Home / Browse projects / Palghar, Maharashtra / Bhakti Greens

Registered No litigation declared Residential / Group Housing project

Bhakti Greens

By ombhaktiventures

RG-MH-20524 · RERA P99000012268 · Last updated on MahaRERA portal: 22 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 96 months
  • 4 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 96 months from the original
559 of 660Construction stages doneacross 60 buildings; furthest along: Podiums (if any), 0%
10 of 60Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 78 documents Report an error

Bhakti Greens is a Residential / Group Housing project by ombhaktiventures in Palghar, Maharashtra, registered with MahaRERA as P99000012268 on 1 Sep 2017. Possession is promised by 31 Dec 2027. The completion date has moved by 96 months from the original filing. 50 of the 60 units on this registration are recorded sold or booked, and 559 of 660 construction stages are filed complete.

At a glance

Project

  • NameBhakti Greens
  • TypeResidential / Group Housing
  • Location
    • SHIRSAD
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000012268
  • ReraGenie IDRG-MH-20524

Builder

  • Nameombhaktiventures
  • Entity typePartnership
  • PartnersAjay Sureshchandra Shah, Nitin Kamalkumar Jain, Tapan Govindkumar Shah, Shyam Govindkumar Shah

Key dates

this monthRegisteredSep 2017First promiseDec 2019Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2017
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2019)
  • Buildings60 building records
  • Documents filed78 files

Current status

83%50 of 60 units booked

Figures as on 22 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bhakti Greens-7NA00101
Bhakti Greens-8NA00101
Bhakti Greens-9NA00101
Bhakti Greens-10NA00101
Bhakti Greens-11NA00101
Bhakti Greens-12NA00101
Bhakti Greens-12ANA00101
Bhakti Greens-14NA00101
Bhakti Greens-15NA00101
Bhakti Greens-16NA00101
Bhakti Greens-17NA00101
Bhakti Greens-18NA00101
Bhakti Greens-19NA00101
Bhakti Greens-20NA00101
Bhakti Greens-21NA00101
Bhakti Greens-22NA00101
Bhakti Greens-23NA00101
Bhakti Greens-24NA00101
Bhakti Greens-25NA00101
Bhakti Greens-26NA00101
Bhakti Greens-27NA00101
Bhakti Greens-28NA00101
Bhakti Greens-29NA00101
Bhakti Greens-30NA00101
Bhakti Greens-31NA00101
Bhakti Greens-32NA00101
Bhakti Greens-33NA00101
Bhakti Greens-34NA00101
Bhakti Greens-36NA00101
Bhakti Greens-35NA00101
Bhakti Greens-37NA00101
Bhakti Greens-38NA00101
Bhakti Greens-39NA00101
Bhakti Greens-40NA00101
Bhakti Greens-41NA00101
Bhakti Greens-42NA00101
Bhakti Greens-43NA00101
Bhakti Greens-44NA00101
Bhakti Greens-45NA00101
Bhakti Greens-46NA00101
Bhakti Greens-47NA00101
Bhakti Greens-48NA00101
Bhakti Greens-49NA00101
Bhakti Greens-50NA00101
Bhakti Greens-51NA00101
Bhakti Greens-52NA00101
Bhakti Greens-53NA00101
Bhakti Greens-54NA00101
Bhakti Greens-55NA00101
Bhakti Greens-56NA00101
Bhakti Greens-57NA00101
Bhakti Greens-58NA00101
CFC Centre-59NA00011
Club House-60NA00011
Bhakti Greens-3NA00101
Bhakti Greens-4NA00101
Bhakti Greens-5NA00101
Bhakti Greens-6NA00101
Bhakti Greens-1NA00101
Bhakti Greens-2NA00101

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building20

As on 22 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection. The count above covers all 60 buildings; the table lists the first 20.

559 of 660 construction stages are filed complete across 60 buildings. The stage furthest along is Podiums (if any), at 0%.

Bhakti Greens-791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-12A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1791%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1891%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-1991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2391%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2491%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2591%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bhakti Greens-2691%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 22 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Land and ownership3

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,130 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jan 2026
LandownerVillageDistrict
Pramod Sakharam PatilThane (M Corp.)Thane
Janardan Waman PatilThane (M Corp.)Thane
Keshav Vaman PatilThane (M Corp.)Thane

Approvals and building plan

Sanctioning authorityvvcmc
Permissible FSI3454.99
Proposed, not sanctioned3,455 sq m
Buildings approved60
Buildings sanctioned60

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchVishnu Prasad Complex, Padma Colony, Padma Colony Rd, Virar West, Maharashtra 401303

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectS S Jain & Associates
ArchitectKeyur Thakker & Associates
EngineerSS & Associates
Chartered AccountantAniket M Padhye
Chartered AccountantASHWIN NAIR
PartnerRole in project
ombhaktiventures-

Extensions applied for4

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000008399Dec 2019 → Jun 2021

Reason as filed by the promoterDue to COVID-19 and Market Situation, we need an Extension of the Time Limit for Completing the Project.

EXT99000010210Dec 2019 → Dec 2023

Reason as filed by the promoterProject got Delay due to COVID 19.

EXT99000018567Dec 2019 → Dec 2025

Reason as filed by the promoterDUE TO SOME UNAVOIDABLE REASONS THE PROJECT COULD NOT BE COMPLETED ON TIME

EA09012619378Dec 2019 → Dec 2027

Reason as filed by the promoterDUE TO SOME UNAVOIDABLE REASONS THE PROJECT CANNOT BE COMPLETED BEFORE TIME

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 24 Feb 2025

Documents filed78

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 MARCH 2026.pdf22 Sep 2026
Withdrawal Update Form 1File: FORM 1 JUNE 2026_11zon.pdf22 Sep 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf22 Sep 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2026.pdf22 Sep 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf22 Sep 2026
Withdrawal Update Form 3File: FORM 3 JUNE 2026.pdf22 Sep 2026
Withdrawal Update Form 1File: FORM 1 MAR 2026_11zon.pdf14 Jul 2026
Withdrawal Update Form 2File: FORM 2 MAR 2026.pdf14 Jul 2026
Withdrawal Update Form 3File: FORM 3 MAR 2026.pdf14 Jul 2026
Form 2A (FY 2025-2026)File: FORM 2A.pdf14 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5 25-26.pdf14 Jul 2026
Withdrawal Update Form 1File: form 1 dec 23.pdf9 Jan 2026
Withdrawal Update Form 1File: form 1 dec 23.pdf9 Jan 2026
Withdrawal Update Form 2File: FORM 2 JUNE 2025.pdf9 Jan 2026
Withdrawal Update Form 2File: FORM 2 SEPT 2025.pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 3 JUNE 2025.pdf9 Jan 2026
Withdrawal Update Form 3File: FORM 3 SEPT 2025.pdf9 Jan 2026
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupation Certificate Bhaktigreens 1.pdf24 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC of om bhakti ventures 2.pdf24 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: O C of om bhakti greens 3.pdf24 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: CFC OC OF BHAKTI GREENS 4.pdf24 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 23.pdf2 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2dec 23.pdf2 Feb 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2a fy 22-23.pdf2 Feb 2024
Declaration in FORM BFile: FORM B-OM BHAKTI.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A.pdf15 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf15 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 mar 23.pdf13 Jan 2024
Declaration about Commencement CertificateFile: Format D.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY 21.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY2122.pdf29 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 FY2223.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 FY2021.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 FY2122.pdf29 Dec 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 FY2223.pdf29 Dec 2023
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY2021.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY2122.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY2122.pdf29 Dec 2023
Certificates of CA (Form 3)File: FORM 3 FY2223.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 FY2021.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY2122.pdf29 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY2223.pdf29 Dec 2023
Declaration about Commencement CertificateFile: Rera format D CC Declaration Circular 32.pdf3 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera 2018 architect certificate om bhakt_compressed.pdf3 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera 2019 architect certificate om bhakt_compressed.pdf3 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera 2020 architect certificate om bhakt_compressed.pdf3 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera 2018 engineer certificate om bhakti_compressed.pdf3 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera 2019 engineer certificate om bhakti_compressed.pdf3 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Rera 2020 engineer certificate om bhakti_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: first quarter form 2A Rera year 2019_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: second quarter form 2A Rera year 2019_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: third quarter form 2A Rera year 2019_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: fourth quarter form 2A Rera year 2019_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: first quarter form 2A Rera year 2020_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: second quarter form 2A Rera year 2020_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: third quarter form 2A Rera year 2020_compressed.pdf3 Jan 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: fourth quarter form 2A Rera year 2020_compressed.pdf3 Jan 2022
Disclosure of sold/ booked inventoryFile: Rera sold unsold inventory Circular 29.pdf3 Jan 2022
Certificates of CA (Form 3)File: Rera certificate CA 17 18.pdf3 Jan 2022
Certificates of CA (Form 3)File: Rera certificate CA 18 19.pdf3 Jan 2022
Certificates of CA (Form 3)File: Rera certificate CA 19 20.pdf3 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Rera certificate CA 17 18.pdf3 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Rera certificate CA 18 19.pdf3 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Rera certificate CA 19 20.pdf3 Jan 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate17.pdf31 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate9.pdf31 Jul 2017
Certificates of CA (Form 3)File: ca certificate.pdf31 Jul 2017
Proforma of Allotment letterFile: OM-BHAKTI-VENTURE-RERA -Act- BUNGALOW.pdf29 Jul 2017
Details of encumbrancesFile: Encumbrance.pdf28 Jul 2017
Declaration in FORM BFile: Form B.pdf28 Jul 2017
Building plan approvalFile: Commencement Certificate.pdf27 Jul 2017
Layout approvalFile: Layout.pdf27 Jul 2017
PAN CardFile: Om Bhakti Ventures - PAN Card.pdf27 Jul 2017
Copy of the legal title reportFile: Title Clearance Report.pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: Layout.pdf27 Jul 2017
Building Plan Approval (IOD)File: Commencement Certificate.pdf27 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf27 Jul 2017

How this compares with Palghar

83%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 96 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhakti Greens on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Vasai-Virar City (M Corp)3,200+ in Palghar

2 kmBhakti GreensCompleted 1Lapsed / revoked 4Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: ombhaktiventures

ombhaktiventures has 1 registration on MahaRERA, including Bhakti Greens. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if Bhakti Greens is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhakti Greens?

The registered promoter entity is ombhaktiventures, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhakti Greens?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhakti Greens?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bhakti Greens?

The professionals named in the filing: Architect: S S Jain & Associates; Architect: Keyur Thakker & Associates; Engineer: SS & Associates; Chartered Accountant: Aniket M Padhye; Chartered Accountant: ASHWIN NAIR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bhakti Greens?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhakti Greens. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhakti Greens to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.