Bhandaary Vertica
By BHANDARY CITY WORLD PRIVATE LIMITED
RG-KA-01683 · RERA PRM/KA/RERA/1257/334/PR/220207/004670 · Last updated on RERA Karnataka portal: 13 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Bhandaary Vertica is a Residential/Group Housing project by BHANDARY CITY WORLD PRIVATE LIMITED in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/220207/004670 on 7 Feb 2022. Possession is promised by 30 Jul 2027. 10 of the 41 units on this registration are recorded sold or booked, and 0 of 19 construction stages are filed complete.
At a glance
Project
- NameBhandaary Vertica
- TypeResidential/Group Housing
- Location
- Mangalore
- Dakshina Kannada
- PincodeNot stated
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1257/334/PR/220207/004670
- ReraGenie IDRG-KA-01683
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on7 Feb 2022
- Promised completion30 Jul 2027
- Revised completionNone
- Buildings1 building record
- Documents filed160 files
Current status
Figures as on 13 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bhandaary Vertica | - | - | - | 41 | 0 | 41 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 13 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
0 of 19 construction stages are filed complete. The stage furthest along is Earth work and other leveling preparation work, at 60%.
Building: 16% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 60% |
| Foundation footing work | 60% |
| Retaining wall (All types) | 0% |
| Plinth level Beam | 28% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| RCC or MS Framed structure | 39% |
| Masonry construction: Bricks, Concrete blocks etc | 39% |
| Plastering inside , outside & Ceiling | 35% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 35% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Painting | 0% |
| Elevation work | 0% |
| Internal and External work including landscapes as per santioned drawings | 0% |
Progress on shared amenities41
As on 13 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Provision for community buildings and for treatment and disposal of sewage and sullage water | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Water conservation | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Education/Health/Other public amenities | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | Yes | 0% |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Gas | Yes | 0% |
| Water and Sanitation | Yes | 0% |
| Air Conditioning And incerntion | Yes | 0% |
| Staircases | Yes | 32% |
| Lifts | Yes | 0% |
| Staircases and Lift lobbies, corridor,lobbies, corridor | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building / common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas and common storage spaces | Yes | 0% |
| Provision for lodging of management staff and security staff | Yes | 0% |
| Water conservation and renewable energy | Yes | 0% |
Land and ownership2
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Mrs. Nikhitha L Bhandary, Director, Bhandary City World P.Ltd | - | - |
| Mr. Lakshmish Bhandary, Managing Director, Bhandary City World Private Limited | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 63.13 cr | Rs 37.65 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 6.10 cr | - |
Certifying professionals and partners2
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Gokul Raj Associates |
| Engineer | Shangvi & Associates Consultant Private Limited |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed160
As listed on the registration, under the names the promoter filed them with; the newest 80 of 160 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/220207/004670 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form 4 vertica.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: form 5 vertica.pdf | 13 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: form 6 vertica.pdf | 13 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 13 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 13 Oct 2026 |
| Q2 2026-27 Fire and Safety | 13 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 13 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 13 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: form4 vertica.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: form5 vertica.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: form6 vertica.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q1 2026-27 Fire and Safety | 14 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 14 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: FORM4 vertica.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5.pdf | 17 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6.pdf | 17 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 17 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 17 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 17 Jan 2026 |
| Q3 2025-26 Fire and Safety | 17 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 17 Jan 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 17 Jan 2026 |
| NOC from Bank as per the hearing that took place on 19/01/2022File: SCDCC BANK NOC.jpeg | 28 Jan 2022 |
| NOC FROM THE LENDING BANK SCDCC BANK, MANGALOREFile: NOC FROM BANK.pdf | 25 Jan 2022 |
| Affidavit with regard to MortgageFile: AFFIDAVIT - Mortgage.pdf | 26 Dec 2021 |
| Proforma of Sale agreement specifying details related to Timeline, Amenities, and other specificatioFile: Draft of Sale Agreement.pdf | 26 Dec 2021 |
| Project Timeline DetailsFile: project time line.pdf | 17 Dec 2021 |
| Project Specification DetaislsFile: specifications vertica.pdf | 17 Dec 2021 |
| Undertaking cum DeclarationFile: undertaking cum declaration.pdf | 17 Dec 2021 |
| Project Loan Approval LetterFile: SCDCC LOAN APP.jpg | 17 Dec 2021 |
| NOC from Water Board AttachedFile: NOC W.pdf | 30 Nov 2021 |
| NOC from MESCOM attachedFile: NOC M (1).pdf | 30 Nov 2021 |
| RERA DESIGNATED BANK ACCOUNT STATEMENTFile: BANK ACCOUNT.jpg | 30 Nov 2021 |
| AUDIT REPORT FOR THE FY 2019-20 ATTACHED WITH CA UDIN NUMBERFile: Audit report.pdf | 20 Sep 2021 |
| PROFIT AND LOSS ACCOUNT STATEMENT FOR THE FY 2019-20 WITH CA UDIN NUMBERFile: PL Statement.pdf | 20 Sep 2021 |
| BALANCE SHEET FOR THE FY 2019-20 WITH CA-UDIN NUMBERFile: Balance sheet.pdf | 20 Sep 2021 |
| IRREGULAR SITE PLAN OF THE PROJECTFile: Irregular Site PLan.jpg | 20 Sep 2021 |
| SITE PLAN OF THE PROJECTFile: Site plan.jpg | 20 Sep 2021 |
| SECTION ELEVATION AND KEY PLAN OF THE PROJECTFile: Key Plan.jpg | 20 Sep 2021 |
| BASEMENT PLAN OF THE PROJECTFile: Basement.jpg | 20 Sep 2021 |
| GROUND FLOOR PLAN OF THE PROJECTFile: Gr Flr Plan.jpg | 20 Sep 2021 |
| FIRST SECOND AND THIRD FLOOR PLAN OF THE PROJECTFile: Floor Plan.jpg | 20 Sep 2021 |
| AND 50 AND 53 AND TERRACE FLOOR PLANFile: Flr Plan.jpg | 20 Sep 2021 |
| TYPICAL LOWER AND UPPER DUPLEX FLOOR PLANFile: Duplex Plan.jpg | 20 Sep 2021 |
| ACKNOWLEDGEMENT COPY OF BSNL NOC. WE WILL SUBMIT THE NOC AS SOON AS WE RECEIVE THE SAMEEFile: BSNL NOC.jpg | 20 Sep 2021 |
| ACKNOWLEDGEMENT COPY OF WATER BOARD NOC. WE WILL SUBMIT AS SOON AS WE RECEIVE THE SAMEFile: WATER NOC.jpg | 20 Sep 2021 |
| ACKNOWLEDGEMENT COPY OF MESCOM NOC. WE WILL SUBMIT THE NOC AS SOON AS WE RECEIVE ITFile: MESCOM NOC.jpg | 20 Sep 2021 |
| TDR RELINQUISHMENT DEED FOR THE LAND SURRENDERED TO THE LOCAL BODYFile: TDR RELINQUISHMENT DEED.pdf | 20 Sep 2021 |
| DR CERTIFICATE OF LOCAL BODY FOR RELINQUISHMENT OF LAND FOR ROADS, SEPARATE DEED IS NOT AVAILABLEFile: RELINQUISHMENT LETTER.pdf | 20 Sep 2021 |
| REQUISITION FOR CHANGE IN PROMOTERS NAMEFile: REQUISITION FOR CHANGE IN PROMOTER NAME.pdf | 6 Sep 2021 |
| CERTIFICATE OF INCORPORATION OF THE PROMOTER M/S BHANDARY CITY WORLD PRIVATE LIMITEDFile: Bhandary City World Incorporation Certificate.pdf | 6 Sep 2021 |
| BANK ACCOUNT PASS BOOK IN THE NAME OF PROMOTER AS PER RERA DIRECTIONFile: BANK PASS BOOK AS PER RERA REQUIREMENT.pdf | 6 Sep 2021 |
| AUDIT REPORT OF THE PROMOTING COMPANY WITH CA UDIN NUMBERFile: Audit report- 19-20 with UDIN NUMBER OF CA.pdf | 6 Sep 2021 |
| FINANCIAL STATEMENT OF THE PROMOTING COMPANY WITH CA UDIN NUMBERFile: PROFIT & LOSS ACCOUNT WITH UDIN NUMBER.pdf | 6 Sep 2021 |
| BALANCE SHEET OF THE PROMOTING COMPANY WITH CA UDIN NUMBERFile: BALANCE SHEET WITH UDIN NUMBER.pdf | 6 Sep 2021 |
| FORM B DECLARATION AS PER RERA FORMATFile: Form B Declaration.pdf | 6 Sep 2021 |
| UPDATED EC WITH THE NAME OF THE PROMOTING COMPANY AND ITS DIRECTORSFile: UPDATED EC WITH NAME OF LAKSHMISH HANDARY & NIKHITA BHANDARY.pdf | 6 Sep 2021 |
| SALE DEED IN FAVOUR OF PROMOTING COMPANY AND LAKSHMISH BHNADARY AND NIKHITA BHANDARYFile: LAND SALE DEED 1 in favour of Lakshmish Bhandary and Nikhita Bhandary.pdf | 6 Sep 2021 |
| SALE DEED IN FAVOUR OF PROMOTING COMPANY AND LAKSHMISH BHANDARY AND NIKHITA BHANDARYFile: LAND SALE DEED in favour of Lakshmish Bhandary & Nikhita Bhandary.pdf | 6 Sep 2021 |
| IRREGULAR SITE PLAN OF PROJECT BHANDARY VERTICAFile: Irregular Site PLans of Bhandary Vertica.jpg | 6 Sep 2021 |
| SITE PLAN OF PROJECT BHANDARY VERTICAFile: Site Plan of Bhandary Vertica.jpg | 6 Sep 2021 |
| BASEMENT FLOOR PLAN OF PROJECT BHANDARY VERTICAFile: Basement Floor Plan of Bhandary Vertica.jpg | 6 Sep 2021 |
| GROUND FLOOR PLAN OF PROJECT BHANDARY VERTICAFile: Ground Floor PLan of Bhandary Vertica.jpg | 6 Sep 2021 |
| 1ST 2ND AND 3RD FLOOR PLAN OF PROJECT BHANDARY VERTICAFile: 1st 2nd and 3rd floor Plan of Bhnadary Vertica.jpg | 6 Sep 2021 |
| 49TH 50TH AND 53RD FLOOR PLAN OF BHANDARY VERTCAFile: 49th 50th and 53rd floor Plan of Bhandary Vertica.jpg | 6 Sep 2021 |
| SECTION ELEVATION AND KEY PLAN OF BHANDARY VERTICAFile: Section, Elevation & Key Plan of Bhandary Vertica.jpg | 6 Sep 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Dakshina Kannada
Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.
Keep Bhandaary Vertica on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dakshina Kannada620+ in Dakshina Kannada
Filed coordinates, straight-line distance. 28 registered projects within 2 km.
ROHAN CITY
ROHAN CORPORATION INDIA PRIVATE LIMITED
Bearys Turning Point
Bearys Properties and Developments Private
YAMUNA SKY CITY
YAMUNA HOMES AND DESIGN PRIVATE LIMITED
The Marian Park
Marian Projects Pvt Ltd
Sai Matha Garden
Matha Developers Pvt Ltd
ROHAN MARINA ONE
ROHAN PLAZA PRIVATE LIMITED
See every Dakshina Kannada project, with the district possession charts
Builder: BHANDARY CITY WORLD PRIVATE LIMITED
BHANDARY CITY WORLD PRIVATE LIMITED has 3 registrations on RERA Karnataka, including BHANDARY CANYON and BHANDARY INIHA BUSINESS CENTRE. Its filings declare 2 earlier projects, none of them declared completed. Read the full track record. See more projects on the Dakshina Kannada district page.
Frequently asked questions
What are my rights if Bhandaary Vertica is delayed beyond 30 Jul 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Bhandaary Vertica?
The registered promoter entity is BHANDARY CITY WORLD PRIVATE LIMITED, a company as per the filing. Its CIN U45205KA2014PTC073412 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Bhandaary Vertica?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Bhandaary Vertica?
The professionals named in the filing: Architect: Gokul Raj Associates; Engineer: Shangvi & Associates Consultant Private Limited. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bhandaary Vertica?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.