Home / Browse projects / Palghar, Maharashtra / BHAKTI PARK

Registered No litigation declared Residential / Group Housing project

BHAKTI PARK

By MHATRE REALTORS

RG-MH-08714 · RERA P99000002478 · Last updated on MahaRERA portal: 4 Jun 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 85 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 85 months from the original
18 of 22Construction stages doneacross 2 buildings; furthest along: Sanitary Fittings within the flats /..., 95%
39 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 160 documents Report an error

BHAKTI PARK is a Residential / Group Housing project by MHATRE REALTORS in Palghar, Maharashtra, registered with MahaRERA as P99000002478 on 1 Aug 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 85 months from the original filing. 20 of the 59 units on this registration are recorded sold or booked, and 18 of 22 construction stages are filed complete.

At a glance

Project

  • NameBHAKTI PARK
  • TypeResidential / Group Housing
  • Location
    • Mahim Road
    • Mahim
    • Palghar
    • 401402
  • Pincode401402
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000002478
  • ReraGenie IDRG-MH-08714

Builder

  • NameMHATRE REALTORS
  • Entity typePartnership
  • PartnersMANISH KAMALAKAR MHATRE, YOGESH KAMALAKAR MHATRE

Key dates

this monthRegisteredAug 2017First promiseNov 2020Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Aug 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 30 Nov 2020)
  • Buildings2 building records
  • Documents filed160 files

Current status

34%20 of 59 units booked
96.4%Work done, per cost certificate

Figures as on 4 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA6635035
B WINGNA6624024

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 95%.

A WING90%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises95%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING82%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,520 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jan 2026
LandownerVillageDistrict
SHARAD KRISHNARAO RAUTMahimPalghar

Approvals and building plan

Sanctioning authorityPalghar District council
Permissible FSI2810.44
Proposed, not sanctioned2,810 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMAHIM, TALUKA AND DISTRICT PALGHAR
Estimated costRs 7.42 cr
Cost incurredRs 7.15 cr
Work done96.38%
BuildingWingEstimatedIncurred
A WINGNARs 5.36 crRs 5.10 cr
B WINGNARs 1.78 crRs 1.78 cr
-NARs 27.03 lakhRs 27.03 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHRIKANT YEWALE ANJALI ASSOCIATES
ArchitectAnjali Associates
EngineerMAHENDRAKUMAR RANE
Chartered AccountantBharat Dhonde & Co.
Chartered AccountantMohammad Memon
PartnerRole in project
MHATRE REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000012261Nov 2020 → Dec 2027

Reason as filed by the promoterReasons for extension 1. We registered the Project consisting of two Buildings. Building A and Building B. 2. Due to market forces we could start and complete Building B only for which Occupation Certificate from Competent Authority was received on 24.12.2019 which is within the project completion date. 3. Meanwhile, we faced lots of issues from Demonetization , implementation of GST, then ultimately Corona Pandemic and after completing one building ( Building B), we are now ready to commence Building A. 4. The plans of Building A are revised and revised documents and details have been uploade

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Jul 2022

Documents filed160

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 160 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 5 (FY 2025-2026)File: Form 5 Mhatre Realtors FY 25-26.pdf4 Jun 2026
Withdrawal Update Form 1File: Form 1.pdf28 Apr 2026
Withdrawal Update Form 2File: Form 2.pdf28 Apr 2026
Withdrawal Update Form 3File: Form-3 Mhatre Realtors Mar-2026.pdf28 Apr 2026
Form 5 (FY 2024-2025)File: Mhatre Realtors_FORM 5 FY 2024-25.pdf21 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf31 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf31 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf31 Jan 2026
Form 1File: Form 1.pdf27 Nov 2025
Form 2File: Form 2.pdf27 Nov 2025
Form 3File: Form 3.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf27 Nov 2025
Form 1File: Form 1.pdf27 Nov 2025
Form 2File: Form 2 .pdf27 Nov 2025
Form 3File: Form 3.pdf27 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold.pdf27 Nov 2025
Form 1File: Form 1 as on 08-04-2024.pdf25 Nov 2025
Form 2File: FORM 2 as on 08-04-2024.pdf25 Nov 2025
Form 3File: Form 3 as on 31-03-24.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold.pdf25 Nov 2025
Form 1File: Form 1.pdf25 Nov 2025
Form 2File: Form 2 as on 30-06-2024.pdf25 Nov 2025
Form 3File: Form 3 .pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Unsold.pdf25 Nov 2025
Form 1File: Form 1 as on 30-09-2024.pdf25 Nov 2025
Form 2File: Form 2 as on 30-09-2024.pdf25 Nov 2025
Form 3File: Form 3 as on 30-09-2024.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold unsold as on 30-09-2024.pdf25 Nov 2025
Form 1File: Form 1 as on 31-12-2024.pdf25 Nov 2025
Form 2File: Form 2 as on 31-12-2024.pdf25 Nov 2025
Form 3File: Form 3 as on 31-12-2024.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold as on 31-12-2024.pdf25 Nov 2025
Form 1File: Form 1- Mar 25.pdf25 Nov 2025
Form 2File: Form 2.pdf25 Nov 2025
Form 3File: Form 3.pdf25 Nov 2025
Disclosure of Sold and Booked InventoryFile: disclosure of sold unsold.pdf25 Nov 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 31-12-2024.pdf28 Jan 2025
Certificates of CA (Form 3)File: Form 3 as on 31-12-2024.pdf28 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 31-12-2024.pdf28 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Sold as on 31-12-2024.pdf28 Jan 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30-09-2024.pdf4 Dec 2024
Certificates of CA (Form 3)File: Form 3 as on 30-09-2024.pdf4 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30-09-2024.pdf4 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold as on 30-09-2024.pdf4 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mhatre Realtors.pdf2 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf14 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30-06-2024.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 as on 30-06-2024.pdf13 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.pdf13 Aug 2024
Certificates of CA (Form 3)File: Form 3 as on 30th June 2024_11zon (1).pdf13 Aug 2024
Commencement Certificates / NA Order for plotted developmentFile: Appendix-F.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A declaration.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A declaration.pdf2 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A declaration.pdf2 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold as on 30-04-2024(New).pdf26 Jun 2024
Certificates of CA (Form 3)File: Form 3 as on 30-04-24.pdf26 Jun 2024
Layout approvalFile: Updated Highlighted Layout.pdf11 Jun 2024
Copy of Layout Approval (in case of layout)File: Updated Highlighted Layout.pdf11 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 08-04-2024.pdf6 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 as on 08-04-2024.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold.pdf6 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold as on 30-04-2024.pdf6 Jun 2024
Certificates of CA (Form 3)File: Form 3 as on 31-03-24.pdf6 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 2 Form 1 as on 04-07-2020.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 3 Form 1 as on 04-10-2020.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 4 Form 1 as on 05-01-2021.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 5 Form 1 as on 04-04-2021.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 6 Form 1 as on 06-07-2021.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 7 Form 1 as on 05-10-2021.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 8 Form 1 as on 05-01-2022.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 9 Form 1 as on 06-04-2022.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 10 Form 1 as on 15-06-2022.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 11 Form 1 as on 04-10-2022.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 12 Form 1 as on 04-04-2023.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 13 Form 1 as on 05-07-2023.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 14 Form 1 as on 30-09-2023.pdf18 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 15 Form 1 as on 04-01-2024.pdf18 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 1 From 2 as on 04-01-2020.pdf18 Mar 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 2 Form 2 as on 06-04-2020.pdf18 Mar 2024

How this compares with Palghar

34%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 85 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAKTI PARK on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mahim3,200+ in Palghar

2 kmBHAKTI PARKCompleted 14Lapsed / revoked 12Other 13Dot size: filed unitsN

Filed coordinates, straight-line distance. 39 registered projects within 2 km.

Builder: MHATRE REALTORS

MHATRE REALTORS has 1 registration on MahaRERA, including BHAKTI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if BHAKTI PARK is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAKTI PARK?

The registered promoter entity is MHATRE REALTORS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAKTI PARK?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAKTI PARK?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAKTI PARK?

The professionals named in the filing: Architect: SHRIKANT YEWALE ANJALI ASSOCIATES; Architect: Anjali Associates; Engineer: MAHENDRAKUMAR RANE; Chartered Accountant: Bharat Dhonde & Co.; Chartered Accountant: Mohammad Memon. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAKTI PARK?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAKTI PARK. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAKTI PARK to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.