Home / Browse projects / Raigarh, Maharashtra / Bhaveshwar Hills

Completed No litigation declared Others project

Bhaveshwar Hills

By Geo Corporation

RG-MH-68678 · RERA P52000049079 · Last updated on MahaRERA portal: 29 Mar 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
33 of 92Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

Bhaveshwar Hills is a Others project by Geo Corporation in Raigarh, Maharashtra, registered with MahaRERA as P52000049079 on 30 Jan 2023. The registration is recorded completed; possession was promised by 31 Dec 2027. 59 of the 92 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameBhaveshwar Hills
  • TypeOthers
  • Location
    • Sector- 7
    • Dapoli
    • Pushpak - Panvel
    • Dapoli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000049079
  • ReraGenie IDRG-MH-68678

Builder

  • NameGeo Corporation
  • Entity typePartnership
  • PartnersHasmukh Manji Chambaria, Hemang Dineshbhai Patel, Akshay Mahesh Fushi, Rahul Govind Patel, Ramesh Laxman Chambaria, Ronak Vinod Bhambhaniya

Key dates

this monthRegisteredJan 2023PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Current status

64%59 of 92 units booked
85.2%Work done, per cost certificate

Figures as on 29 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bhaveshwar Hills- A Wing and B WingNA88821092

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 29 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Bhaveshwar Hills- A Wing and B Wing: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 29 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%

Parking filed67

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots67
Closed/Covered12
Open Space55

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,150 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jun 2025

Approvals and building plan

Sanctioning authorityCITY AND INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA LIMITED
Permissible FSI4742.93
Proposed, not sanctioned3,693 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor, Shop No- 4, 5 and 6, Neel Ashima, Plot No- 14, Sector- 2A, Uran Panvel Road, Karanjade
Estimated costRs 12.05 cr
Cost incurredRs 10.27 cr
Work done85.22%
BuildingWingEstimatedIncurred
Bhaveshwar Hills- A Wing and B WingNARs 12.05 crRs 10.27 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAtul Patel Architects
EngineerB S Sukhtankar
EngineerHITESH NANDLAL BORAD
Chartered AccountantRutuja Narsingh and Associates
Chartered AccountantKANKOTIYA & CO
Chartered AccountantV V DONGA & CO
PartnerRole in project
Geo Corporation-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - 31122025.pdf29 Mar 2026
Withdrawal Update Form 2File: Form 2 - 31122025.pdf29 Mar 2026
Withdrawal Update Form 3File: Form 3 - 31122025.pdf29 Mar 2026
Occupational CertificateFile: OC DRG_11zon.pdf29 Mar 2026
Form 1File: 1-Form 1 30062023.pdf21 Nov 2025
Form 2File: 1-Form 2 30062023.pdf21 Nov 2025
Form 3File: 1-Form 3 30062023.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 1-Sold Bookd 30062023.pdf21 Nov 2025
Form 1File: 2-Form 1 30062024.pdf21 Nov 2025
Form 2File: 2-Form 2 30062024.pdf21 Nov 2025
Form 3File: 2-Form 3 30062024.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 2-Sold Bookd 30062024.pdf21 Nov 2025
Form 1File: 3-Form 1 30092024.pdf21 Nov 2025
Form 2File: 3-Form 2 30092024.pdf21 Nov 2025
Form 3File: 3-Form 3 30092024.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 3-Sold Bookd 30092024.pdf21 Nov 2025
Form 1File: 4-Form 1 31122024.pdf21 Nov 2025
Form 2File: 4-Form 2 31122024.pdf21 Nov 2025
Form 3File: 4-Form 3 31122024.pdf21 Nov 2025
Disclosure of Sold and Booked InventoryFile: 4-Sold Bookd 31122024.pdf21 Nov 2025
Withdrawal Update Form 1File: 5-Form 1 30092025.pdf21 Nov 2025
Withdrawal Update Form 2File: 5-Form 2 30092025.pdf21 Nov 2025
Withdrawal Update Form 3File: 5-Form 3 30092025.pdf21 Nov 2025
Occupational CertificateFile: OC.pdf21 Nov 2025
Occupational CertificateFile: oc mAIL TO rera.pdf21 Nov 2025
Form 1File: Form 1 31032025.pdf17 Sep 2025
Form 2File: Form 2 31032025.pdf17 Sep 2025
Form 3File: Form 3 31032025.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked 31032025.pdf17 Sep 2025
Form 1File: Form 1 31032024.pdf17 Sep 2025
Form 2File: Form 2 31032024.pdf17 Sep 2025
Form 3File: Form 3 31032024.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked 31032024.pdf17 Sep 2025
Form 1File: Form 1.pdf17 Sep 2025
Form 2File: Form 2.pdf17 Sep 2025
Form 3File: Form 3.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked.pdf17 Sep 2025
Form 1File: Form 1.pdf17 Sep 2025
Form 2File: Form 2.pdf17 Sep 2025
Form 3File: Form 3.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Geo Corporation Sold Unsold 31032023.pdf17 Sep 2025
Form 1File: Form 1.pdf17 Sep 2025
Form 2File: Form 2.pdf17 Sep 2025
Form 3File: Form 3.pdf17 Sep 2025
Disclosure of Sold and Booked InventoryFile: Sold Booked 311223.pdf17 Sep 2025
Withdrawal Update Form 1File: Form 1 30062025.pdf17 Sep 2025
Withdrawal Update Form 2File: Form 2 30062025.pdf17 Sep 2025
Withdrawal Update Form 3File: Form 3 30062025.pdf17 Sep 2025
Form 5 (FY 2024-2025)File: Geo Corporation.pdf17 Jun 2025
Form 5 (FY 2022-2023)File: Geo Corporation.pdf16 Jun 2025
Form 5 (FY 2023-2024)File: Geo Corporation.pdf16 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032025.pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032025.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032025.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Booked 31032025.pdf21 Apr 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Geo Corporation.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf20 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Booked 31032024.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024.pdf20 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf23 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf23 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Booked 311223.pdf23 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf23 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Oct 2023
Disclosure of sold/ booked inventoryFile: Sold Booked.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Geo Corporation.pdf30 Sep 2023
Disclosure of sold/ booked inventoryFile: Geo Corporation Sold Unsold 31032023.pdf5 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: edited_Geo Form 3 31032023_11zon.pdf5 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf4 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf4 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3-2-11_merged_compressed.pdf23 Jan 2023
Deviation Report with respect to Allotment letterFile: Deviation Allotment - 17-01-2023.pdf17 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Deviation AFS- 17-01-2023_compressed (1).pdf17 Jan 2023
Proforma of Agreement for saleFile: AFS.pdf16 Jan 2023
Proforma of Allotment letterFile: Allotment Letter.pdf16 Jan 2023
Layout approvalFile: Plan layout.pdf12 Jan 2023
Building plan approvalFile: Plan layout.pdf12 Jan 2023

How this compares with Raigarh

64%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhaveshwar Hills on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dapoli, Pushpak - Panvel5,900+ in Raigarh

2 kmBhaveshwar HillsCompleted 8Lapsed / revoked 10Other 108Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: Geo Corporation

Geo Corporation has 1 registration on MahaRERA, including Bhaveshwar Hills. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Bhaveshwar Hills is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhaveshwar Hills?

The registered promoter entity is Geo Corporation, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhaveshwar Hills?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhaveshwar Hills?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhaveshwar Hills?

The professionals named in the filing: Architect: Atul Patel Architects; Engineer: B S Sukhtankar; Engineer: HITESH NANDLAL BORAD; Chartered Accountant: Rutuja Narsingh and Associates; Chartered Accountant: KANKOTIYA & CO; Chartered Accountant: V V DONGA & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhaveshwar Hills?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhaveshwar Hills. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhaveshwar Hills to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.