Home / Browse projects / Sangli, Maharashtra / BHAGYASHREE PLAZA
BHAGYASHREE PLAZA
RG-MH-22985 · RERA P53100034026 · Last updated on MahaRERA portal: 20 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Rs 1.50 crore secured on the land, in favour of Palus Sahakari Bnak Ltd
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHAGYASHREE PLAZA is a Others project by M/S ANU CONSTRUCTIONS in Sangli, Maharashtra, registered with MahaRERA as P53100034026 on 17 Mar 2022. Possession was promised by 31 Dec 2025 and is now 10 months past that date. 29 of the 53 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameBHAGYASHREE PLAZA
- TypeOthers
- Location
- Opp Court Building
- Uran Islampur (M Cl)
- Walwa
- Sangli
- 416409
- Pincode416409
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100034026
- ReraGenie IDRG-MH-22985
Builder
- NameM/S ANU CONSTRUCTIONS
- Entity typePartnership
- PartnersSunil Bapurao Pharne, Varsha Suresh Pharne, Abhishek Suresh Pharne
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on17 Mar 2022
- Promised completion31 Dec 2025
- Revised completionNone
- Buildings1 building record
- Documents filed79 files
Current status
Figures as on 20 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BHAGYASHREE PLAZA | NA | 8 | 8 | 28 | 25 | 53 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
BHAGYASHREE PLAZA: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 20 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed9
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| BHAGYASHREE PLAZA | NA | Rs 6.08 cr | Rs 5.66 cr |
| - | NA | Rs 43.00 lakh | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Archland through Sambhaji Patil Patil |
| Engineer | R K Engineers |
| Engineer | Mahesh Sampatrao More |
| Chartered Accountant | D S Palkar and Co |
| Partner | Role in project |
|---|---|
| M/S ANU CONSTRUCTIONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Feb 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed79
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE (3).pdf | 20 Jul 2025 |
| Withdrawal Update Form 2File: engineer cert.pdf | 20 Jul 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE_compressed (2).pdf | 20 Jul 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: engineer certificate 001.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate March2025.pdf | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 15 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: March2025 Engineers Certificate.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold March 2025.pdf | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture certificate December 2024.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate December 2024_compressed.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers certificate December 2024.pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold unsold December 2024.pdf | 20 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: March 2023 Form No 05 CA.pdf | 11 Nov 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: March 2024 Form no 05.pdf | 11 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: sold_unsold_rera_September_2024[1].pdf | 19 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 18 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 18 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 18 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arc certificate.pdf | 24 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer cert.pdf | 24 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: inventory.pdf | 24 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_compressed (2).pdf | 24 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (14).pdf | 5 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD INVENTORY.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERTIFICATE.pdf | 5 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FINAL CA CERTIFICATE.pdf | 5 Jun 2024 |
| Building plan approvalFile: Revised Plan.pdf | 1 Jun 2024 |
| Layout approvalFile: Amalgmation Plan.pdf | 1 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Amalgmation Plan.pdf | 1 Jun 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Revised Plan.pdf | 1 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 1 Jun 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 1 Jun 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf | 1 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A.pdf | 15 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march.pdf | 13 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate (8).pdf | 13 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold unsold dec_compressed.pdf | 13 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Bhagyashree plaza April 2024.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 dec_compressed.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Bhagyashree plaza April 2024_compressed.pdf | 13 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM_compressed (1).pdf | 7 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARC CERTIFICATE.pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE (4).pdf | 29 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ANNEXURE - B.pdf | 29 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CERTIFICATE (4).pdf | 29 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: BOOKED INVENTORY (1).pdf | 29 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archiect BHAGYASHREE PLAZA DECEMBER 2022 UPDATE.pdf | 19 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate anu construction (1)Bhagyashree.pdf | 19 Jan 2023 |
| Disclosure of sold/ booked inventoryFile: Bhagyashri plaza-booked inventory (1).pdf | 19 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect - BHAGYASHREE 01.pdf | 14 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: BHAGYASHREE Sold Unsold inventary.pdf | 14 Oct 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: anu construction ARC certificate.pdf | 27 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: BOOKING INVENTORY.pdf | 27 Jul 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: Muncipal Transfer CC.pdf | 12 Mar 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: declaration fharne.pdf | 28 Feb 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: saledeed fharne.pdf | 28 Feb 2022 |
| OtherFile: POA fharne.pdf | 28 Feb 2022 |
| Copy of the legal title reportFile: PROPERTY CARD AND DECLARATION.pdf | 16 Feb 2022 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 15 Feb 2022 |
| Copy of the legal title reportFile: BHAGYASHRI PLAZA PROPERTY CARD (2).pdf | 15 Feb 2022 |
| OtherFile: Kharedipatra Final-1-35.pdf | 23 Dec 2021 |
| OtherFile: Kharedipatra Final-36-80.pdf | 23 Dec 2021 |
| Declaration about Commencement CertificateFile: Declaration commencement certificate.pdf | 13 Dec 2021 |
| OtherFile: layout and sanctioned plans.pdf | 13 Dec 2021 |
| Building plan approvalFile: Sanctioned plans.pdf | 6 Dec 2021 |
| Layout approvalFile: Lay out Plan.pdf | 6 Dec 2021 |
| PAN CardFile: Firm Pan card.pdf | 6 Dec 2021 |
| Details of encumbrancesFile: No encumbrance Declaration.pdf | 6 Dec 2021 |
| Copy of Layout Approval (in case of layout)File: Lay out Plan.pdf | 6 Dec 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanctioned plans.pdf | 6 Dec 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 6 Dec 2021 |
| Declaration in FORM BFile: Form B Declaration.pdf | 6 Dec 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 6 Dec 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 6 Dec 2021 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 6 Dec 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Pharne.pdf | 6 Dec 2021 |
| Proforma of Allotment letterFile: Agreement to Sell.pdf | 6 Dec 2021 |
| Proforma of Allotment letterFile: Allotmet letter .pdf | 6 Dec 2021 |
| OtherFile: Credai Membership.pdf | 6 Dec 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 79 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep BHAGYASHREE PLAZA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Opp Court Building790+ in Sangli
Filed coordinates, straight-line distance. 16 registered projects within 2 km.
Sai Suman
MAK Buildcon
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
SHREE RAJLAXMI MALL
SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS
EVARA ESTATE
DSDB REALTY LLP
GOVIND ICON
G.K. ASSOCIATES
See every Sangli project, with the district possession charts
Builder: M/S ANU CONSTRUCTIONS
M/S ANU CONSTRUCTIONS has 1 registration on MahaRERA, including BHAGYASHREE PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What does it mean that BHAGYASHREE PLAZA shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BHAGYASHREE PLAZA is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHAGYASHREE PLAZA?
The registered promoter entity is M/S ANU CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHAGYASHREE PLAZA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BHAGYASHREE PLAZA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHAGYASHREE PLAZA?
The professionals named in the filing: Architect: Archland through Sambhaji Patil Patil; Engineer: R K Engineers; Engineer: Mahesh Sampatrao More; Chartered Accountant: D S Palkar and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHAGYASHREE PLAZA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.