form no-1 JAN 22.pdf | 31 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form no-2 Jan 22.pdf | 31 Mar 2022 |
| Certificates of CA (Form 3)File: Form No 3 Jan 22_compressed.pdf | 31 Mar 2022 |
| Certificates of CA (Form 5)File: Form 5.pdf | 28 Dec 2021 |
| Certificates of CA (Form 3)File: Form 3 - Sep 21.pdf | 1 Nov 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form no 1 - Sep 21.pdf | 29 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Sep 21.pdf | 29 Oct 2021 |
| Certificates of CA (Form 3)File: Form 3 - Sep 21.pdf | 29 Oct 2021 |
| Layout approvalFile: PLAN 110121-1.pdf | 16 Aug 2021 |
| Layout approvalFile: PLAN 110121-2.pdf | 16 Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 202 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BIZ POINT on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near KURLA6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 292 registered projects within 2 km.
Atul Life Phase I
ATUL PROJECTS INDIA PVT LTD
SERENE CITY
SANGHVI BUILDTECH LLP
Neelyog Regent
Ratan Builders
Imperial Indrapuram B & C
Imperial Global Infra
HERITAGE AHURA RESIDENCY
KERSI JAMSHED RANDERIA
O AND S BUSINESS SUITES
SUCHITA ORANGE HDM PROJECT
See every Mumbai Suburban project, with the district possession charts
Builder: N N DATAR & ASSOCIATES
N N DATAR & ASSOCIATES has 1 registration on MahaRERA, including BIZ POINT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if BIZ POINT is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BIZ POINT?
The registered promoter entity is N N DATAR & ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BIZ POINT?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BIZ POINT?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BIZ POINT?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BIZ POINT?
The professionals named in the filing: Architect: DEOLE BROS; Engineer: SHRIKHANDE CONSULTANCY; Engineer: Vivekanand Kulkarni; Engineer: Ace Project Management Consultant; Engineer: Rajiv Pratapchandra Johari; Chartered Accountant: S J Bajaria & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BIZ POINT?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback