Home / Browse projects / Palghar, Maharashtra / BHAVYA HEIGHTS

Registered No litigation declared Residential / Group Housing project

BHAVYA HEIGHTS

By MORYA REALTORS

RG-MH-65548 · RERA P99000011803 · Last updated on MahaRERA portal: 5 Aug 2026

Source: official MahaRERA filing

Red flags

  • 19 complaints at MahaRERA
  • Completion date moved by 95 months
  • 4 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Jun 2027Possession promisedmoved 95 months from the original
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
47 of 97Units unsoldnot recorded sold or booked
19Complaints at MahaRERAon this registration
Jump to the 94 documents Report an error

BHAVYA HEIGHTS is a Residential / Group Housing project by MORYA REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000011803 on 31 Aug 2017. Possession is promised by 30 Jun 2027. The completion date has moved by 95 months from the original filing. 50 of the 97 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 19 complaints are on record with the regulator.

At a glance

Project

  • NameBHAVYA HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • CHIKHAL DONGERE ROAD
    • GLOBAL CITY
    • HDIL
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000011803
  • ReraGenie IDRG-MH-65548

Builder

  • NameMORYA REALTORS
  • Entity typePartnership
  • GSTIN27AAVFM4841J1ZN
  • PartnersAVINASH VIKRAM DHOLE, VIPUL BHALCHANDRA PATIL, SUSHIL JAGDISH PRASAD JOSHI, MAHESH MAVJI PATEL, RAJENDRA DHONDU SAWANT, BHARAT CHINTAMAN PATIL

Key dates

this monthRegisteredAug 2017First promiseJul 2019Revised toJun 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion30 Jun 2027
  • Revised completionRevised to 30 Jun 2027 (originally 31 Jul 2019)
  • Buildings1 building record
  • Documents filed94 files

Current status

52%50 of 97 units booked
75.2%Work done, per cost certificate

Figures as on 5 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAVYA HEIGHTSNA171688997

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

BHAVYA HEIGHTS: 44% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 5 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes30%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes40%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,600 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI5560.0
Proposed, not sanctioned5,560 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAGASHI ROAD GOKUL TOWNSHIP VIRAR WEST
Estimated costRs 13.86 cr
Cost incurredRs 10.42 cr
Work done75.2%
BuildingWingEstimatedIncurred
BHAVYA HEIGHTSNARs 13.03 crRs 10.42 cr
-NARs 83.16 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerANUKUSH MOHILE
EngineerSUNIL APTE
Chartered AccountantNIDHI JIVRAJKA
Chartered AccountantMISHRA MAYEKAR & CO.
PartnerRole in project
MORYA REALTORS-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000015281Jul 2019 → Apr 2024

Reason as filed by the promoterPROJECT EXTENT DUE TO FINANCIAL CRISES AND SHORTAGE OF MATERIALS.

EXT99000010784Jul 2019 → Sep 2022

Reason as filed by the promoterDUE TO COVID PANDEMIC AND FINANCIAL CRISES

EXT99000005587Jul 2019 → Jun 2020

Reason as filed by the promoterDue to differences among the Partners.

EA17052620994Jul 2019 → Jun 2027

Reason as filed by the promoterDue to differences among the Partners. now short out and works at completion stage.

Complaints filed with MahaRERA19

Case no.ComplainantRespondentFiled
CC006000000089779PRADEEP PATILMORYA REALTORS18/06/2019
CC006000000209938MAHENDRA MISHRA & ASHA M MISHRA1. MORYA REALTORS BUILDERS AND DEVELOPERS 2. M/S MORYA BUILDERS 3.M/S HOUSING DEVELOPMENT AND INFRAS08/02/2022
CC006000000198311Haricharan YadavMorya Realtors11/09/2021
CC006000000198044AYESSPEA HOLDINGS AND INVESTMENTS PVT LTDMorya Realtors06/09/2021
CC006000000198061AYESSPEA HOLDINGS AND INVESTMENT PVT LTDMorya Realtors06/09/2021
CC006000000198062AYESSPEA HOLDINGS AND INVESTMENT PVT LTDMorya Realtors06/09/2021
CC006000000198075AYESSPEA HOLDINGS AND INVESTMENTS PVT LTDMorya Realtors06/09/2021
CC006000000198097Ayesspea Holdings and Investments Private LimitedMorya Realtors06/09/2021
CC006000000198099Ayesspea Holdings and Investments Private LimitedMorya Realtors07/09/2021
CC006000000198101Ayesspea Holdings and Investments Private LimitedMorya Realtors07/09/2021
CC006000000198102Ayesspea Holdings and Investments Private LimitedMorya Realtors07/09/2021
CC006000000198111Ayesspea Holdings and Investments Private LimitedMorya Realtors07/09/2021
CC006000000198169Ayesspea Holdings and Investments Private LimitedMorya Realtors07/09/2021
CC006000000198170Ayesspea Holdings and Investments Private LimitedMorya Realtors13/09/2021
CC006000000198172Ayesspea Holdings and Investments Private LimitedMorya Realtors13/09/2021
CC006000000209752Vaishali MahajanMorya Realtors25/01/2022
CC006000000209934Ramesh ChilukaMorya Realtors08/02/2022
CC12400449Jyoti R PatilMORYA REALTORS18/10/2024
CC12500693SUBODH SUSHILCHANDRA PEDNEKARMORYA REALTORS27/02/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Aug 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2027

Documents filed94

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: 30 9 24.pdf5 Aug 2026
Form 2File: form 2_merged latest-6.pdf5 Aug 2026
Form 3File: form 3 3 0 09 24.pdf5 Aug 2026
Disclosure of Sold and Booked InventoryFile: disc of sold unsold inventory.pdf5 Aug 2026
Form 1File: 31 12 24.pdf5 Aug 2026
Form 2File: form 2_merged latest-7.pdf5 Aug 2026
Form 3File: form 3 31 12 24.pdf5 Aug 2026
Disclosure of Sold and Booked InventoryFile: disc of sold unsold inventory.pdf5 Aug 2026
Form 1File: 31 3 25.pdf5 Aug 2026
Form 2File: form 2_merged latest-8.pdf5 Aug 2026
Form 3File: form 3 31 3 25.pdf5 Aug 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf5 Aug 2026
Withdrawal Update Form 1File: 30 9 24.pdf5 Aug 2026
Withdrawal Update Form 1File: 30 6 25.pdf5 Aug 2026
Withdrawal Update Form 1File: 30 6 25.pdf5 Aug 2026
Withdrawal Update Form 2File: form 2_merged latest-6.pdf5 Aug 2026
Withdrawal Update Form 2File: form 2_merged latest-9.pdf5 Aug 2026
Withdrawal Update Form 2File: form 2_merged latest-9.pdf5 Aug 2026
Withdrawal Update Form 3File: form 3 3 0 09 24.pdf5 Aug 2026
Withdrawal Update Form 3File: form 3 30 9 25.pdf5 Aug 2026
Withdrawal Update Form 3File: form 3 30 6 25.pdf5 Aug 2026
Form 1File: 30 06 2023.pdf16 May 2026
Form 2File: form 2_merged latest-1.pdf16 May 2026
Form 3File: form 3 30 6 23.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf16 May 2026
Form 1File: 30 09 2023.pdf16 May 2026
Form 2File: form 2_merged latest-2.pdf16 May 2026
Form 3File: form 3 30 09 23.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf16 May 2026
Form 3File: form 3 31 12 23.pdf16 May 2026
Form 1File: 31 12 2023.pdf16 May 2026
Form 2File: form 2_merged latest-3.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf16 May 2026
Form 1File: 31 03 2024.pdf16 May 2026
Form 2File: form 2_merged latest-4.pdf16 May 2026
Form 3File: form 3 31 3 24.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf16 May 2026
Form 1File: 30 06 2024.pdf16 May 2026
Form 2File: form 2_merged latest-5.pdf16 May 2026
Form 3File: form 3 30 6 24.pdf16 May 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE SOLD-UNSOLD NEW.pdf16 May 2026
Withdrawal Update Form 1File: 30 06 2023.pdf16 May 2026
Withdrawal Update Form 1File: 30 09 2023.pdf16 May 2026
Withdrawal Update Form 1File: 31 12 2023.pdf16 May 2026
Withdrawal Update Form 1File: 31 03 2024.pdf16 May 2026
Withdrawal Update Form 1File: 31 03 2024.pdf16 May 2026
Withdrawal Update Form 2File: form 2_merged latest-1.pdf16 May 2026
Withdrawal Update Form 2File: form 2_merged latest-2.pdf16 May 2026
Withdrawal Update Form 2File: form 2_merged latest-3.pdf16 May 2026
Withdrawal Update Form 2File: form 2_merged latest-4.pdf16 May 2026
Withdrawal Update Form 2File: form 2_merged latest-4.pdf16 May 2026
Withdrawal Update Form 3File: form 3 30 6 23.pdf16 May 2026
Withdrawal Update Form 3File: form 3 30 09 23.pdf16 May 2026
Withdrawal Update Form 3File: form 3 31 12 23.pdf16 May 2026
Withdrawal Update Form 3File: form 3 31 3 24.pdf16 May 2026
Withdrawal Update Form 3File: form 3 31 3 24.pdf16 May 2026
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Site supervisor certificate.pdf7 Apr 2023
Certificates of CA (Form 3)File: Form 3_11zon (1).pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 March 2021.pdf7 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 March 2022.pdf7 Apr 2023
Details of encumbrances concerned to FinanceFile: Encumbrance letter.pdf4 Apr 2023
Details of encumbrances concerned to LegalFile: Encumbrance letter.pdf4 Apr 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ajay wade associates.pdf4 Apr 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 morya.pdf4 Apr 2023
Disclosure of sold/ booked inventoryFile: disclosure of sold unsold.pdf4 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200265424336_For_Asset_Based_Search_04_04_2023_16_58_54_372.pdf4 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest.pdf4 Apr 2023
Proforma of Agreement for saleFile: agreement rera draft merged.pdf4 Apr 2023
Proforma of Allotment letterFile: Annexure 1 model form of allotment letter.pdf4 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Declaration about separate bank ac.pdf4 Apr 2023
Deviation Report with respect to Allotment letterFile: Deviation report for allotment letter.pdf4 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report for aggreement sale.pdf4 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: engineers certificate.pdf24 Aug 2021
Declaration about Commencement CertificateFile: declaration about commencement certificate.pdf23 Aug 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A Sandeep morya.pdf23 Aug 2021
Disclosure of sold/ booked inventoryFile: disclosure of sold and booked inventory morya.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017 -18.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf23 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019 - 20.pdf23 Aug 2021
Layout approvalFile: Layout Plan.pdf16 Aug 2017

How this compares with Palghar

52%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 95 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAVYA HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near GLOBAL CITY, HDIL3,200+ in Palghar

2 kmBHAVYA HEIGHTSCompleted 37Lapsed / revoked 21Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 63 registered projects within 2 km.

Builder: MORYA REALTORS

MORYA REALTORS has 1 registration on MahaRERA, including BHAVYA HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if BHAVYA HEIGHTS is delayed beyond 30 Jun 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAVYA HEIGHTS?

The registered promoter entity is MORYA REALTORS, a partnership as per the filing. Its GSTIN 27AAVFM4841J1ZN can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAVYA HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BHAVYA HEIGHTS?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BHAVYA HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAVYA HEIGHTS?

The professionals named in the filing: Architect: AJAY WADE; Engineer: ANUKUSH MOHILE; Engineer: SUNIL APTE; Chartered Accountant: NIDHI JIVRAJKA; Chartered Accountant: MISHRA MAYEKAR & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAVYA HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAVYA HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAVYA HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.