ReraGenieLog inGet a buyer report

Home / Browse projects / Sangli, Maharashtra / BHOSALE EMPIRE

Completed No litigation declared Others project

BHOSALE EMPIRE

By BHOSALE DEVELOPERS

RG-MH-85333 · RERA P53100053023 · Last updated on MahaRERA portal: 26 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 3.00 crore secured on the land, in favour of The Ashta People co op bank limited Ashta
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
6 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 90%
36 of 47Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

BHOSALE EMPIRE is a Others project by BHOSALE DEVELOPERS in Sangli, Maharashtra, registered with MahaRERA as P53100053023 on 10 Oct 2023. The registration is recorded completed; possession was promised by 31 May 2026. 11 of the 47 units on this registration are recorded sold or booked, and 6 of 11 construction stages are filed complete.

At a glance

Project

  • NameBHOSALE EMPIRE
  • TypeOthers
  • Location
    • S T STAND ROAD NEAR MODERN BAKERY GAONBHAG SANGLI
    • DINANATH CHOWK
    • Miraj
    • Sangli
    • 416416
  • Pincode416416
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100053023
  • ReraGenie IDRG-MH-85333

Builder

  • NameBHOSALE DEVELOPERS
  • Entity typePartnership
  • Partnersyogesh sambhaji bhosale, SACHIN ANANDRAO BHOSALE

Key dates

this monthRegisteredOct 2023PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Oct 2023
  • Promised completion31 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed86 files

Current status

23%11 of 47 units booked
100.0%Work done, per cost certificate

Figures as on 26 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHOSALE EMPIRENA76331447

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.

BHOSALE EMPIRE: 71% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 26 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes80%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed52

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots52
Open Space52

Land and ownership6

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area605 sq m
Land owned byNot the promoter
Named landowners6
Encumbrance on the landDeclared present
Charge in favour ofThe Ashta People co op bank limited Ashta
Secured amountRs 3.00 crore
Declared on27 May 2025
LandownerVillageDistrict
SACHIN ANANDRAO BHOSALESangli Miraj Kupwad (M Corp.)Sangli
yogesh sambhaji bhosaleSangli Miraj Kupwad (M Corp.)Sangli
MANOJ SHAHAJI BHOSALESangli Miraj Kupwad (M Corp.)Sangli
SNEHAL SACHIN BHOSALESangli Miraj Kupwad (M Corp.)Sangli
amruta yogesh bhosaleSangli Miraj Kupwad (M Corp.)Sangli
PRAJWAL MAHESH CHAVANSangli Miraj Kupwad (M Corp.)Sangli

Approvals and building plan

Sanctioning authoritysangli miraj kupwad municipal corporation
Permissible FSI2552.05
Proposed, not sanctioned2,525 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCIVIL HOSPITAL ROAD SANGLI
Estimated costRs 3.65 cr
Cost incurredRs 3.65 cr
Work done100.0%
BuildingWingEstimatedIncurred
BHOSALE EMPIRENARs 3.40 crRs 3.40 cr
-NARs 25.00 lakhRs 25.00 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRUSHIKESH D PAWAR
Engineervikas laxman more
Chartered Accountantamit anil shende
Chartered AccountantMAHESH V THANEDAR
PartnerRole in project
BHOSALE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 24 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: FULL OC CERTIFICATE BHOSALE EMPIRE.pdf26 May 2026
Occupational CertificateFile: Bhosale Empire Full OC Rera email.pdf26 May 2026
Withdrawal Update Form 1File: FORM-1 31-03-26 .pdf25 May 2026
Withdrawal Update Form 2File: FORM-2 31-03-26.pdf25 May 2026
Withdrawal Update Form 3File: FORM-3 31-03-26 .pdf25 May 2026
Form 2A (FY 2025-2026)File: FORM-2A 31-03-26 .pdf25 May 2026
Form 5 (FY 2025-2026)File: FORM-5 31-03-26 .pdf23 May 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf12 May 2026
Withdrawal Update Form 1File: Form 1 31-12-2025.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf12 May 2026
Withdrawal Update Form 2File: Form 2 31-12-2025.pdf12 May 2026
Withdrawal Update Form 3File: Form 2 31-12-2025.pdf12 May 2026
Withdrawal Update Form 3File: Form 3 31-12-2025.pdf12 May 2026
Form 2A (FY 2024-2025)File: FORM -2A 24-25.pdf27 Dec 2025
Building plan approvalFile: BHOSALE EMPIRE REVISED SANCTION DRAWING.pdf24 Dec 2025
Form 5 (FY 2024-2025)File: FORM-5 24-25.pdf17 Dec 2025
Withdrawal Update Form 1File: FORM-1 (Bhosle Empire) 30-9-25.pdf12 Dec 2025
Withdrawal Update Form 2File: FORM-2 (Bhosle Empire) 30-9-25.pdf12 Dec 2025
Withdrawal Update Form 3File: FORM-3 (Bhosle Empire) 30-9-25.pdf12 Dec 2025
Withdrawal Update Form 1File: FORM-1 29-7-25 (BHOSLE EMPIRE).pdf10 Oct 2025
Withdrawal Update Form 2File: FORM-2 01-8-25 (BHOSLE EMPIRE).pdf10 Oct 2025
Withdrawal Update Form 3File: FORM-3 02-8-25 (BHOSLE EMPIRE).pdf10 Oct 2025
Withdrawal Update Form 1File: Withdrawal Application Form1 upto 31032025 with sign.pdf3 Jun 2025
Withdrawal Update Form 2File: FORM -2.pdf3 Jun 2025
Withdrawal Update Form 3File: FORM-3 (2).pdf3 Jun 2025
Form 1File: FORM-1.pdf5 May 2025
Form 2File: FORM-2.pdf5 May 2025
Form 3File: FORM-3.pdf5 May 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 31-12-24.pdf21 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 31-12-24.pdf21 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 31-12-24.pdf21 Feb 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf21 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD.pdf10 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM -5 12-11-24 .pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECTS CERTIFICATE.pdf9 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf9 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM -2A.pdf23 May 2024
Disclosure of sold/ booked inventoryFile: DISCLOSUR OF SOLD.pdf23 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf27 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM - 2.pdf27 Jan 2024
Disclosure of sold/ booked inventoryFile: DISLOSURE OF SOLD.pdf27 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM - 3.pdf27 Jan 2024
Other - FinanceFile: DAST.pdf27 Jan 2024
Other - TechnicalFile: Bhosale empire cc verification email NEW.pdf2 Oct 2023
Details of encumbrances concerned to FinanceFile: NON ENCUMBRANCE AERTIFICATE.pdf7 Jul 2023
Details of encumbrances concerned to LegalFile: NON ENCUMBRANCE AERTIFICATE.pdf7 Jul 2023
Other - LegalFile: DEVELOPMENT AGREEMENT.pdf20 Jun 2023
Other - LegalFile: POWER OF ATTORNY_BHOSALE FAMILY.pdf20 Jun 2023
Other - LegalFile: DEVELOPMENT AGREEMENT - PRAJWAL CHAVAN.pdf20 Jun 2023
Other - LegalFile: KULMUKHTYARPATRA PRAJWAL CHAVAN.pdf20 Jun 2023
Other - LegalFile: KHAREDIPATRA.pdf20 Jun 2023
Layout approvalFile: AMALGAMATION DWG.pdf19 Jun 2023
Building plan approvalFile: MUN DWG.pdf19 Jun 2023
PAN CardFile: PAN CARD - BHOSALE DEV.pdf19 Jun 2023
Copy of the legal title reportFile: SEARCH REPORT.pdf19 Jun 2023
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE CERTIFICATE - LEGAL.pdf19 Jun 2023
Details of encumbrances concerned to LegalFile: ENCUMBRANCE CERTIFICATE - LEGAL.pdf19 Jun 2023
Copy of Layout Approval (in case of layout)File: AMALGAMATION DWG.pdf19 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: MUN DWG.pdf19 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: BUILDING PERMISSION CERTIFICATE.pdf19 Jun 2023
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE2_compressed.pdf19 Jun 2023
Declaration in FORM BFile: FORM B.pdf19 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf19 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - ENGINEERS CERTIFICATE.pdf19 Jun 2023
CERSAI detailsFile: UNDERTAKING.pdf19 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERTIFICATE form 3 LATEST_compressed.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTREST IN OTHER REAL ESTATE ORG - YOGESH BHOSALE.pdf19 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE OF INTREST IN OTHER REAL ESTATE ORG 0- MANOJ BHOSALE.pdf19 Jun 2023

How this compares with Sangli

23%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is completed

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep BHOSALE EMPIRE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DINANATH CHOWK790+ in Sangli

2 kmBHOSALE EMPIRECompleted 29Lapsed / revoked 13Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 53 registered projects within 2 km.

Builder: BHOSALE DEVELOPERS

BHOSALE DEVELOPERS has 1 registration on MahaRERA, including BHOSALE EMPIRE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if BHOSALE EMPIRE is delayed beyond 31 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHOSALE EMPIRE?

The registered promoter entity is BHOSALE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHOSALE EMPIRE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHOSALE EMPIRE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHOSALE EMPIRE?

The professionals named in the filing: Architect: RUSHIKESH D PAWAR; Engineer: vikas laxman more; Chartered Accountant: amit anil shende; Chartered Accountant: MAHESH V THANEDAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHOSALE EMPIRE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHOSALE EMPIRE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHOSALE EMPIRE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.