BHOOMI PRARAMBH

By Bhoomi Shashwat Estate Pvt. Ltd.

RG-MH-05567 · RERA P51800051754 · Last updated on MahaRERA portal: 15 Jun 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
8 of 11Construction stages donefurthest along: Basement (if any), 0%
20 of 76Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 115 documents Report an error

BHOOMI PRARAMBH is a Commercial project by Bhoomi Shashwat Estate Pvt. Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051754 on 27 Jun 2023. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 9 months from the original filing. 56 of the 76 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameBHOOMI PRARAMBH
  • TypeCommercial
  • Location
    • LINK ROAD
    • BORIVALI WEST
    • Borivali
    • Mumbai Suburban
    • 400091
  • Pincode400091
  • RERA no.P51800051754
  • ReraGenie IDRG-MH-05567

Builder

  • NameBhoomi Shashwat Estate Pvt. Ltd.
  • Entity typeCompany
  • DirectorsAjay Champaklal Mehta, Akshay Jayantilal Doshi, Bhushan Champaklal Mehta, Shail Bhushan Mehta, Samyak Akshay Doshi, Samarth Jayesh Doshi, Chaitya Ajay Mehta, Nirav Bhushan Mehta
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

10 months past promisethis monthRegisteredJun 2023First promiseMar 2025Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 31 Mar 2025)
  • Buildings1 building record
  • Documents filed115 files

Current status

74%56 of 76 units booked
57.9%Work done, per cost certificate

Figures as on 15 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA8707676

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

WING A: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 15 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered51

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area710 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Dec 2025
LandownerVillageDistrict
SHREE VISHRAMYOG CHS LTDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4595.15
Proposed, not sanctioned1,942 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGOREGAON WEST
Estimated costRs 29.91 cr
Cost incurredRs 17.30 cr
Work done57.86%
BuildingWingEstimatedIncurred
WING ANARs 28.41 crRs 17.30 cr
-NARs 1.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPREMAL GOGRI
EngineerVihang Shah
Chartered AccountantAMIT T JAIN AND CO
Chartered AccountantMAYUR SINGHAL
PartnerRole in project
Bhoomi Shashwat Estate Pvt. Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800017537Mar 2025 → Dec 2025

Reason as filed by the promoterDue to heavy monsoon in early days & since our Project is abutting Metro Station, there are certain restriction laid down by Metro Authority on the construction activities, the Project was not able start on time hence it got delayed by few months. We would like to request you to further grant us extension for 9 (NINE) months i.e. the revised Project Completion Date would be 31.12.2025.

Litigation declared2

CaseCourtStatus
1051/2022CITY CIVIL DINDOSHIONGOING
58/2023CITY CIVIL DINDOSHIONGOING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed115

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf15 Jun 2026
Withdrawal Update Form 1File: Form 1 ARC Prarambh.pdf15 Jun 2026
Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf15 Jun 2026
Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf15 Jun 2026
Withdrawal Update Form 2File: form 2 Prarambh June 25.pdf15 Jun 2026
Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf15 Jun 2026
Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf15 Jun 2026
Withdrawal Update Form 3File: Bhoomi Prarambh Form 3 Q1 June-2025 (1).pdf15 Jun 2026
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Prarambh Form 3 March 25 (1).pdf29 Apr 2025
35 Bhoomi Prarambh FORM 229 Apr 2025
Disclosure of sold/ booked inventoryFile: inventory.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 24 Bhoomi Prarambh (3) (1).pdf14 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARC Prarambh.pdf13 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 25 Bhoomi Prarambh Form 2( Engineering Certificate) 040225 signed.pdf13 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi prarmbh sep 24 form 3 final (1).pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 23-24.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A_.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Nov 2024
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf8 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 bhoomi prarambh.pdf25 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf17 Jul 2024
Layout approvalFile: Plans _1-1.pdf1 Jun 2024
Layout approvalFile: Plans _2-2.pdf1 Jun 2024
Layout approvalFile: Plans _3-3.pdf1 Jun 2024
Layout approvalFile: Plans _4-4.pdf1 Jun 2024
Layout approvalFile: Plans _5-5.pdf1 Jun 2024
Layout approvalFile: Plans _6-6.pdf1 Jun 2024
Layout approvalFile: Plans _7-7.pdf1 Jun 2024
Layout approvalFile: Plans _8-8.pdf1 Jun 2024
Layout approvalFile: Plans _9-9.pdf1 Jun 2024
Building plan approvalFile: IOD.pdf1 Jun 2024
Layout approvalFile: Plans _10-10.pdf1 Jun 2024
Layout approvalFile: Plans _11-12.pdf1 Jun 2024
Layout approvalFile: Plans _13-13.pdf1 Jun 2024
Layout approvalFile: Plans _14-14.pdf1 Jun 2024
Layout approvalFile: Plans _15-15.pdf1 Jun 2024
Layout approvalFile: Plans _16-16.pdf1 Jun 2024
Layout approvalFile: Plans _17-17.pdf1 Jun 2024
Layout approvalFile: Plans _18-end.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _1-1.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _2-2.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _3-3.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _4-4.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _5-5.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _6-6.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _7-7.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _8-8.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _9-9.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _10-10.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _11-12.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _13-13.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _14-14.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _15-15.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _16-16.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _17-17.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Plans _18-end.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf2 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf18 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARC Prarambh.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf10 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Dec 23 Bhoomi Prarambh.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Dec 23 Bhoomi Prarambha.pdf6 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1 - Bhoomi Prarambh.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf12 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 2402236_FurtherCC_signed.pdf9 Dec 2023
Declaration in FORM BFile: Form B.pdf9 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3.pdf3 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer form 2.pdf2 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Prarambh Form - 1 - ARC.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: sold_unsold_Bhoomi Prarambh_Wing A.pdf7 Sep 2023
Layout approvalFile: IOD Drawing - 1 highlight.pdf22 Jun 2023
Copy of Layout Approval (in case of layout)File: IOD Drawing - 1 highlight.pdf22 Jun 2023
Declaration about Commencement CertificateFile: CC COVERING LETTER G 7.pdf22 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhoomi Prarambh - Revised CA Certificate G 7.pdf22 Jun 2023
Other - TechnicalFile: IOD Drawing - 1 highlight.pdf22 Jun 2023
Other - TechnicalFile: Screenshot 2023-06-22 152943.pdf22 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Shri SadashivSantacruz East19CompletedDec 2021Aug 2021

How this compares with Mumbai Suburban

74%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 9 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHOOMI PRARAMBH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

Builder: Bhoomi Shashwat Estate Pvt. Ltd.

Bhoomi Shashwat Estate Pvt. Ltd. has 3 registrations on MahaRERA, including Shri Sadashiv CHSL and BHOOMI PRATISHTHA. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that BHOOMI PRARAMBH shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BHOOMI PRARAMBH is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHOOMI PRARAMBH?

The registered promoter entity is Bhoomi Shashwat Estate Pvt. Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHOOMI PRARAMBH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHOOMI PRARAMBH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHOOMI PRARAMBH?

The professionals named in the filing: Architect: PREMAL GOGRI; Engineer: Vihang Shah; Chartered Accountant: AMIT T JAIN AND CO; Chartered Accountant: MAYUR SINGHAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHOOMI PRARAMBH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHOOMI PRARAMBH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHOOMI PRARAMBH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.