Home / Browse projects / Sangli, Maharashtra / BHAGYASHREE PLAZA

Registration lapsed No litigation declared Others project

BHAGYASHREE PLAZA

By M/S ANU CONSTRUCTIONS

RG-MH-22985 · RERA P53100034026 · Last updated on MahaRERA portal: 20 Jul 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Rs 1.50 crore secured on the land, in favour of Palus Sahakari Bnak Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
24 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 79 documents Report an error

BHAGYASHREE PLAZA is a Others project by M/S ANU CONSTRUCTIONS in Sangli, Maharashtra, registered with MahaRERA as P53100034026 on 17 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 29 of the 53 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameBHAGYASHREE PLAZA
  • TypeOthers
  • Location
    • Opp Court Building
    • Uran Islampur (M Cl)
    • Walwa
    • Sangli
    • 416409
  • Pincode416409
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100034026
  • ReraGenie IDRG-MH-22985

Builder

  • NameM/S ANU CONSTRUCTIONS
  • Entity typePartnership
  • PartnersSunil Bapurao Pharne, Varsha Suresh Pharne, Abhishek Suresh Pharne

Key dates

10 months past promisethis monthRegisteredMar 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Mar 2022
  • Promised completion31 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed79 files

Current status

55%29 of 53 units booked
86.9%Work done, per cost certificate

Figures as on 20 Jul 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAGYASHREE PLAZANA88282553

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BHAGYASHREE PLAZA: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 20 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed9

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots9
Closed/Covered9

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area571 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPalus Sahakari Bnak Ltd
Secured amountRs 1.50 crore
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Sanctioning authorityIslampur Municipal Council
Permissible FSI2283.08
Proposed, not sanctioned2,283 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGandhi Chowk Urun Islampur
Estimated costRs 6.51 cr
Cost incurredRs 5.66 cr
Work done86.94%
BuildingWingEstimatedIncurred
BHAGYASHREE PLAZANARs 6.08 crRs 5.66 cr
-NARs 43.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectArchland through Sambhaji Patil Patil
EngineerR K Engineers
EngineerMahesh Sampatrao More
Chartered AccountantD S Palkar and Co
PartnerRole in project
M/S ANU CONSTRUCTIONS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Jun 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Jun 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed79

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE (3).pdf20 Jul 2025
Withdrawal Update Form 2File: engineer cert.pdf20 Jul 2025
Withdrawal Update Form 3File: CA CERTIFICATE_compressed (2).pdf20 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineer certificate 001.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate March2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March2025 Engineers Certificate.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold March 2025.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture certificate December 2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate December 2024_compressed.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate December 2024.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold December 2024.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: March 2023 Form No 05 CA.pdf11 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: March 2024 Form no 05.pdf11 Nov 2024
Disclosure of sold/ booked inventoryFile: sold_unsold_rera_September_2024[1].pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc certificate.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer cert.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: inventory.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (2).pdf24 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (14).pdf5 Jun 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERTIFICATE.pdf5 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERTIFICATE.pdf5 Jun 2024
Building plan approvalFile: Revised Plan.pdf1 Jun 2024
Layout approvalFile: Amalgmation Plan.pdf1 Jun 2024
Copy of Layout Approval (in case of layout)File: Amalgmation Plan.pdf1 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Revised Plan.pdf1 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf1 Jun 2024
Declaration about Commencement CertificateFile: Format D.pdf1 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf15 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate (8).pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold unsold dec_compressed.pdf13 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory Bhagyashree plaza April 2024.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dec_compressed.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Bhagyashree plaza April 2024_compressed.pdf13 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM_compressed (1).pdf7 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (4).pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE - B.pdf29 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE (4).pdf29 Sep 2023
Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY (1).pdf29 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archiect BHAGYASHREE PLAZA DECEMBER 2022 UPDATE.pdf19 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate anu construction (1)Bhagyashree.pdf19 Jan 2023
Disclosure of sold/ booked inventoryFile: Bhagyashri plaza-booked inventory (1).pdf19 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - BHAGYASHREE 01.pdf14 Oct 2022
Disclosure of sold/ booked inventoryFile: BHAGYASHREE Sold Unsold inventary.pdf14 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: anu construction ARC certificate.pdf27 Jul 2022
Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY.pdf27 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Muncipal Transfer CC.pdf12 Mar 2022
Commencement Certificates / NA Order for plotted developmentFile: declaration fharne.pdf28 Feb 2022
Commencement Certificates / NA Order for plotted developmentFile: saledeed fharne.pdf28 Feb 2022
OtherFile: POA fharne.pdf28 Feb 2022
Copy of the legal title reportFile: PROPERTY CARD AND DECLARATION.pdf16 Feb 2022
Copy of the legal title reportFile: Legal Title Report.pdf15 Feb 2022
Copy of the legal title reportFile: BHAGYASHRI PLAZA PROPERTY CARD (2).pdf15 Feb 2022
OtherFile: Kharedipatra Final-1-35.pdf23 Dec 2021
OtherFile: Kharedipatra Final-36-80.pdf23 Dec 2021
Declaration about Commencement CertificateFile: Declaration commencement certificate.pdf13 Dec 2021
OtherFile: layout and sanctioned plans.pdf13 Dec 2021
Building plan approvalFile: Sanctioned plans.pdf6 Dec 2021
Layout approvalFile: Lay out Plan.pdf6 Dec 2021
PAN CardFile: Firm Pan card.pdf6 Dec 2021
Details of encumbrancesFile: No encumbrance Declaration.pdf6 Dec 2021
Copy of Layout Approval (in case of layout)File: Lay out Plan.pdf6 Dec 2021
Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plans.pdf6 Dec 2021
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf6 Dec 2021
Declaration in FORM BFile: Form B Declaration.pdf6 Dec 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf6 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf6 Dec 2021
CERSAI detailsFile: CERSAI_Search_Report.pdf6 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Pharne.pdf6 Dec 2021
Proforma of Allotment letterFile: Agreement to Sell.pdf6 Dec 2021
Proforma of Allotment letterFile: Allotmet letter .pdf6 Dec 2021
OtherFile: Credai Membership.pdf6 Dec 2021

How this compares with Sangli

55%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one has not
29%of Sangli registrations have lapsed or been cancelledthis one is among them

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep BHAGYASHREE PLAZA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp Court Building790+ in Sangli

2 kmBHAGYASHREE PLAZACompleted 4Lapsed / revoked 5Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 16 registered projects within 2 km.

Builder: M/S ANU CONSTRUCTIONS

M/S ANU CONSTRUCTIONS has 1 registration on MahaRERA, including BHAGYASHREE PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What does it mean that BHAGYASHREE PLAZA shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BHAGYASHREE PLAZA is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAGYASHREE PLAZA?

The registered promoter entity is M/S ANU CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAGYASHREE PLAZA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAGYASHREE PLAZA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAGYASHREE PLAZA?

The professionals named in the filing: Architect: Archland through Sambhaji Patil Patil; Engineer: R K Engineers; Engineer: Mahesh Sampatrao More; Chartered Accountant: D S Palkar and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAGYASHREE PLAZA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAGYASHREE PLAZA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAGYASHREE PLAZA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.