Bhaveshwar Callista 3
By MANSH BUILDER AND DEVELOPER
RG-MH-05806 · RERA P52000051002 · Last updated on MahaRERA portal: 27 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bhaveshwar Callista 3 is a Others project by MANSH BUILDER AND DEVELOPER in Raigarh, Maharashtra, registered with MahaRERA as P52000051002 on 19 May 2023. Possession is promised by 31 Dec 2027. 115 of the 198 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.
At a glance
Project
- NameBhaveshwar Callista 3
- TypeOthers
- Location
- Kalamboli
- Panvel
- Raigarh
- 410218
- Pincode410218
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000051002
- ReraGenie IDRG-MH-05806
Builder
- NameMANSH BUILDER AND DEVELOPER
- Entity typePartnership
- PartnersJAYESH MANJI CHAMBARIA, MAHESH NANJI FUSHI, RAMESH NATHA PATEL, VINOD BHACHU BAMBHANIYA, BHIKHU POLA GADHIA, BHARTI BABULAL PATEL, NARENDRA TULSI MANANI, DINESH LAXMAN CHAMBARIA, RAMESH LAXMAN CHAMBARIA
- Other registrations4 more →
- Completed2 of 5
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on19 May 2023
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed101 files
Current status
Figures as on 27 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bhaveshwar Callista 3 | NA | 22 | 16 | 180 | 18 | 198 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 27 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 58%.
Bhaveshwar Callista 3: 46% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 40% |
| Plinth | 100% |
| Stilt Floor | 25% |
| Slabs of Super Structure | 58% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 14% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 39% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 11% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 16% |
Progress on shared amenities15
As on 27 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 20% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 20% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed272
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Bhaveshwar Callista 3 | NA | Rs 35.51 cr | Rs 21.85 cr |
| - | NA | Rs 1.87 cr | Rs 49.83 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ATUL PATEL ARCHITECTS |
| Engineer | S K Consultants & Engineers |
| Engineer | Mahatm Subhash Yadav |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Rutuja Narsingh & Assocciates |
| Partner | Role in project |
|---|---|
| MANSH BUILDER AND DEVELOPER | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Nov 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Nov 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form 2A.pdf | 27 Jul 2026 |
| Withdrawal Update Form 1File: Bhaveshwar_Callista_3_Form1_Q1_2026-27_14-07-2026_11-49.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Bhaveshwar_Callista_3_Form2_Q1_2026-27_20-07-2026_08-56.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Bhaveshwar_Callista_3_Form3_Q1_2026-27_18-07-2026_13-35_doc1.pdf | 20 Jul 2026 |
| Form 5 (FY 2024-2025)File: Form 5_Bhaveshwar Callista-3 FY 2024-25.pdf | 8 Jun 2026 |
| Withdrawal Update Form 1File: Bhaveshwar Callista 3-form 1.pdf | 21 May 2026 |
| Withdrawal Update Form 2File: Form 2 31032024.pdf | 21 May 2026 |
| Withdrawal Update Form 3File: Form 3 31032024.pdf | 21 May 2026 |
| Form 1File: Form 1 Bhaveshwar Callista.pdf | 22 Apr 2026 |
| Form 2File: Form 2 Bhaveshwar Callista.pdf | 22 Apr 2026 |
| Form 3File: Form 3 Bhaveshwar Callista.pdf | 22 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 Bhaveshwar Callista.pdf | 22 Apr 2026 |
| OthersFile: Disclosure for SecureUnsecure Loan Format.pdf | 22 Apr 2026 |
| Form 1File: Form 1 - Bhaveshwar Callista 3 as March 2026.pdf | 20 Apr 2026 |
| Form 2File: Form 2 - Bhaveshwar Callista 3 as March 2026.pdf | 20 Apr 2026 |
| Form 3File: Form 3 - Bhaveshwar Callista 3 as March 2026.pdf | 20 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Bhaveshwar Callista 3.pdf | 20 Apr 2026 |
| Form 1File: Form 1 - Bhaveshwar Callista-3 as on Dec 2025.pdf | 16 Jan 2026 |
| Form 2File: Form 2 - Bhaveshwar Callista-3 as on Dec 2025.pdf | 16 Jan 2026 |
| Form 3File: Form 3 - Bhaveshwar Callista-3 as on Dec 2025.pdf | 16 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Bhaveshwar Callista-3 as on Dec 2025.pdf | 16 Jan 2026 |
| Form 1File: Form 1 - Bhaveshwar Callista 3 as on Sep 2025.pdf | 13 Oct 2025 |
| Form 2File: Form 2 - Bhaveshwar Callista 3 as on Sep 2025.pdf | 13 Oct 2025 |
| Form 3File: Form 3 - Bhaveshwar Callista 3 as on Sep 2025.pdf | 13 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Bhaveshwar Callista 3 as on Sep 2025.pdf | 13 Oct 2025 |
| Form 1File: Form 1 - Bhaveshwar callista 3 as on June 2025.pdf | 19 Jul 2025 |
| Form 2File: Form 2 - Bhaveshwar Callista 3 as on June 2025.pdf | 19 Jul 2025 |
| Form 3File: Form 3 - Bhaveshwar Callista as on June 2025.pdf | 19 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Bhaveshwar Callista as on June 2025.pdf | 19 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bhaveshwar Callista 3 as on March 2025.pdf | 20 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bhaveshwar Callista-31-03-2025.pdf | 20 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bhaveshwar Callista 3 as on March 2025.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bhaveshwar Callista 3 as on Dec 2024.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3-Bhaveshwar Callista-31-12-2024 to be upload.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bhaveshwar Callista 3 as on Dec 2024.pdf | 15 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bhaveshwar Callista 3 as on Dec 2024.pdf | 15 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bhaveshwar Callista as on June 2024.pdf | 11 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 11 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bhaveshwar Callista 3 as on June 2024.pdf | 11 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bhaveshwar Callista 3 as on June 2024.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Bhaveshwar Callista 3 as on Sep 2024.pdf | 10 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Bhaveshwar Callista 3 as on Sep 2024.pdf | 2 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Bhaveshwar Callista 3 as on Sep 2024.pdf | 2 Dec 2024 |
| Layout approvalFile: ACC DRG (1) 1.pdf | 27 Nov 2024 |
| Building plan approvalFile: ACC DRG (1) 2.pdf | 27 Nov 2024 |
| Building plan approvalFile: ACC DRG (1) 3.pdf | 27 Nov 2024 |
| Building plan approvalFile: ACC DRG (1) 4.pdf | 27 Nov 2024 |
| Building plan approvalFile: ACC DRG (1) 5.pdf | 27 Nov 2024 |
| Building plan approvalFile: ACC DRG (1) 6.pdf | 27 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: ACC DRG (1) 1.pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG (1) 2.pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG (1) 3.pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG (1) 4.pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG (1) 5.pdf | 27 Nov 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: ACC DRG (1) 6.pdf | 27 Nov 2024 |
| Layout approvalFile: ACC DRG_11zon (1).pdf | 23 Nov 2024 |
| Copy of Layout Approval (in case of layout)File: ACC DRG_11zon (1).pdf | 23 Nov 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 10C-Revised CC-25-10-2024.pdf | 23 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Mansh BD 10C.pdf | 26 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31032024.pdf | 24 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31032024.pdf | 24 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: 10C Sold Booked 31032024.pdf | 24 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 31032024.pdf | 24 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10c form 1.pdf | 24 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10c form2.pdf | 24 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: 10C Sold Booked.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10C Form3.pdf | 24 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 10C.pdf | 23 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 10c.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 10C.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold Booked 10C 30092023.pdf | 20 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA - From 3_11zon.pdf | 9 May 2023 |
| Proforma of Allotment letterFile: Allotment Letter_ Bhaveshwar Callista 3_08052023.pdf | 9 May 2023 |
| Proforma of Agreement for saleFile: AFS_Bhaveshwar Callista_ Mansh Builder_08052023.pdf | 9 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Finance-Bhaweshwar Calista 3-Mansh Builders and Developers.pdf | 8 May 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter- Legal-Bhaweshwar Calista 3-Mansh Builders and Developers.pdf | 8 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter- Finance-Bhaweshwar Calista 3-Mansh Builders and Developers.pdf | 8 May 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter- Legal-Bhaweshwar Calista 3-Mansh Builders and Developers.pdf | 8 May 2023 |
| Declaration about Commencement CertificateFile: Format D-Bhaweshwar Calista 3-Mansh Builders and Developers.pdf | 8 May 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|
| MANSH HOMESP52000024503 | PLOT NO 82, Raigarh | Feb 2020 | Completed | Dec 2024 | Jun 2021 |
| MANSH AVENUEP52000013017 | Roadpali, Raigarh | Sep 2017 | Completed | Dec 2023 | Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Bhaveshwar Callista 3 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kalamboli5,900+ in Raigarh
Filed coordinates, straight-line distance. 71 registered projects within 2 km.
Plot No -77 Sector -17 Kalamboli Bus Depot
CITY AND INDUSTRIAL DEVELOPMENT CORPORATIO
BHAVESHWAR AQUA - 1
BHAVESHWAR INFRATECH
ETERNIA
GREENSCAPE DEVELOPERS PRIVATE LIMITED
MONARCH BROOKEFIELDS
MONARCH BROOKEFIELDS LLP
BHAVESHWAR AQUA - 2
BHAVESHWAR INFRATECH
OM REGENCY
OSCAR INFRASTRUCTURE PRIVATE LIMITED
See every Raigarh project, with the district possession charts
Builder: MANSH BUILDER AND DEVELOPER
MANSH BUILDER AND DEVELOPER has 5 registrations on MahaRERA, including MANSH AVENUE and MANSH HOMES. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if Bhaveshwar Callista 3 is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bhaveshwar Callista 3?
The registered promoter entity is MANSH BUILDER AND DEVELOPER, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bhaveshwar Callista 3?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bhaveshwar Callista 3?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bhaveshwar Callista 3?
The professionals named in the filing: Architect: ATUL PATEL ARCHITECTS; Engineer: S K Consultants & Engineers; Engineer: Mahatm Subhash Yadav; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Rutuja Narsingh & Assocciates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bhaveshwar Callista 3?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback