Home / Browse projects / Palghar, Maharashtra / BAFNA LUXURIA

Registered No litigation declared Residential / Group Housing project

BAFNA LUXURIA

By SHRUSHTI DEVELOPERS

RG-MH-34654 · RERA P99000050574 · Last updated on MahaRERA portal: 22 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
30 of 99Construction stages doneacross 9 buildings; furthest along: Internal walls, 95%
27 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 123 documents Report an error

BAFNA LUXURIA is a Residential / Group Housing project by SHRUSHTI DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000050574 on 21 Apr 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 40 of the 67 units on this registration are recorded sold or booked, and 30 of 99 construction stages are filed complete.

At a glance

Project

  • NameBAFNA LUXURIA
  • TypeResidential / Group Housing
  • Location
    • PALGHAR MAHIM ROAD
    • Vaghulsar
    • Mahim
    • Palghar
    • 401402
  • Pincode401402
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000050574
  • ReraGenie IDRG-MH-34654

Builder

  • NameSHRUSHTI DEVELOPERS
  • Entity typePartnership
  • PartnersRAJESH SOHANLAL BAFNA, BHAVESH SOHANLAL BAFNA
  • Other registrations13 more →
  • Completed6 of 14
  • No longer live6 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredApr 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings9 building records
  • Documents filed123 files

Current status

60%40 of 67 units booked
95.7%Work done, per cost certificate

Figures as on 22 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Type F Bldg no 1NA111059059
Type A Bungalow no 02NA11101
Type B Bungalow no 01NA11101
Type B1 Bungalow no 03NA11101
Type B1 Bungalow no 04NA11101
Type C Bungalow no 05NA11101
Type D Bungalow no 06NA11101
Type D Bungalow no 07NA11101
Type E Bungalow no 08NA11101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building9

As on 22 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 99 construction stages are filed complete across 9 buildings. The stage furthest along is Internal walls, at 95%.

Type F Bldg no 180%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Type A Bungalow no 0269%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Type B Bungalow no 0132%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Type B1 Bungalow no 0330%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Type B1 Bungalow no 0433%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks20%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Type C Bungalow no 0537%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.20%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Type D Bungalow no 0649%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.20%
Type D Bungalow no 0755%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%
Type E Bungalow no 0842%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.30%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.10%

Progress on shared amenities15

As on 22 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes40%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes20%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Open Space19
BuildingOpen SpaceTotal
Type F Bldg no 155
Type A Bungalow no 0222
Type B Bungalow no 0122
Type B1 Bungalow no 0311
Type B1 Bungalow no 0411
Type C Bungalow no 0522
Type D Bungalow no 0622
Type D Bungalow no 0722
Type E Bungalow no 0822

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,717 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on13 Nov 2025
LandownerVillageDistrict
Giridhar MishraPalghar Palghar

Approvals and building plan

Sanctioning authorityDISTRICT COLLECTOR PALGHAR
Permissible FSI10563.84
Proposed, not sanctioned8,446 sq m
Buildings approved9
Buildings sanctioned9

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPACH BATII , PALGHAR WEST
Estimated costRs 17.29 cr
Cost incurredRs 16.54 cr
Work done95.65%
BuildingWingEstimatedIncurred
Type F Bldg no 1NARs 12.74 crRs 12.71 cr
-NARs 55.00 lakh-
Type D Bungalow no 06NARs 53.54 lakhRs 53.54 lakh
Type D Bungalow no 07NARs 53.54 lakhRs 53.54 lakh
Type B Bungalow no 01NARs 51.56 lakhRs 50.53 lakh
Type A Bungalow no 02NARs 50.01 lakhRs 49.01 lakh
Type B1 Bungalow no 03NARs 50.01 lakhRs 40.01 lakh
Type B1 Bungalow no 04NARs 50.01 lakhRs 45.01 lakh
Type C Bungalow no 05NARs 45.61 lakhRs 45.61 lakh
Type E Bungalow no 08NARs 45.61 lakhRs 45.61 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectYogesh Mhatre Mhatre
EngineerHiren M Tanna M TANNA
EngineerHIMANSHU J RAUT
Chartered AccountantZenith m Jain M Jain
Chartered AccountantHEMA SACHDEV SACHDEV
Chartered AccountantN J Shah & Associates LLP
Chartered AccountantN J SALOT AND ASSOCIATES
PartnerRole in project
SHRUSHTI DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31122519198Dec 2025 → Dec 2026

Reason as filed by the promoterWe are committed to completing the project at the earliest and expect to wrap up all pending tasks within the extended period. We assure MahaRERA that we remain fully compliant with regulations and continue to prioritize the interests of homebuyers.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed123

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 123 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: JUN26-FORM-BAFNA LUXURIA.pdf22 Aug 2026
Withdrawal Update Form 2File: JUN26-FORM2-BAFNA LUXURIA.pdf22 Aug 2026
Withdrawal Update Form 3File: JUN26-FORM3-BAFNA LUXURIA.pdf22 Aug 2026
Withdrawal Update Form 1File: MAR26-FORM1-BAFNA LUXURIA.pdf5 May 2026
Withdrawal Update Form 2File: MAR26-FORM2-LUXURIA.pdf5 May 2026
Withdrawal Update Form 3File: MAR26 FORM3 LUXURIA.pdf5 May 2026
Withdrawal Update Form 1File: Dec25-FORM1-LUXURIA_15012026.pdf9 Feb 2026
Withdrawal Update Form 2File: Luxuria Withdrawal Application Form2 (1).pdf9 Feb 2026
Withdrawal Update Form 3File: Form3- Bafna Luxuria - Dec 25.pdf9 Feb 2026
Form 2File: JUN23-FORM2-BAFNA LUXURIA.pdf31 Dec 2025
Form 3File: JUN23-FORM3-BAFNA LUXURIA.pdf31 Dec 2025
Form 1File: SEP23-FORM1-BAFNA LUXURIA.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: SEP23-SOLDUNSOLD-BAFNA LUXURIA.pdf31 Dec 2025
Form 1File: MAR25-FORM1-BAFNA LUXURIA.pdf31 Dec 2025
Form 2File: MAR25-FORM2-BAFNA LUXURIA.pdf31 Dec 2025
Form 3File: MAR25-FORM3-BAFNA LUXURIA.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: MAR25-SOLDUNSOLD-BAFNA LUXURIA.pdf31 Dec 2025
Form 1File: SEP23-FORM1-BAFNA LUXURIA.pdf31 Dec 2025
Form 3File: SEP23-FORM3-BAFNA LUXURIA.pdf31 Dec 2025
Disclosure of Sold and Booked InventoryFile: SEP23-SOLDUNSOLD-BAFNA LUXURIA.pdf31 Dec 2025
Form 2File: FORM 2 JUN 23.pdf31 Dec 2025
Withdrawal Update Form 1File: JUN25-FORM1-BAFNA LUXURIA.pdf29 Dec 2025
Withdrawal Update Form 1File: SEP25-FORM1-LUXURIA.pdf29 Dec 2025
Withdrawal Update Form 1File: SEP25-FORM1-LUXURIA.pdf29 Dec 2025
Withdrawal Update Form 2File: JUN25-FORM2-BAFNA LUXURIA (2).pdf29 Dec 2025
Withdrawal Update Form 2File: JUN25-FORM2-BAFNA LUXURIA (2).pdf29 Dec 2025
Withdrawal Update Form 2File: SEP25-FORM2-LUXURIA.pdf29 Dec 2025
Withdrawal Update Form 3File: JUNE25-FORM3-LUXURIA_27122025.pdf29 Dec 2025
Withdrawal Update Form 3File: SEP25-FORM3-LUXURIA.pdf29 Dec 2025
Withdrawal Update Form 3File: SEP25-FORM3-LUXURIA.pdf29 Dec 2025
Form 2A (FY 2023-2024)File: Form2A-Bafna Luxuria-22-23 .pdf29 Dec 2025
Form 2A (FY 2024-2025)File: Form2A-Bafna Luxuria-23-24.pdf29 Dec 2025
Form 2A (FY 2025-2026)File: Form2A-Bafna Luxuria-24-25.pdf29 Dec 2025
Form 5 (FY 2023-2024)File: FORM5-LUXURIA23-24.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: FORM5-LUXURIA24-25.pdf21 Nov 2025
Form 1File: MAR25-FORM1.pdf8 Sep 2025
Form 2File: Form2-Mar25_000275.pdf8 Sep 2025
Form 3File: MAR25-FORM3.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: MAR25-SOLDUNSOLD.pdf8 Sep 2025
Form 1File: DEC24-FORM1.pdf8 Sep 2025
Form 2File: Form2-Dec24_000274.pdf8 Sep 2025
Form 3File: DEC24-FORM3.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: DEC24-SOLDUNSOLD.pdf8 Sep 2025
Form 1File: SEP24-FORM1.pdf8 Sep 2025
Form 2File: Form2-Sep24_000276.pdf8 Sep 2025
Form 3File: SEP24-FORM3.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: SEP24-SOLDUNSOLD.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: JUN24-SOLDUNSOLD.pdf8 Sep 2025
Form 1File: JUN24-FORM1.pdf8 Sep 2025
Form 2File: Form2-Jun24_000277.pdf8 Sep 2025
Form 3File: JUN24-FORM3.pdf8 Sep 2025
Form 1File: MAR24-FORM1.pdf8 Sep 2025
Form 2File: Form2-mar24_000278.pdf8 Sep 2025
Form 3File: MAR24-FORM3.pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: MAR24-SOLDUNSOLD_000228.pdf8 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE - 2 RERA CERTIFICATE.pdf20 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert March25 LUX.pdf9 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD LUXURIA DEC24.pdf7 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch cert dec24 1.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 LUXURIA MAR24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 LUXURIA JUN24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 LUXURIA SEP24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Luxuria Sold Unsold Sep 24.pdf6 Jan 2025
Disclosure of sold/ booked inventoryFile: LUXURIA SOLD UNSOLD_000112.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LUXURIA ART_000295_compressed.pdf21 Jul 2024
Disclosure of sold/ booked inventoryFile: LUXURIASOLD UNSOLD _000049.pdf20 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bafna Luxuria CA Certificate _000133.pdf21 Feb 2024
Disclosure of sold/ booked inventoryFile: LUXURIA SOLD UNSOLD _000095.pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: LUXURIA ART CERTIFICATE _000072.pdf21 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BAFNA LUXURIA CA CERTIFICATE _000052.pdf25 Nov 2023
Disclosure of sold/ booked inventoryFile: Luxuria Sold-Unsold Inventory_000013.pdf16 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BAFNA LUXURIA ART CERTIFICATE _000004_.pdf12 Oct 2023
Proforma of Agreement for saleFile: Draft Agreement Final.pdf17 Aug 2023
Layout approvalFile: Sheet - 1 N H.pdf11 Aug 2023
Building plan approvalFile: Sheet - 8 N H.pdf11 Aug 2023
Building plan approvalFile: Sheet - 9 N H.pdf11 Aug 2023
Copy of Layout Approval (in case of layout)File: Sheet - 1 N H.pdf11 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet - 8 N H.pdf11 Aug 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet - 9 N H.pdf11 Aug 2023
Declaration about Commencement CertificateFile: New CC Bafna Luxuria-compressed.pdf11 Aug 2023

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

5 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
ELITEP99000035038TEMBHODE, Palghar-Apr 2022CompletedDec 2024Jul 2024
CLASSIQUEP99000014864NEAR NAVALI PHATAK, Palghar-Jan 2018CompletedDec 2022Mar 2020
ELEGANCEP99000014549Palghar-Dec 2017CompletedDec 2021Jan 2021
SHUBH-AANGANP99000016774NEAR JOGGERS PARK, Palghar-Jun 2018CompletedDec 2020Late, Oct 2021
SAURAMYAS. NO 78 PART PLOT NO 1 NEAR ISKON TEMPLE PALGHAR EAST22-CompletedDec 2015Nov 2015
THE SHRUSHTITHE SHRUSHTI MAHIM ROAD NEAR HANUMAN MANDIR15-CompletedJun 2014Apr 2014

How this compares with Palghar

60%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 12 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BAFNA LUXURIA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vaghulsar3,200+ in Palghar

2 kmBAFNA LUXURIACompleted 36Lapsed / revoked 29Other 32Dot size: filed unitsN

Filed coordinates, straight-line distance. 97 registered projects within 2 km.

Builder: SHRUSHTI DEVELOPERS

SHRUSHTI DEVELOPERS has 14 registrations on MahaRERA, including OXYGEN VALLY ANEX and BHUDEVI TOWER. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 6 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if BAFNA LUXURIA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BAFNA LUXURIA?

The registered promoter entity is SHRUSHTI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BAFNA LUXURIA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BAFNA LUXURIA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BAFNA LUXURIA?

The professionals named in the filing: Architect: Yogesh Mhatre Mhatre; Engineer: Hiren M Tanna M TANNA; Engineer: HIMANSHU J RAUT; Chartered Accountant: Zenith m Jain M Jain; Chartered Accountant: HEMA SACHDEV SACHDEV; Chartered Accountant: N J Shah & Associates LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAFNA LUXURIA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAFNA LUXURIA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAFNA LUXURIA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.