Home / Browse projects / Mumbai Suburban, Maharashtra / BHOOMI PRARAMBH
BHOOMI PRARAMBH
By Bhoomi Shashwat Estate Pvt. Ltd.
RG-MH-05567 · RERA P51800051754 · Last updated on MahaRERA portal: 15 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHOOMI PRARAMBH is a Commercial project by Bhoomi Shashwat Estate Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051754 on 27 Jun 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 9 months from the original filing. 56 of the 76 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameBHOOMI PRARAMBH
- TypeCommercial
- Location
- LINK ROAD
- BORIVALI WEST
- Borivali
- Mumbai Suburban
- 400091
- Pincode400091
- RERA no.P51800051754
- ReraGenie IDRG-MH-05567
Builder
- NameBhoomi Shashwat Estate Pvt. Ltd.
- Entity typeCompany
- DirectorsAjay Champaklal Mehta, Akshay Jayantilal Doshi, Bhushan Champaklal Mehta, Shail Bhushan Mehta, Samyak Akshay Doshi, Samarth Jayesh Doshi, Chaitya Ajay Mehta, Nirav Bhushan Mehta
- Other registrations2 more →
- Completed1 of 3
- No longer live1 lapsed, de-registered or revoked
- Declared earlier projects3 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on27 Jun 2023
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 31 Mar 2025)
- Buildings1 building record
- Documents filed115 files
Current status
Figures as on 15 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 8 | 7 | 0 | 76 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
WING A: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 80% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed51
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHREE VISHRAMYOG CHS LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 28.41 cr | Rs 17.30 cr |
| - | NA | Rs 1.50 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | PREMAL GOGRI |
| Engineer | Vihang Shah |
| Chartered Accountant | AMIT T JAIN AND CO |
| Chartered Accountant | MAYUR SINGHAL |
| Partner | Role in project |
|---|---|
| Bhoomi Shashwat Estate Pvt. Ltd. | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to heavy monsoon in early days & since our Project is abutting Metro Station, there are certain restriction laid down by Metro Authority on the construction activities, the Project was not able start on time hence it got delayed by few months. We would like to request you to further grant us extension for 9 (NINE) months i.e. the revised Project Completion Date would be 31.12.2025.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 1051/2022 | CITY CIVIL DINDOSHI | ONGOING |
| 58/2023 | CITY CIVIL DINDOSHI | ONGOING |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Apr 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf | 15 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf | 15 Jun 2026 |
| Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf | 15 Jun 2026 |
| Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf | 15 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Prarambh Form 3 March 25 (1).pdf | 29 Apr 2025 |
| 35 Bhoomi Prarambh FORM 2 | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: inventory.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Bhoomi Prarambh (3) (1).pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARC Prarambh.pdf | 13 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 Bhoomi Prarambh Form 2( Engineering Certificate) 040225 signed.pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi prarmbh sep 24 form 3 final (1).pdf | 30 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf | 29 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A_.pdf | 11 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 8 Nov 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 bhoomi prarambh.pdf | 25 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 17 Jul 2024 |
| Layout approvalFile: Plans _1-1.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _2-2.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _3-3.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _4-4.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _5-5.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _6-6.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _7-7.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _8-8.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _9-9.pdf | 1 Jun 2024 |
| Building plan approvalFile: IOD.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _10-10.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _11-12.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _13-13.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _14-14.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _15-15.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _16-16.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _17-17.pdf | 1 Jun 2024 |
| Layout approvalFile: Plans _18-end.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _1-1.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _2-2.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _3-3.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _4-4.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _5-5.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _6-6.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _7-7.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _8-8.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _9-9.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _10-10.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _11-12.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _13-13.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _14-14.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _15-15.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _16-16.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _17-17.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plans _18-end.pdf | 1 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf | 1 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf | 2 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 18 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 18 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARC Prarambh.pdf | 10 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf | 10 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23 Bhoomi Prarambh.pdf | 6 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 23 Bhoomi Prarambha.pdf | 6 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Bhoomi Prarambh.pdf | 12 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf | 12 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 2402236_FurtherCC_signed.pdf | 9 Dec 2023 |
| Declaration in FORM BFile: Form B.pdf | 9 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf | 3 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf | 2 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prarambh Form - 1 - ARC.pdf | 16 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf | 7 Sep 2023 |
| Layout approvalFile: IOD Drawing - 1 highlight.pdf | 22 Jun 2023 |
| Copy of Layout Approval (in case of layout)File: IOD Drawing - 1 highlight.pdf | 22 Jun 2023 |
| Declaration about Commencement CertificateFile: CC COVERING LETTER G 7.pdf | 22 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Prarambh - Revised CA Certificate G 7.pdf | 22 Jun 2023 |
| Other - TechnicalFile: IOD Drawing - 1 highlight.pdf | 22 Jun 2023 |
| Other - TechnicalFile: Screenshot 2023-06-22 152943.pdf | 22 Jun 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Shri Sadashiv | Santacruz East | 19 | Completed | Dec 2021 | Aug 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BHOOMI PRARAMBH on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
Kalpataru Advay
Kalpataru Limited
BHOOMI PRATISHTHA
Bhoomi Shashwat Estate Pvt. Ltd.
SHEETAL SHASHANKA
D.G.S LAND DEVELOPERS (INDIA) PRIVATE LIMI
DEM Oak
Dem Cornerstone Private Limited
AVYUKTA VEDANT
SHIVOHAM INFRAHOMES LLP
SURYLOK
RAKESHKUMAR AMRATLAL SHAH
See every Mumbai Suburban project, with the district possession charts
Builder: Bhoomi Shashwat Estate Pvt. Ltd.
Bhoomi Shashwat Estate Pvt. Ltd. has 3 registrations on MahaRERA, including Shri Sadashiv CHSL and BHOOMI PRATISHTHA. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that BHOOMI PRARAMBH shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BHOOMI PRARAMBH is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHOOMI PRARAMBH?
The registered promoter entity is Bhoomi Shashwat Estate Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHOOMI PRARAMBH?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BHOOMI PRARAMBH?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHOOMI PRARAMBH?
The professionals named in the filing: Architect: PREMAL GOGRI; Engineer: Vihang Shah; Chartered Accountant: AMIT T JAIN AND CO; Chartered Accountant: MAYUR SINGHAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHOOMI PRARAMBH?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback