Home / Browse projects / Sangli, Maharashtra / SHREE RAJLAXMI MALL

Registered No litigation declared Commercial project

SHREE RAJLAXMI MALL

By SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS

RG-MH-16267 · RERA P53100025856 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 38 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedmoved 38 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 70%
165 of 211Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 207 documents Report an error

SHREE RAJLAXMI MALL is a Commercial project by SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS in Sangli, Maharashtra, registered with MahaRERA as P53100025856 on 21 Jul 2020. Possession is promised by 30 Sep 2027. The completion date has moved by 38 months from the original filing. 46 of the 211 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameSHREE RAJLAXMI MALL
  • TypeCommercial
  • Location
    • Sangli miraj Road
    • SANGLI
    • Vijay Nagar
    • Miraj
    • 415414
  • Pincode415414
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53100025856
  • ReraGenie IDRG-MH-16267

Builder

  • NameSHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS
  • Entity typePartnership
  • PartnersNEWANDRAM MORANDMAL BUDHWANI, PRASHANT VISHWANATH KAMBLE, MOHAN NEWANDRAM BUDHWANI, SACHIN NEWANDRAM BUDHWANI

Key dates

this monthRegisteredJul 2020First promiseJul 2024Revised toSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on21 Jul 2020
  • Promised completion30 Sep 2027
  • Revised completionRevised to 30 Sep 2027 (originally 30 Jul 2024)
  • Buildings1 building record
  • Documents filed207 files

Current status

22%46 of 211 units booked
46.6%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHREE RAJLAXMI MALLNA990211211

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

SHREE RAJLAXMI MALL: 54% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes60%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes20%
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Open Space37

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,533 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on29 Jun 2026
LandownerVillageDistrict
SHANKAR NEWANDRAM BUDHWANIVita (M Cl)Sangli

Approvals and building plan

Sanctioning authoritySangli Kupwad Miraj Municipal Corporation
Permissible FSI3840.65
Proposed, not sanctioned3,841 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKARAD ROAD VITA
Estimated costRs 23.65 cr
Cost incurredRs 11.02 cr
Work done46.6%
BuildingWingEstimatedIncurred
SHREE RAJLAXMI MALLNARs 18.92 crRs 11.02 cr
-NARs 4.73 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMd Abu Bakar
EngineerKiran Shravane
EngineerRahul Patil
Chartered Accountantsanjay krishnaji soman
Chartered AccountantC S UDHANI & COMPANY
PartnerRole in project
SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT53100019176Jul 2024 → Mar 2026

Reason as filed by the promoterRespected Sir/Madam, In the said project, We Shree Rajlaxmi Constructions and Builder purchased the adjacent land/Plot at north side of said project on 23/09/2022. Then we had completed the procedure of amalgamation of adjacent plot and said project plot from Sangli Miraj Kupwad Municipal Corporation on 01/09/2022. After amalgamation both lands/Plot are considered as one plot. Then We had taken revised building permission for newly amalgamation plot with additional built-up area on 02/03/2023. Hence as construction work and activities are increased, we required an additional time to complete s

EA18032620261Jul 2024 → Sep 2027

Reason as filed by the promoterRespected Sir/Mam, In the said project, Pursuant to the revised permissions granted by the competent authority, the scope of construction of the project has increased substantially. The addition of slabs, internal walls, and extended finishing works has resulted in an increase in the overall quantum of work. Fortunately, almost all of the RCC work, brickwork, and plasterwork has been completed. Further, as the project is a large-scale commercial development, discussions and coordination with multiple brands for internal shop fit-outs are currently in progress. The said process involves detaile

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Jun 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed207

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 207 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Building plan approvalFile: Rajlaxmi Blueprint 1 Renewed 2027 Com.pdf20 Jul 2026
Building plan approvalFile: Rajlaxmi Blueprint 2 Renewed 2027 Com.pdf20 Jul 2026
Commencement certificateFile: Rajlaxmi Building Permission Renewal 2027.pdf20 Jul 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert June 26.pdf20 Jul 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert June 26.pdf20 Jul 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert June 26 Min.pdf20 Jul 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf17 Jun 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf17 Jun 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf17 Jun 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf17 Jun 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf17 Jun 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf17 Jun 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf10 Jun 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf10 Jun 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf10 Jun 2026
Form 2A (FY 2020-2021)File: Rajlaxmi March 21 Form 2A Eng Quality Assurance.pdf28 Mar 2026
Form 2A (FY 2021-2022)File: Rajlaxmi March 22 Form 2A Eng Quality Assurance.pdf28 Mar 2026
Form 2A (FY 2022-2023)File: Rajlaxmi March 23 Form 2A Eng Quality Assurance.pdf28 Mar 2026
Form 2A (FY 2023-2024)File: Rajlaxmi March 24 Form 2A Eng Quality Assurance.pdf28 Mar 2026
Form 2A (FY 2024-2025)File: Rajlaxmi March 25 Form 2A Eng Quality Assurance.pdf28 Mar 2026
Form 1File: Rajlaxmi Form 1 Arch Cert March 2025.pdf10 Mar 2026
Form 2File: Rajlaxmi Form 2 Eng Cert March 2025.pdf10 Mar 2026
Form 3File: Rajlaxmi Form 3 CA Cert March 2025.pdf10 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2025.pdf10 Mar 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Certificate Dec 23.pdf9 Mar 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert June 2025.pdf9 Mar 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert Sept 25 Min.pdf9 Mar 2026
Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert Dec 25 Min.pdf9 Mar 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert June 2025.pdf9 Mar 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert June 2025.pdf9 Mar 2026
Withdrawal Update Form 2File: Rajlaxmi Form 1 Architect Cert Sept 25 Min.pdf9 Mar 2026
Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert Dec 25 Min.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3 June 2025.pdf9 Mar 2026
Withdrawal Update Form 3File: Form 3 June 2025.pdf9 Mar 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert Sept 25 Min.pdf9 Mar 2026
Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert Dec 25 Min.pdf9 Mar 2026
Form 1File: Rajlaxmi Form 1 Architect Cert Sept 2024.pdf7 Mar 2026
Form 2File: Rajlaxmi Form 2 Engineer Cert Sept 2024.pdf7 Mar 2026
Form 3File: Rajlaxmi Form 3 CA Cert Sept 2024 Min.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2024.pdf7 Mar 2026
Form 1File: Rajlaxmi Form 1 Architect Cert June 2024.pdf7 Mar 2026
Form 2File: Rajlaxmi Form 2 Engineer Cert June 2024 Min.pdf7 Mar 2026
Form 3File: Rajlaxmi Form 3 CA Cert June 2024 Min.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2024.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2024.pdf7 Mar 2026
Form 1File: Rajlaxmi Form 1 Architect Certificate March 2024.pdf7 Mar 2026
Form 2File: Rajlaxmi Form 2 Engineer Certificate March 2024.pdf7 Mar 2026
Form 3File: Rajlaxmi Form 3 CA Certificate March 2024 - converted (1).pdf7 Mar 2026
Form 1File: Rajlaxmi Arch Dec 23.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng Dec 23.pdf7 Mar 2026
Form 3File: Rajlaxmi CA Dec 23.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Dec 2023.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2023.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch Sep 23.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng Sept 23.pdf7 Mar 2026
Form 3File: Rajlaxmi CA Sept 23.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch June 23.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng June 23.pdf7 Mar 2026
Form 3File: Rajlaxmi CA June 23.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2023.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2023.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch March 23.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng March 23.pdf7 Mar 2026
Form 3File: Rajlaxmi CA March 23.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch Dec 22.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng Dec 22.pdf7 Mar 2026
Form 3File: Rajlaxmi CA Dec 22.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Dec 2022.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2022.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch Sept 22.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng Sept 22.pdf7 Mar 2026
Form 3File: Rajlaxmi CA Sept 22.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2022.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch June 22.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng June 22 .pdf7 Mar 2026
Form 3File: Rajlaxmi CA June 22.pdf7 Mar 2026
Form 1File: Rajlaxmi Arch March 22.pdf7 Mar 2026
Form 2File: Rajlaxmi Eng March 22.pdf7 Mar 2026
Form 3File: Rajlaxmi CA March 22.pdf7 Mar 2026
Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2022.pdf7 Mar 2026

How this compares with Sangli

22%of this project is bookeddistrict median 16%
11%of Sangli projects moved their completion datethis one moved by 38 months
29%of Sangli registrations have lapsed or been cancelledthis one is on the register

Computed across the 790+ Sangli projects on ReraGenie, from their own filings.

Keep SHREE RAJLAXMI MALL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANGLI790+ in Sangli

2 kmSHREE RAJLAXMI MALLCompleted 29Lapsed / revoked 11Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 57 registered projects within 2 km.

Builder: SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS

SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS has 1 registration on MahaRERA, including SHREE RAJLAXMI MALL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.

Frequently asked questions

What are my rights if SHREE RAJLAXMI MALL is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SHREE RAJLAXMI MALL?

The registered promoter entity is SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SHREE RAJLAXMI MALL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SHREE RAJLAXMI MALL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SHREE RAJLAXMI MALL?

The professionals named in the filing: Architect: Md Abu Bakar; Engineer: Kiran Shravane; Engineer: Rahul Patil; Chartered Accountant: sanjay krishnaji soman; Chartered Accountant: C S UDHANI & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SHREE RAJLAXMI MALL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SHREE RAJLAXMI MALL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SHREE RAJLAXMI MALL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.