Completed No litigation declared Others project

BHAGWATI GREENS 3

By BHAGWATI DEVELOPERS

RG-MH-09608 · RERA P52000003952 · Last updated on MahaRERA portal: 8 May 2025

Source: official MahaRERA filing

Red flags

  • 44 complaints at MahaRERA
  • Completion date moved by 18 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
44Complaints at MahaRERAon this registration
Jump to the 121 documents Report an error

BHAGWATI GREENS 3 is a Others project by BHAGWATI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000003952 on 7 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2024. The completion date has moved by 18 months from the original filing. 44 complaints are on record with the regulator.

At a glance

Project

  • NameBHAGWATI GREENS 3
  • TypeOthers
  • Location
    • BEHIND ISCON TEMPLE
    • NAVI MUMBAI
    • Kharghar
    • Panvel
    • Raigarh
    • 410210
  • Pincode410210
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000003952
  • ReraGenie IDRG-MH-09608

Builder

  • NameBHAGWATI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AALFB5272C1ZK
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersMANJI KARMAN PATEL, JIGNA BHOGILAL VORA, BHOGILAL MAVJI VORA
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJun 2023Revised toDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on7 Aug 2017
  • Promised completion31 Dec 2024
  • Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2023)
  • Buildings4 building records
  • Documents filed121 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
SHOPPINGNA50000
WING ANA300000
WING BNA300000
WING CNA260000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 8 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

SHOPPING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING C100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes75%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed182

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots182
Closed/Covered182
BuildingClosed/CoveredTotal
SHOPPING2424
WING A4444
WING B7070
WING C4444

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,401 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityCITY INDUSTRIAL DEVELOPMENT CORPORATION OF MAHARASHTRA
Permissible FSI40326.67
Proposed, not sanctioned14,033 sq m
Buildings approved5
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLBS MARG , GHATKOPAR

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSOYUZ TALIB ARCHITECTS PVT LTD
ArchitectSTAPL ARCHITECTS PVT LTD
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
EngineerSTRUCTURAL CONCEPT PVT LTD
Chartered AccountantH M SHAH AND ASSACIATES
Chartered AccountantH M SHAH AND ASSOCIATES
PartnerRole in project
BHAGWATI DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017102Jun 2023 → Mar 2024

Reason as filed by the promoterWe have completed 100% work of the building project and had applied for Occupancy Certificate which got rejected on account of some minor technical issue which we have taken up and clarified with CIDCO and are hopeful of getting the Occupancy Certificate at the earliest. We therefore request you to grant us extension of the project for a period upto 31/03/2024.

EXT52000019731Jun 2023 → Dec 2024

Reason as filed by the promoterWe have completed 100% work of the building project and had obtained full occupancy certificate for C Wing and Part Occupancy certificate for A & B Wing. The full Occupancy Certificate for A & B Wing was not granted by CIDCO Ltd. on account of the technical issues such as rescue area which was approved by CIDCO. We have already made the amendments in the plans and we are in the process of making application for occupancy certificate for the remaining portion of A & B Wing.

Complaints filed with MahaRERA44

Case no.ComplainantRespondentFiled
CC006000000221123Bhagwati Greens Phase3 Allottees AOPM/s Bhagwati Developers11/05/2022
CC006000000251755Mr. Amandeep Singh Sandhu Mrs. Kulwinder Kaur Sandhu & Miss Manjit Kaur B SandhuM/s. Bhagwati Developers06/07/2022
CC006000000251764Mr. Ashish Krishnachandra Mane and Mrs. Usha Ashish ManeM/s. Bhagwati Developers06/07/2022
CC006000000251765Mr. Vikram Singh Sahrawat and Mrs. Shally RathiM/s. Bhagwati Developers07/07/2022
CC006000000251769Mrs. Deepanwita Ghosh and Mr. Diganto GhoshM/s. Bhagwati Developers07/07/2022
CC006000000251773Mr. Sukanta Biswas and Mrs. Sunanda BiswasM/s. Bhagwati Developers07/07/2022
CC006000000251788-M/s. Bhagwati Developers08/07/2022
CC006000000251806Mr. Muddu Satya ShriniwasM/s. Bhagwati Developers11/07/2022
CC006000000251807Mr. L.V. Prasad and Mrs. Bala PrasadM/s. Bhagwati Developers11/07/2022
CC006000000251850Mr. L.V. Prasad and Mrs. Bala PrasadM/s. Bhagwati Developers11/07/2022
CC006000000251810Mr. Ganesh Vithalrao Londhe and Mrs. Pratibha Ganesh LondheM/s. Bhagwati Developers13/07/2022
CC006000000251833Mrs. Suchita Shivaji Chaudhary and Mr. Shivaji Bhimaji ChaudharyM/s. Bhagwati Developers11/07/2022
CC006000000251835-M/s. Bhagwati Developers11/07/2022
CC006000000251851Mrs Sindu Sudhir KumarM/s Bhagwati Developers11/07/2022
CC006000000251853Mr. Ketan Gaikwad and Mrs. Kanchan Kaur HiraM/s. Bhagwati Developers11/07/2022
CC006000000251857Mr Ram Kumar Chauhan and Mrs. Neelam Singh ChauhanM/s Bhagwati Developers11/07/2022
CC006000000251859Mr Subhojit Chatterjee and Mrs Priti ChatterjeeM/s Bhagwati Developers11/07/2022
CC006000000251861Mr. Aman Dubey and Ms. Sneha JagtapM/s Bhagwati Developers12/07/2022
CC006000000251880Miss Ruchika Goel and Mrs Juhi GuptaM/s Bhagwati Developers12/07/2022
CC006000000251879Mrs. Geeta Pant And Mr. Bhagwati Prasad PantM/s. Bhagwati Developers21/07/2022
CC006000000251881Mr. Rajpal Singh, Mr. Saurabh Singh and Mr. Vikas SinghM/s Bhagwati Developers12/07/2022
CC006000000251882Mrs. Kavita Jaikrishna Panda And Mr. Jaikrishna Anand PandaM/s. Bhagwati Developers13/07/2022
CC006000000251886Mr. Sunil KaulM/s Bhagwati Developers28/07/2022
CC006000000251903Mr. Chintan Parmar and Mrs. Hansa ParmarM/s. Bhagwati Developers15/07/2022
CC006000000251908Mr. Kiran Balkrishna Joshi and Mrs. Archana Kiran JoshiM/s. Bhagwati Developers15/07/2022
CC006000000251909Mr. Manohar Arjunji Kawadkar and Mr. Vasista Manohar KawadkarM/s. Bhagwati Developers14/07/2022
CC006000000251916Mrs. Payal Keyur Bhayani and Mr. Keyur Kirit BhayaniM/s. Bhagwati Developers21/07/2022
CC006000000251918Mr. Inderjit Singh BasraM/s. Bhagwati Developers14/07/2022
CC006000000251920Mrs. Hemprabha Jainendra Dwivedi and Mr. Jainendra Harishchandra DwivediM/s. Bhagwati Developers14/07/2022
CC006000000251927Mr. Rakendra Rajendra Curpad and Smt. Sujatha RaoM/s. Bhagwati Developers14/07/2022
CC006000000261928Mr. Chandramani Bhimrao Baladkar Mrs. Samidha Chandramani Baladkar Mr. Amit Chandramani BaladkarM/s. Bhagwati Developers15/07/2022
CC006000000261932Mr. Varun Kadian and Mrs. Sunina KadianM/s. Bhagwati Developers21/07/2022
CC006000000261931Mrs. Sumitra Kumari and Mr. Ashok KumarM/s. Bhagwati Developers15/07/2022
CC006000000261958Mr. Shailendra Singh and Mrs. Payal SinghM/s. Bhagwati Developers08/08/2022
CC006000000262021Mr. Sachin Chaudhari and Mrs. Prachi RaneM/s. Bhagwati Developers28/07/2022
CC006000000262019Mr. Jaideep Baliram Kadam and Mrs. Jagruti Jaideep KadamM/s. Bhagwati Developers28/07/2022
CC006000000262036Mr. Atul Kantilal Patil, Mrs. Vibhavari Patil and Mr. Vinayak Narayan PatilM/s. Bhagwati Developers28/07/2022
CC006000000282157Mr. Amrish Pramod SinghM/s Bhagwati Developers02/08/2022
CC006000000292356Dr. Anupriya Premraj Mohokar and Mr. Vinay Vyankatrao BhongadeM/s. Bhagwati Developers18/08/2022
CC006000000292361Mr. Dhiraj Ashok Wable and Mrs. Anita Dhiraj WableM/s. Bhagwati Developers24/08/2022
CC006000000303161Mr. Krishan Kumpawat Mr. Madansingh Kumpawat Mr. Balveer Kumpawat and Mrs. Premkunwar KumpawatM/s. Bhagwati Developers28/10/2022
CC006000000344199MR. AKSHAT SHETTY MRS. TARA SHETTY MRS. AKANKSHA AGARWALM/S BHAGWATI DEVELOPERS06/02/2023
CC006000000364681Mr. Bhavendra Lal Sharma and Mrs. Jyotsna BhattM/S BHAGWATI DEVELOPERS16/03/2023
CC006000000251756Mrs. Smita Sandeep DhaddhaM/s. Bhagwati Developers06/07/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 May 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 Jan 2025

Documents filed121

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 121 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form-3 Plot-03-sep24_compressed.pdf8 May 2025
Certificates of CA (Form 3)File: Form-3 Plot-03-Dec24_compressed.pdf8 May 2025
Building plan approvalFile: REFUGE CC DRAWING_compressed.pdf7 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 SEP - 24.pdf7 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form -1 DEC -24.pdf7 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 SEP -24.pdf7 May 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DEC - 24.pdf7 May 2025
Commencement Certificates / NA Order for plotted developmentFile: REFUGE CC.pdf7 May 2025
Building Plan Approval (IOD)File: REFUGE CC DRAWING_compressed.pdf7 May 2025
Architect’s Certificate on Completion of Project (Form 4)File: BG3.pdf29 Jan 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GREENS 3 OC2.pdf22 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bhagwati Developer Form -5 FY 23-24 for Plot-03.pdf24 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BG 3.pdf18 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BG3 ENGINEER CERTIFCATE.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PLOT NO 03 K FORM 3_compressed.pdf18 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 - 22-23- plot-03.pdf17 Nov 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Greens 3 OC.pdf16 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 - BHAGWATI GREENS - III - 21-22.pdf8 Aug 2023
Declaration in FORM BFile: FORM B - BHAGWATI GREENS III.pdf29 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - BHAGWATI GREENS - III - 30-06-2023.pdf29 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - BHAGWATI GREENS III.pdf29 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - BHAGWATI GREENS - III - MARCH 2022.pdf29 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - BHAGWATI GREENS - III - MARCH 2023.pdf29 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - BHAGWATI GREENS - III.pdf29 Jul 2023
Certificates of CA (Form 3)File: FORM-3 - BHAGWATI GREENS - III.pdf29 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 BG3.pdf8 Mar 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE BHAGWATI GREENS III.pdf8 Mar 2023
Disclosure of sold/ booked inventoryFile: GREENS III LIST.pdf8 Mar 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assuarance1 (1).pdf4 Jun 2022
Disclosure of sold/ booked inventoryFile: Inventory List_compressed.pdf4 Jun 2022
Certificates of CA (Form 3)File: Form-3 (1)_compressed.pdf4 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: form -5 plot-03 fy 20-21.pdf4 Jun 2022
Declaration about Commencement CertificateFile: CC DECLARATION.pdf3 Jun 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CETIFICATE_.pdf3 Jun 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE_.pdf3 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: green 3 form 5 bhagwati developers.pdf3 Jun 2022
OtherFile: BROCHURE.pdf3 Jun 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance.pdf2 Jun 2022
CERSAI detailsFile: CERSAI_Search_Report_200238626721_For_Asset_Based_Search_01_06_2022_12_37_11_166.pdf2 Jun 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5- plot 03 G3.pdf31 Oct 2019
Building plan approvalFile: page-1.pdf5 Feb 2019
Building plan approvalFile: page-2.pdf5 Feb 2019
Building plan approvalFile: page-2.pdf5 Feb 2019
Building plan approvalFile: page-3.pdf5 Feb 2019
Building plan approvalFile: page-1.pdf5 Feb 2019
Building plan approvalFile: page-5.pdf5 Feb 2019
Building plan approvalFile: page-6.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-1.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-2.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-2.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-3.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-1.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-5.pdf5 Feb 2019
Building Plan Approval (IOD)File: page-6.pdf5 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Letter-compressed-ilovepdf-compressed-20190205191823.pdf5 Feb 2019
Commencement Certificates / NA Order for plotted developmentFile: CC Letter-compressed-ilovepdf-compressed-20190205191823.pdf5 Feb 2019
Certificates of CA (Form 5)File: BD- GREENS III.PDF22 Nov 2018
Proforma of Allotment letterFile: GREENS 3 FINAL.pdf10 Oct 2017
Proforma of Allotment letterFile: ALLOTMENT GR 3.pdf10 Oct 2017
Building plan approvalFile: 10.pdf30 Jul 2017
Building plan approvalFile: 4.pdf30 Jul 2017
Building plan approvalFile: 5.pdf30 Jul 2017
Building plan approvalFile: 6.pdf30 Jul 2017
Building plan approvalFile: 7.pdf30 Jul 2017
Building plan approvalFile: 8.pdf30 Jul 2017
Building plan approvalFile: 9.pdf30 Jul 2017
Building plan approvalFile: 1.pdf30 Jul 2017
Building plan approvalFile: 2.pdf30 Jul 2017
Building plan approvalFile: 3.pdf30 Jul 2017
Layout approvalFile: 1.pdf30 Jul 2017
Building plan approvalFile: 11.pdf30 Jul 2017
PAN CardFile: bhag dev pan.pdf30 Jul 2017
Copy of the legal title reportFile: 001.pdf30 Jul 2017
Copy of the legal title reportFile: 002.pdf30 Jul 2017
Copy of the legal title reportFile: 003.pdf30 Jul 2017
Details of encumbrancesFile: DECLERATION.pdf30 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: 1.pdf30 Jul 2017
Building Plan Approval (IOD)File: 2.pdf30 Jul 2017
Building Plan Approval (IOD)File: 3.pdf30 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 18 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAGWATI GREENS 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAVI MUMBAI5,900+ in Raigarh

2 kmBHAGWATI GREENS 3Completed 28Lapsed / revoked 9Other 43Dot size: filed unitsN

Filed coordinates, straight-line distance. 80 registered projects within 2 km.

Builder: BHAGWATI DEVELOPERS

BHAGWATI DEVELOPERS has 10 registrations on MahaRERA, including BHAGWATI ELEGANZA and BHAGWATI IMPERIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if BHAGWATI GREENS 3 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAGWATI GREENS 3?

The registered promoter entity is BHAGWATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AALFB5272C1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAGWATI GREENS 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BHAGWATI GREENS 3?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BHAGWATI GREENS 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAGWATI GREENS 3?

The professionals named in the filing: Architect: SOYUZ TALIB ARCHITECTS PVT LTD; Architect: STAPL ARCHITECTS PVT LTD; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Engineer: STRUCTURAL CONCEPT PVT LTD; Chartered Accountant: H M SHAH AND ASSACIATES; Chartered Accountant: H M SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAGWATI GREENS 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAGWATI GREENS 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAGWATI GREENS 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.