Home / Browse projects / Raigarh, Maharashtra / BHAGWATI GREENS 2
BHAGWATI GREENS 2
RG-MH-09589 · RERA P52000006596 · Last updated on MahaRERA portal: 15 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 22 months past the filed date
- 31 complaints at MahaRERA
- Completion date moved by 18 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BHAGWATI GREENS 2 is a Others project by BHAGWATI DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000006596 on 14 Aug 2017. Possession was promised by 31 Dec 2024 and is now 22 months past that date. The completion date has moved by 18 months from the original filing. 207 of the 214 units on this registration are recorded sold or booked, and 40 of 44 construction stages are filed complete. 31 complaints are on record with the regulator.
At a glance
Project
- NameBHAGWATI GREENS 2
- TypeOthers
- Location
- Kharghar
- Panvel
- Raigarh
- 410210
- Pincode410210
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000006596
- ReraGenie IDRG-MH-09589
Builder
- NameBHAGWATI DEVELOPERS
- Entity typePartnership
- GSTIN27AALFB5272C1ZK
- GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
- PartnersMANJI KARMAN PATEL, JIGNA BHOGILAL VORA, BHOGILAL MAVJI VORA
- Other registrations9 more →
- Completed8 of 10
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on14 Aug 2017
- Promised completion31 Dec 2024
- Revised completionRevised to 31 Dec 2024 (originally 30 Jun 2023)
- Buildings4 building records
- Documents filed115 files
Current status
Figures as on 15 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| SHOPPING | NA | 3 | 0 | 0 | 14 | 14 |
| WING A | NA | 30 | 0 | 75 | 0 | 75 |
| WING B | NA | 30 | 28 | 75 | 0 | 75 |
| WING C | NA | 30 | 28 | 50 | 0 | 50 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 15 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.
SHOPPING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 91% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B99%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 15 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | Yes | 100% |
Parking filed200
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| SHOPPING | 14 | 14 |
| WING A | 66 | 66 |
| WING B | 70 | 70 |
| WING C | 50 | 50 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | DIMENSIONS ARCHITECTS PVT LTD |
| Architect | DIMENSIONS ARCHITECT PVT LTD |
| Engineer | STRUCTURAL CONCEPT DESIGNS PVT LTD |
| Engineer | STRUCTURAL CONCEPT PVT LTD |
| Chartered Accountant | H M SHAH AND ASSACIATES |
| Chartered Accountant | H M SHAH AND ASSOCIATES |
| Chartered Accountant | Ketan Rupani & Co. |
| Partner | Role in project |
|---|---|
| BHAGWATI DEVELOPERS | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe have completed 100% work of the building project and had applied for Occupancy Certificate which got rejected on account of some minor technical issue which we have taken up and clarified with CIDCO and are hopeful of getting the Occupancy Certificate at the earliest. We therefore request you to grant us extension of the project for a period upto 31/03/2024.
Reason as filed by the promoterWe have completed 100% work of the building project and had obtained full occupancy certificate for C Wing and Part Occupancy certificate for A & B Wing. The full Occupancy Certificate for A & B Wing was not granted by CIDCO Ltd. on account of the technical issues such as rescue area which was approved by CIDCO. We have already made the amendments in the plans and we are in the process of making application for occupancy certificate for the remaining portion of A & B Wing.
Complaints filed with MahaRERA31
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000344222 | Bhagwati Greens Phase 2 Allottees AOP | Bhagwati Developers | 06/02/2023 |
| CC006000000364571 | Deepali Dixit | M/s. Bhagwati Developers | 01/03/2023 |
| CC006000000374907 | MR NINAD GUJARATHI AND MRS SAYALI GUJARATHI | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374908 | MR NINAD GUJARATHI AND MRS SAYALI GUJARATHI | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374904 | MR MUNGATH ASOKKUMAR AND MRS SALINI ASOKKUMAR | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374912 | MR PRATIK LAXMIKANT GAONKAR AND MRS POOJA PRATIK GAONKAR | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374923 | MS MIDHU RAGHUNATHAN | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374921 | MR MANGAL TIWARI AND MRS PANCHALIKA | M/S BHAGWATI DEVELOPERS | 28/03/2023 |
| CC006000000374941 | MR PRANAV BRAHMBHATT AND MRS ANURAGI BRAHMBHATT | M/S BHAGWATI DEVELOPERS | 29/03/2023 |
| CC006000000374971 | MR RAMESH NARAYANAN UNNI AND MRS REKHA RAMESH | M/S BHAGWATI DEVELOPERS | 29/03/2023 |
| CC006000000374992 | MR. RAJKUMAR (AKA) RAHUL SHANKARLAL NECHLANI AND MRS RITU KHARE | M/S BHAGWATI DEVELOPERS | 29/03/2023 |
| CC006000000374997 | MR TUSHAR UTEKAR MRS SHEETAL TUSHAR UTEKAR MS KARUNA UTEKAR | M/S BHAGWATI DEVELOPERS | 29/03/2023 |
| CC006000000375026 | MR NARESH KUMAR SHARMA, MR GAURAV SHARMA AND MS NEENA SHARMA | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375038 | MS SHREEVARDHINI PARCHURE | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375123 | MRS SARITA VIVEK BHANDARI AND MR VIVEK BHANDARI | M/S. BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375120 | MR GURUNAND NAMDEO HOWAL | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375124 | MR SANTOSH SHANTARAM CHIPLUNKAR | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375149 | MR. SUNIL KUMAR AND MRS. PREETI GUPTA | M/S. BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375142 | MRS HEBIN MINI G AND MR KURIEN K VARGHESE | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375165 | SHUBHANGI SHAH | M/S. BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375170 | MR. JITENDRA MANOHAR MOKASHI AND MRS. DEEPSHIKA JITENDRA MOKASHI | M/S. BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375177 | MR YUVARAJ ANANDA PATIL AND MRS MANISHA YUVARAJ PATIL | M/S BHAGWATI DEVELOPERS | 12/04/2023 |
| CC006000000375219 | AJAY KUMAR GUPTA AND NAMITA GUPTA | M/S. BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000375252 | MR DHARMENDRA KUMAR GAUTAM AND MRS RICHA SINGH | M/S BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000375306 | MRS KHUSHBU VEER AND MR MANISH KUMAR | M/S BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000375301 | MR VIKAS DHIMAN AND MRS SHREYA DHIMAN | M/S BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000375302 | MR VIKAS DHIMAN AND MRS SHREYA DHIMAN | M/S BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000375344 | MR ARUN BHIMRAO POWAR AND MRS SHRADHA ARUN POWAR | M/S BHAGWATI DEVELOPERS | 17/05/2023 |
| CC006000000396014 | MR ANURAG SAXENA AND MRS ARCHANA SAXENA | M/S BHAGWATI DEVELOPERS | 02/06/2023 |
| CC006000000396011 | MR NEERAJ KUMAR MRS ARCHANA SINGH | M/S BHAGWATI DEVELOPERS | 02/06/2023 |
| CC12501541 | Kshitiz Kulshrestha | BHAGWATI DEVELOPERS | 09/05/2025 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 30 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 18 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 Jan 2025
Documents filed115
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 115 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: BG2 FORM 1.pdf | 15 Jan 2026 |
| Form 2File: BG2 FORM 2.pdf | 15 Jan 2026 |
| Form 3File: BG2 FORM 3.pdf | 15 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY BHAGWATI GREENS II.pdf | 15 Jan 2026 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf | 26 Apr 2025 |
| Certificates of CA (Form 3)File: BG 2 FORM 3_compressed.pdf | 26 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BG2 FORM 2.pdf | 26 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: BHAGWATI DEVELEOPERS KHARGHAR SECTOR 23 PLOT NO 5 SOLD UNSOLD.pdf | 26 Apr 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: BG2.pdf | 29 Jan 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GREENS 2 OC 2.pdf | 22 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bhagwati Developer Form -5 FY 23-24 for Plot-05.pdf | 24 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf | 19 Oct 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 (2).pdf | 17 Oct 2024 |
| Certificates of CA (Form 3)File: FORM 03.pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 (2).pdf | 17 Oct 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Greens 2 Engineer.pdf | 18 Jun 2024 |
| Certificates of CA (Form 3)File: FORM 3 BG2.pdf | 18 Jun 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form-5 -22-23- plot-05.pdf | 17 Nov 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC LETTER.pdf | 8 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: green 2 form 5 bhagwati developers - 19-20.pdf | 3 Aug 2023 |
| Declaration in FORM BFile: FORM B - BHAGWATI GREENS - II.pdf | 29 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - BHAGWATI GREENS - II - 23-07-2023.pdf | 29 Jul 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - BHAGWATI GREENS - II.pdf | 29 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A - BHAGWATI GREENS - II - MARCH 2023.pdf | 29 Jul 2023 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD INVENTORY - BHAGWATI GREENS - II.pdf | 29 Jul 2023 |
| Certificates of CA (Form 3)File: FORM-3 - BHAGWATI GREENS - II.pdf | 29 Jul 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA FORM 1 KHARGHAR.pdf | 20 Apr 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 RERA PLOT 5 APRIL.pdf | 19 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD UNSOLD 01-04-2023.pdf | 19 Apr 2023 |
| Building plan approvalFile: AMENDED CC BLUE PRINT - Copy-1-3.pdf | 18 Apr 2023 |
| Building plan approvalFile: AMENDED CC BLUE PRINT -4-5.pdf | 18 Apr 2023 |
| Building plan approvalFile: AMENDED CC BLUE PRINT -6.pdf | 18 Apr 2023 |
| Building Plan Approval (IOD)File: AMENDED CC BLUE PRINT - Copy-1-3.pdf | 18 Apr 2023 |
| Building Plan Approval (IOD)File: AMENDED CC BLUE PRINT -4-5.pdf | 18 Apr 2023 |
| Building Plan Approval (IOD)File: AMENDED CC BLUE PRINT -6.pdf | 18 Apr 2023 |
| Certificates of CA (Form 3)File: Form 3 dec 22_plot 5.pdf | 6 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Plot-5 -form 5 (21-22).pdf | 6 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: GREENS 2 SOLD - UNSOLD.pdf | 8 Mar 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Rera Certificate 5, 23, Kharghar form 1.pdf | 3 Mar 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE BHAGWATI GREENS II.pdf | 3 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: santosh nair 2020.pdf | 3 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: santosh nair 2022.pdf | 3 Mar 2023 |
| Declaration about Commencement CertificateFile: Bhagwati developers declaration .pdf | 27 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dimensions _compressed.pdf | 27 Jun 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Structural Concept _compressed.pdf | 27 Jun 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Santosh Krishna .pdf | 27 Jun 2022 |
| Certificates of CA (Form 3)File: GREENS 2 CA CERTIFCATE.pdf | 27 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Greens-II Bhagwati form-5 (20-21).pdf | 27 Jun 2022 |
| OtherFile: BHAGWATI GREENS II FINAL BROCHURE 12 PF COMP.pdf | 27 Jun 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5- plot 05 G2.pdf | 31 Oct 2019 |
| Declaration in FORM BFile: GREENS 2 FROM B.pdf | 1 Jul 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: CIDCO CC P 5.pdf | 24 Jun 2019 |
| Proforma of Allotment letterFile: GREENS-2 LIC DRAFT - Copy.pdf | 21 Dec 2018 |
| Certificates of CA (Form 5)File: BD- GREENS II.PDF | 22 Nov 2018 |
| Details of encumbrancesFile: CERTIFICATE.pdf | 13 Jun 2018 |
| Proforma of Allotment letterFile: GREENS 2 FINAL.pdf | 10 Oct 2017 |
| Proforma of Allotment letterFile: ALLOTMENT GR 2.pdf | 10 Oct 2017 |
| Layout approvalFile: 1.pdf | 30 Jul 2017 |
| Building plan approvalFile: 1.pdf | 30 Jul 2017 |
| Building plan approvalFile: 2.pdf | 30 Jul 2017 |
| Building plan approvalFile: 3.pdf | 30 Jul 2017 |
| Building plan approvalFile: 4.pdf | 30 Jul 2017 |
| Building plan approvalFile: 5.pdf | 30 Jul 2017 |
| Building plan approvalFile: 6.pdf | 30 Jul 2017 |
| Building plan approvalFile: 7.pdf | 30 Jul 2017 |
| Building plan approvalFile: 8.pdf | 30 Jul 2017 |
| Building plan approvalFile: 9.pdf | 30 Jul 2017 |
| PAN CardFile: bhag dev pan.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: 001.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: 002.pdf | 30 Jul 2017 |
| Copy of the legal title reportFile: 003.pdf | 30 Jul 2017 |
| Details of encumbrancesFile: 001.pdf | 30 Jul 2017 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 1.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 2.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 3.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 4.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 5.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 6.pdf | 30 Jul 2017 |
| Building Plan Approval (IOD)File: 7.pdf | 30 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 9 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 115 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BHAGWATI GREENS 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Kharghar5,900+ in Raigarh
Filed coordinates, straight-line distance. 81 registered projects within 2 km.
KHARGHAR HILLS
TODAY PRACHAR DEVELOPERS LLP, BHADRESH RAJ
Gami Bhagwati Orelia
GAMI VISION PRIVATE LIMITED
ANANDAM - II
TODAY GLOBAL HOMES
Godrej Varanya Phase 1
Godrej Properties Limited
Sai World Empire Phase III
paradisesuperstructures
SATYAM TRINITY TOWERS
SATYAM INFRA REALTY LLP
See every Raigarh project, with the district possession charts
Builder: BHAGWATI DEVELOPERS
BHAGWATI DEVELOPERS has 10 registrations on MahaRERA, including BHAGWATI ELEGANZA and BHAGWATI IMPERIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that BHAGWATI GREENS 2 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if BHAGWATI GREENS 2 is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BHAGWATI GREENS 2?
The registered promoter entity is BHAGWATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AALFB5272C1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BHAGWATI GREENS 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against BHAGWATI GREENS 2?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for BHAGWATI GREENS 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BHAGWATI GREENS 2?
The professionals named in the filing: Architect: DIMENSIONS ARCHITECTS PVT LTD; Architect: DIMENSIONS ARCHITECT PVT LTD; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Engineer: STRUCTURAL CONCEPT PVT LTD; Chartered Accountant: H M SHAH AND ASSACIATES; Chartered Accountant: H M SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BHAGWATI GREENS 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback