Home / Browse projects / Bhavya Elite
Bhavya Elite
By Newlook Constructions Pvt. Ltd
RG-MH-29103 · RERA P51900027909 · Last updated on MahaRERA portal: 1 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bhavya Elite is a Others project by Newlook Constructions Pvt. Ltd in Antophill, 400037, registered with MahaRERA as P51900027909 on 14 Jan 2021. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 12 months from the original filing. 206 of the 305 units on this registration are recorded sold or booked, and 9 of 11 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameBhavya Elite
- TypeOthers
- Location
- J K Basin Road
- Antophill
- 400037
- Pincode400037
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51900027909
- ReraGenie IDRG-MH-29103
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Jan 2021
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 30 Jun 2025)
- Buildings1 building record
- Documents filed133 files
Current status
Figures as on 1 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bhavya Elite | NA | 42 | 40 | 305 | 0 | 305 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 1 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Bhavya Elite: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 0% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 1 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed1
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Bhavya Elite | NA | Rs 114.08 cr | Rs 121.86 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Newlook Architects Pvt Ltd |
| Engineer | Deepak B Sawant |
| Engineer | SK Associates |
| Chartered Accountant | MGR & Co |
| Chartered Accountant | N.R. Gala amp Associates |
| Chartered Accountant | Esha Ramesh Bhanushali |
| Partner | Role in project |
|---|---|
| Newlook Constructions Pvt. Ltd | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe primary reason for the delay was a stop-work notice issued by the SRA authorities, which cited concerns regarding illegal construction activities. We took this matter very seriously and worked diligently to address the issues outlined in the notice. After submitting our responses along with the required documentation and proofs, we were able to resolve the matter. However, this process took approximately 14 months, ultimately impacting our ability to adhere to the original project timeline. Despite these challenges, I want to assure you that we are fully committed to completing the project
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12602534 | Ajay Kataria | Newlook Constructions Pvt. Ltd | 30/04/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Dec 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 17 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Dec 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 16 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed133
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 133 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form no 1 date 30-06-2024.pdf | 1 Aug 2026 |
| Form 2File: Form 2 30-06-2023.pdf | 1 Aug 2026 |
| Form 3File: Form3 upto 30092024 Compressed.pdf | 1 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 1 Aug 2026 |
| Form 1File: Form no 1 date 30-06-2024.pdf | 29 Jul 2026 |
| Form 2File: Form 2 31-03-2024.pdf | 29 Jul 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold December 2024.pdf | 29 Jul 2026 |
| Self-declaration of Quarterly ProgressFile: Sold Unsold December 2024.pdf | 29 Jul 2026 |
| Form 3File: Form3 upto 31122024 Compressed.pdf | 29 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026 Final.pdf | 29 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026 (3).pdf | 29 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026 Final.pdf | 29 Jul 2026 |
| Form 2A (FY 2023-2024)File: Form 2A March 2025.pdf | 28 Jul 2026 |
| Form 2A (FY 2022-2023)File: Form 2A March 2023.pdf | 28 Jul 2026 |
| Form 2A (FY 2021-2022)File: Form 2A March 2022.pdf | 28 Jul 2026 |
| Form 2A (FY 2020-2021)File: Form 2A March 2021.pdf | 28 Jul 2026 |
| Form 2A (FY 2026-2027)File: Form 2A March 2025.pdf | 28 Jul 2026 |
| Form 5 (FY 2025-2026)File: Form 5 24 25.pdf | 28 Jul 2026 |
| Form 5 (FY 2021-2022)File: Form 5 24 25.pdf | 28 Jul 2026 |
| Form 5 (FY 2020-2021)File: Form 5 24 25.pdf | 28 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A March 2025.pdf | 23 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 June 2026 Final.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 June 2026 (3).pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 June 2026 Final.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 March 2026.pdf | 10 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 March 2026 (2).pdf | 10 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 March 2026- Bhavya Elite.pdf | 10 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 Dec 2025.pdf | 9 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 Dec 2025 (2).pdf | 9 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 Bhavya Elite - Dec 2025.pdf | 9 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 30 September 2025.pdf | 2 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 Sep 2025.pdf | 2 Dec 2025 |
| Withdrawal Update Form 3File: Bhavya Elite Form 3 Sep 2025.pdf | 2 Dec 2025 |
| Withdrawal Update Form 1File: Form 1 30 June 2025.pdf | 1 Dec 2025 |
| Withdrawal Update Form 2File: Form 2 June 2025.pdf | 1 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 1 Dec 2025 |
| Form 5 (FY 2022-2023)File: Form 5 22 23.pdf | 5 Jul 2025 |
| Form 5 (FY 2023-2024)File: Form 5 23 24.pdf | 5 Jul 2025 |
| Form 5 (FY 2024-2025)File: Form 5 24 25.pdf | 5 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A 31.03.2025.pdf | 4 Jul 2025 |
| Form 1File: Form 1 (Bhvya Elite ) June 2024.pdf | 28 Jun 2025 |
| Form 2File: Q7 CERTIFICATE Form 2 June 24.pdf | 28 Jun 2025 |
| Form 3File: Form3 upto 30062024 Compressed.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold June 2024.pdf | 28 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration June 2024.pdf | 28 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Sept 2024.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Sept 2024.pdf | 28 Jun 2025 |
| Form 3File: Form3 upto 30092024 Compressed.pdf | 28 Jun 2025 |
| Form 2File: Q8 CERTIFICATE Sept 24.pdf | 28 Jun 2025 |
| Form 1File: Form 1 (Bhvya Elite) Sep 2024.pdf | 28 Jun 2025 |
| Form 1File: Form 1 (Bhvya Elite) Dec 2024.pdf | 28 Jun 2025 |
| Form 2File: Q9 CERTIFICATE Dec 24.pdf | 28 Jun 2025 |
| Form 3File: Form3 upto 31122024 Compressed.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold December 2024.pdf | 28 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration Dec 2024.pdf | 28 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration March 2025.pdf | 28 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold And Unsold March 2025 Compressed.pdf | 28 Jun 2025 |
| Form 3File: Form 3 upto 31032025 Final.pdf | 28 Jun 2025 |
| Form 2File: Q10 CERTIFICATE Mar 25.pdf | 28 Jun 2025 |
| Form 1File: Form 1 date 31_03_2025.pdf | 28 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-06-2023.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 30-09-2023.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2023.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-03-2024.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 23.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 23.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 23.pdf | 14 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 24.pdf | 14 Dec 2024 |
| Layout approvalFile: Plan Amendment Letter BE.pdf | 17 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: Plan Amendment Letter BE.pdf | 17 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 30062023.pdf | 28 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert 30092023.pdf | 28 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Dec23.pdf | 28 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Cert Mar24.pdf | 28 Jun 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Interest in other org.pdf | 16 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf | 15 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA Eng Certificate.pdf | 15 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA CA Certificate (1).pdf | 15 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrances on Bhavya Elite.pdf | 30 Mar 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrances on Bhavya Elite.pdf | 30 Mar 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| Bhavya Heights | Katrak Road | 96 | Completed | Dec 2012 | Apr 2012 |
| Bhavya Supreme | A.D Marg | 66 | Completed | May 2012 | May 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 133 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Bhavya Elite on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Antophill
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
The Earth
AB BUILDERS AND DEVELOPERS SOLUTIONS PRIVA
AJMERA MANHATTAN BUILDING 3A AND 3B
AJMERA REALTY AND INFRA INDIA LTD
AJMERA MANHATTAN BUILDING 4A AND 4B
AJMERA REALTY AND INFRA INDIA LTD
DOSTI EASTERN BAY - PHASE 3
DOSTI REALTY LTD
Siddha Sky Phase 2
M/s Sejal Shakti Realtors LLP
Siddha Sky Phase 4
Sejal Shakti Realtors LLP
Builder: Newlook Constructions Pvt. Ltd
Newlook Constructions Pvt. Ltd has 4 registrations on MahaRERA, including Samta Parel and Satguru Antop Hill. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.
Frequently asked questions
What does it mean that Bhavya Elite shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Bhavya Elite is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bhavya Elite?
The registered promoter entity is Newlook Constructions Pvt. Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bhavya Elite?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Bhavya Elite?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Bhavya Elite?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bhavya Elite?
The professionals named in the filing: Architect: Newlook Architects Pvt Ltd; Engineer: Deepak B Sawant; Engineer: SK Associates; Chartered Accountant: MGR & Co; Chartered Accountant: N.R. Gala amp Associates; Chartered Accountant: Esha Ramesh Bhanushali. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bhavya Elite?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback