Home / Browse projects / Sangli, Maharashtra / SHREE RAJLAXMI MALL
SHREE RAJLAXMI MALL
By SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS
RG-MH-16267 · RERA P53100025856 · Last updated on MahaRERA portal: 20 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 38 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Sangli registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
SHREE RAJLAXMI MALL is a Commercial project by SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS in Sangli, Maharashtra, registered with MahaRERA as P53100025856 on 21 Jul 2020. Possession is promised by 30 Sep 2027. The completion date has moved by 38 months from the original filing. 46 of the 211 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NameSHREE RAJLAXMI MALL
- TypeCommercial
- Location
- Sangli miraj Road
- SANGLI
- Vijay Nagar
- Miraj
- 415414
- Pincode415414
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53100025856
- ReraGenie IDRG-MH-16267
Builder
- NameSHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS
- Entity typePartnership
- PartnersNEWANDRAM MORANDMAL BUDHWANI, PRASHANT VISHWANATH KAMBLE, MOHAN NEWANDRAM BUDHWANI, SACHIN NEWANDRAM BUDHWANI
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Jul 2020
- Promised completion30 Sep 2027
- Revised completionRevised to 30 Sep 2027 (originally 30 Jul 2024)
- Buildings1 building record
- Documents filed207 files
Current status
Figures as on 20 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHREE RAJLAXMI MALL | NA | 9 | 9 | 0 | 211 | 211 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.
SHREE RAJLAXMI MALL: 54% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 70% |
| Sanitary Fittings within the flats / premises | 25% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 15% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 15% |
Progress on shared amenities15
As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 70% |
| Storm Water Drains | Yes | 60% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 20% |
| Water conservation /Rain water harvesting | Yes | 40% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed37
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| SHANKAR NEWANDRAM BUDHWANI | Vita (M Cl) | Sangli |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| SHREE RAJLAXMI MALL | NA | Rs 18.92 cr | Rs 11.02 cr |
| - | NA | Rs 4.73 cr | - |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Md Abu Bakar |
| Engineer | Kiran Shravane |
| Engineer | Rahul Patil |
| Chartered Accountant | sanjay krishnaji soman |
| Chartered Accountant | C S UDHANI & COMPANY |
| Partner | Role in project |
|---|---|
| SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterRespected Sir/Madam, In the said project, We Shree Rajlaxmi Constructions and Builder purchased the adjacent land/Plot at north side of said project on 23/09/2022. Then we had completed the procedure of amalgamation of adjacent plot and said project plot from Sangli Miraj Kupwad Municipal Corporation on 01/09/2022. After amalgamation both lands/Plot are considered as one plot. Then We had taken revised building permission for newly amalgamation plot with additional built-up area on 02/03/2023. Hence as construction work and activities are increased, we required an additional time to complete s
Reason as filed by the promoterRespected Sir/Mam, In the said project, Pursuant to the revised permissions granted by the competent authority, the scope of construction of the project has increased substantially. The addition of slabs, internal walls, and extended finishing works has resulted in an increase in the overall quantum of work. Fortunately, almost all of the RCC work, brickwork, and plasterwork has been completed. Further, as the project is a large-scale commercial development, discussions and coordination with multiple brands for internal shop fit-outs are currently in progress. The said process involves detaile
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Jun 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Feb 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jul 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2026Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Sep 2027
Documents filed207
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 207 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Building plan approvalFile: Rajlaxmi Blueprint 1 Renewed 2027 Com.pdf | 20 Jul 2026 |
| Building plan approvalFile: Rajlaxmi Blueprint 2 Renewed 2027 Com.pdf | 20 Jul 2026 |
| Commencement certificateFile: Rajlaxmi Building Permission Renewal 2027.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert June 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert June 26.pdf | 20 Jul 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert June 26 Min.pdf | 20 Jul 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf | 17 Jun 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf | 17 Jun 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf | 17 Jun 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert March 26.pdf | 10 Jun 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Engineer Cert March 26.pdf | 10 Jun 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert March 26 Min.pdf | 10 Jun 2026 |
| Form 2A (FY 2020-2021)File: Rajlaxmi March 21 Form 2A Eng Quality Assurance.pdf | 28 Mar 2026 |
| Form 2A (FY 2021-2022)File: Rajlaxmi March 22 Form 2A Eng Quality Assurance.pdf | 28 Mar 2026 |
| Form 2A (FY 2022-2023)File: Rajlaxmi March 23 Form 2A Eng Quality Assurance.pdf | 28 Mar 2026 |
| Form 2A (FY 2023-2024)File: Rajlaxmi March 24 Form 2A Eng Quality Assurance.pdf | 28 Mar 2026 |
| Form 2A (FY 2024-2025)File: Rajlaxmi March 25 Form 2A Eng Quality Assurance.pdf | 28 Mar 2026 |
| Form 1File: Rajlaxmi Form 1 Arch Cert March 2025.pdf | 10 Mar 2026 |
| Form 2File: Rajlaxmi Form 2 Eng Cert March 2025.pdf | 10 Mar 2026 |
| Form 3File: Rajlaxmi Form 3 CA Cert March 2025.pdf | 10 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2025.pdf | 10 Mar 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Certificate Dec 23.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert June 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert Sept 25 Min.pdf | 9 Mar 2026 |
| Withdrawal Update Form 1File: Rajlaxmi Form 1 Architect Cert Dec 25 Min.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert June 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert June 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 1 Architect Cert Sept 25 Min.pdf | 9 Mar 2026 |
| Withdrawal Update Form 2File: Rajlaxmi Form 2 Eng Cert Dec 25 Min.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 June 2025.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert Sept 25 Min.pdf | 9 Mar 2026 |
| Withdrawal Update Form 3File: Rajlaxmi Form 3 CA Cert Dec 25 Min.pdf | 9 Mar 2026 |
| Form 1File: Rajlaxmi Form 1 Architect Cert Sept 2024.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Form 2 Engineer Cert Sept 2024.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi Form 3 CA Cert Sept 2024 Min.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2024.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Form 1 Architect Cert June 2024.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Form 2 Engineer Cert June 2024 Min.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi Form 3 CA Cert June 2024 Min.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2024.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2024.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Form 1 Architect Certificate March 2024.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Form 2 Engineer Certificate March 2024.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi Form 3 CA Certificate March 2024 - converted (1).pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch Dec 23.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng Dec 23.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA Dec 23.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Dec 2023.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2023.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch Sep 23.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng Sept 23.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA Sept 23.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch June 23.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng June 23.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA June 23.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2023.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2023.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch March 23.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng March 23.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA March 23.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch Dec 22.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng Dec 22.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA Dec 22.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Dec 2022.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Sep 2022.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch Sept 22.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng Sept 22.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA Sept 22.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Jun 2022.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch June 22.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng June 22 .pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA June 22.pdf | 7 Mar 2026 |
| Form 1File: Rajlaxmi Arch March 22.pdf | 7 Mar 2026 |
| Form 2File: Rajlaxmi Eng March 22.pdf | 7 Mar 2026 |
| Form 3File: Rajlaxmi CA March 22.pdf | 7 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: Rajlaxmi Sold Unsold Inventory Mar 2022.pdf | 7 Mar 2026 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Sangli
Computed across the 790+ Sangli projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 207 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep SHREE RAJLAXMI MALL on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANGLI790+ in Sangli
Filed coordinates, straight-line distance. 57 registered projects within 2 km.
Sai Vishwa Residency
Vinayak Jaykar Patil
SIDDHI VASTU Puram
SIDDHIVINAYAK PLATINUM
SEVEN HILLS
SHRI HARIPRIYA BUILDERS AND DEVELOPERS LLP
EVARA ESTATE
DSDB REALTY LLP
GOVIND ICON
G.K. ASSOCIATES
Fortune Business Hub
Fortune Enterprises
See every Sangli project, with the district possession charts
Builder: SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS
SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS has 1 registration on MahaRERA, including SHREE RAJLAXMI MALL. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sangli district page.
Frequently asked questions
What are my rights if SHREE RAJLAXMI MALL is delayed beyond 30 Sep 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of SHREE RAJLAXMI MALL?
The registered promoter entity is SHREE RAJLAXMI CONSTRUCTIONS AND BUILDERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in SHREE RAJLAXMI MALL?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for SHREE RAJLAXMI MALL?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at SHREE RAJLAXMI MALL?
The professionals named in the filing: Architect: Md Abu Bakar; Engineer: Kiran Shravane; Engineer: Rahul Patil; Chartered Accountant: sanjay krishnaji soman; Chartered Accountant: C S UDHANI & COMPANY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in SHREE RAJLAXMI MALL?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback