Home / Browse projects / Palghar, Maharashtra / Bhoomi Classic Building No. 02

Registered No litigation declared Residential / Group Housing project

Bhoomi Classic Building No. 02

By Apna Sai Builders And Developers

RG-MH-30174 · RERA P99000030044 · Last updated on MahaRERA portal: 3 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 80%
107 of 215Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Bhoomi Classic Building No. 02 is a Residential / Group Housing project by Apna Sai Builders And Developers in Palghar, Maharashtra, registered with MahaRERA as P99000030044 on 26 Jul 2021. Possession is promised by 31 Dec 2028. 108 of the 215 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameBhoomi Classic Building No. 02
  • TypeResidential / Group Housing
  • Location
    • Nilemore
    • Nallasopara West
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401203
  • Pincode401203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000030044
  • ReraGenie IDRG-MH-30174

Builder

  • NameApna Sai Builders And Developers
  • Entity typePartnership
  • GSTIN27ABFFA1771N1Z6
  • PartnersMilind Chandrakant Shinde, Ravi Rajlingam Mukund
  • Other registrations1 more →

Key dates

this monthRegisteredJul 2021PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on26 Jul 2021
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed99 files

Current status

50%108 of 215 units booked

Figures as on 3 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C D WingNA16162150215
D WingNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 80%.

C D Wing79%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises75%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%
D Wing49%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure46%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities16

As on 3 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
LiftYes0%

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,274 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI9891.52
Proposed, not sanctioned9,892 sq m
Buildings approved1
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNavghar, Vasai Road

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectShyam R Kashid
EngineerShyam Kashid
EngineerMohammad Shoeb Bhati
EngineerABUSAHMA
Chartered AccountantS Lakdawala and Associates
Chartered AccountantSakina Amreliwala
Chartered AccountantMAA & Company
PartnerRole in project
Apna Sai Builders And Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Dec 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 Jan to Mar 26.pdf3 Jun 2026
Form 2File: Form 2 Jan to Mar 26.pdf3 Jun 2026
Form 3File: Form 3 jan to mar 2026.pdf3 Jun 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold jan to mar 2026.pdf3 Jun 2026
Form 1File: Form 1 Oct to Dec 25.pdf6 Feb 2026
Form 2File: Form 2 Oct to Dec 25.pdf6 Feb 2026
Form 3File: Form 3-Oct to Dec 25_11zon.pdf6 Feb 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold_Oct to Dec 2025_11 Zone.pdf6 Feb 2026
Form 1File: Form 1- April to June 2025.pdf12 Dec 2025
Form 2File: Form 2 - April to June 2025.pdf12 Dec 2025
Form 3File: Form 3 April to June 2025_11zon.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold-Apr to Jun 25_11zon.pdf12 Dec 2025
Form 1File: Form 1 Jul to Sep 25.pdf12 Dec 2025
Form 2File: Form 2 -Jul to Sep 2025.pdf12 Dec 2025
Form 3File: Form 3 July to Sep 25_11zon.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold -Jul to Sep 25_11zon.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A FY24-25_11zon.pdf19 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 Jan to march25.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan to Mar 25.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 Jan to march25.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold Jan to mar 25 _11zon.pdf15 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 23-24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Apna sai builders and developers (Oct 24 to Dec 24)_11zon.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Jan To Mar 24_11zon.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Apr to Jun 24_11zon.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory July to Sep 24_11zon.pdf10 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory Oct to Dec 24_11zon.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April to june24.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April to june24.pdf24 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf22 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: New CC 06-03-2024_11zon.pdf2 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1.pdf1 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf1 Jun 2024
Disclosure of sold/ booked inventoryFile: bhoomi classic sold inventory (jan-march)23 _11zon.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: bhoomi classic sold inventory (April to June) 23 _11zon.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: bhoomi classic sold inventory ( July to Sept) 23_11zon.pdf21 Mar 2024
Disclosure of sold/ booked inventoryFile: disclosure of sold inventory (Oct to Dec)23 _11zon.pdf21 Mar 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrance.pdf9 Mar 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrance.pdf9 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM5_2022-23 CA Certificate.pdf9 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - seprate bank.pdf9 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1Architect's Certificate (Quarter-4) (Jan to March-2023(.pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect's Certificate (Quarter-1)(April to June-2023).pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect's Certificate (Quarter-2) (July to Sept-2023).pdf6 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect's Certificate (Quarter-3) (Oct to Dec-2023).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Annexure -B(Q-4 January to March-2023).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Annexure -B (Q-1 April to June-2023).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Annexure -B (Q-2 July to September 2023).pdf6 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Annexure -B (Q-3 October to December 2023).pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2A Fy21-22 .pdf6 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 22-23 .pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jan to Mar 23_11zon.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration for Form 3 April to June .pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration for Form 3.pdf6 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: declaration for Form 3 oct-dec .pdf6 Mar 2024
Proforma of Agreement for saleFile: Agreement Sale.pdf17 Feb 2024
Layout approvalFile: Layout.pdf15 Dec 2023
Building plan approvalFile: Blue Print_Sheet 1.pdf15 Dec 2023
Building plan approvalFile: Blue Print_Sheet 2.pdf15 Dec 2023
Building plan approvalFile: Blue Print_Sheet 3.pdf15 Dec 2023
Details of encumbrances concerned to FinanceFile: Declaration for Legal and Litigation .pdf15 Dec 2023
Details of encumbrances concerned to LegalFile: Declaration for Legal and Litigation .pdf15 Dec 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print_Sheet 1.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print_Sheet 2.pdf15 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: Blue Print_Sheet 3.pdf15 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Dt 08-04-22.pdf15 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 dt 22-11-23.pdf15 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FROM 2 dt 23-11-23.pdf15 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory Dt 16-11-23.pdf15 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Milind Shinde.pdf15 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Ravi Mukund.pdf15 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 2021-22.pdf15 Dec 2023
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf15 Dec 2023

How this compares with Palghar

50%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhoomi Classic Building No. 02 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Nallasopara West3,200+ in Palghar

2 kmBhoomi Classic Building Completed 46Lapsed / revoked 39Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 185 registered projects within 2 km.

Builder: Apna Sai Builders And Developers

APNA SAI BUILDERS AND DEVELOPERS has 2 registrations on MahaRERA, including BHOOMI CLASSIC BUILDING NO. 2 and Bhoomi Classic Building No. 02. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Bhoomi Classic Building No. 02 is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhoomi Classic Building No. 02?

The registered promoter entity is Apna Sai Builders And Developers, a partnership as per the filing. Its GSTIN 27ABFFA1771N1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhoomi Classic Building No. 02?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhoomi Classic Building No. 02?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhoomi Classic Building No. 02?

The professionals named in the filing: Architect: Shyam R Kashid; Engineer: Shyam Kashid; Engineer: Mohammad Shoeb Bhati; Engineer: ABUSAHMA; Chartered Accountant: S Lakdawala and Associates; Chartered Accountant: Sakina Amreliwala. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhoomi Classic Building No. 02?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhoomi Classic Building No. 02. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhoomi Classic Building No. 02 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.