Home / Browse projects / Mumbai Suburban, Maharashtra / BHAGWAN RESIDENCY

Registered No litigation declared Residential / Group Housing project

BHAGWAN RESIDENCY

By V3 PARTNERS

RG-MH-66262 · RERA P51800049808 · Last updated on MahaRERA portal: 3 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 10 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedmoved 10 months from the original
4 of 11Construction stages donefurthest along: Stilt Floor, 90%
14 of 17Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

BHAGWAN RESIDENCY is a Residential / Group Housing project by V3 PARTNERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800049808 on 24 Feb 2023. Possession is promised by 30 Oct 2026. The completion date has moved by 10 months from the original filing. 3 of the 17 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameBHAGWAN RESIDENCY
  • TypeResidential / Group Housing
  • Location
    • R C MARG
    • COLLECTORS COLONY
    • Wadhavali
    • Kurla
    • Mumbai Suburban
    • 400074
  • Pincode400074
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800049808
  • ReraGenie IDRG-MH-66262

Builder

  • NameV3 PARTNERS
  • Entity typePartnership
  • PartnersKALPESH HIMMATLAL JAIN, KAMLESH RANCHHODBHAI MANGROLIYA
  • PartnerAlpesh Vajubhai Kunjadia
  • Other registrations2 more →
  • Completed1 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredFeb 2023First promiseDec 2025Revised toOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on24 Feb 2023
  • Promised completion30 Oct 2026
  • Revised completionRevised to 30 Oct 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed43 files

Current status

18%3 of 17 units booked
59.0%Work done, per cost certificate

Figures as on 3 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHAGWAN RESIDENCYNA10917017

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 3 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 90%.

BHAGWAN RESIDENCY: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)-
Podiums (if any)-
Plinth100%
Stilt Floor90%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 3 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership6

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area222 sq m
Land owned byThe promoter, with other names on the file
Named landowners6
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Nov 2025
LandownerVillageDistrict
V3 PARTNERSMadpeshwarMumbai Suburban
DAYA BHAGWANDAS KHETANIWadhavaliMumbai Suburban
MRS. SHWETA RAJU MANEK nee SHWETA B KHETANIWadhavaliMumbai Suburban
MRS. NISHTA DINESH KITHANY nee NISHTA B KHETANIWadhavaliMumbai Suburban
RITIKA KAMAL RAJPAL nee RITIKA B KHETANIWadhavaliMumbai Suburban
MRS. VIDHI JAGDISH KHITHANI nee VIDHI B KHETANIWadhavaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI598.0
Proposed, not sanctioned598 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI BANK DAHISAR WEST MUMBAI 400068
Estimated costRs 2.85 cr
Cost incurredRs 1.68 cr
Work done58.99%
BuildingWingEstimatedIncurred
BHAGWAN RESIDENCYNARs 2.70 crRs 1.65 cr
-NARs 15.00 lakhRs 3.00 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectB H WADHWA AND CHHADVA ASSOCIATES
EngineerALPESH KUNJADIA
Chartered AccountantASHVIN THUMAR & CO
PartnerRole in project
V3 PARTNERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA09122518582Dec 2025 → Oct 2026

Reason as filed by the promoterCouldn't procure Slum TDR on time due to non availability in major part of city

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jan 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jan 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Oct 2026

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Arch Certificate.pdf3 Jan 2026
Withdrawal Update Form 2File: FORM 2A Engineers certificate.pdf3 Jan 2026
Withdrawal Update Form 3File: Form 3 CA.pdf3 Jan 2026
Withdrawal Update Form 1File: Form 1 Arch Certificate.pdf9 Dec 2025
Withdrawal Update Form 2File: FORM 2A Engineers certificate.pdf9 Dec 2025
Withdrawal Update Form 3File: Form 3 CA.pdf9 Dec 2025
Form 2A (FY 2022-2023)File: FORM 2A Engineers certificate.pdf9 Dec 2025
Form 2A (FY 2023-2024)File: FORM 2A Engineers certificate.pdf9 Dec 2025
Form 2A (FY 2024-2025)File: FORM 2A Engineers certificate.pdf9 Dec 2025
Form 2A (FY 2025-2026)File: FORM 2A Engineers certificate.pdf9 Dec 2025
Form 1File: Form 1 Arch Certificate.pdf26 Nov 2025
Form 2File: FORM 2A Engineers certificate.pdf26 Nov 2025
Form 3File: Form 3 CA.pdf26 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold & unsold inventory 84A Rera _251125_175900.pdf26 Nov 2025
Self-declaration of Quarterly ProgressFile: Self declaration WP 84A Rera _251125_175822.pdf26 Nov 2025
Withdrawal Update Form 1File: FORM 1 ARCHITECT Certificate-compressed.pdf26 Nov 2025
Withdrawal Update Form 2File: FORM 2A Engineers certificate.pdf26 Nov 2025
Withdrawal Update Form 3File: CA rera 21.11.2025.pdf26 Nov 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Rera CA 84A.pdf16 Feb 2023
Details of encumbrances concerned to FinanceFile: No Encumbrances Legal.pdf23 Jan 2023
Details of encumbrances concerned to LegalFile: No Encumbrances Legal.pdf23 Jan 2023
Proforma of Allotment letterFile: Annexure 1 Model form for rera 84A.pdf23 Jan 2023
Proforma of Agreement for saleFile: RERA Agreement_FINAL18012023.pdf23 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Fomat A Rera Declaration of bank account 84A.pdf23 Jan 2023
Deviation Report with respect to Allotment letterFile: Allotement Deviation letter For rera 84A.pdf23 Jan 2023
Deviation Report with respect to model copy of AgreementFile: Agreement clause Deviation rera 84A.pdf23 Jan 2023
Details of encumbrances concerned to FinanceFile: Encumbrances certificate_20230102134052.pdf13 Jan 2023
Details of encumbrances concerned to LegalFile: Encumbrances certificate_20230102134052.pdf13 Jan 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DISCLOSURE.pdf13 Jan 2023
Layout approvalFile: 84 A Drawing.pdf3 Jan 2023
Building plan approvalFile: 84 A Drawing.pdf3 Jan 2023
PAN CardFile: v3 pan card.pdf3 Jan 2023
Copy of the legal title reportFile: 84A_New Title Certificate_compressed.pdf3 Jan 2023
Copy of Layout Approval (in case of layout)File: 84 A Drawing.pdf3 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 84 A Drawing.pdf3 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: 2355773_FirstCC_signed.pdf3 Jan 2023
Declaration about Commencement CertificateFile: Declaration about CC_20230102134333.pdf3 Jan 2023
Declaration in FORM BFile: 84A Rera Form B .pdf3 Jan 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT Certificate-compressed.pdf3 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2A Engineers certificate.pdf3 Jan 2023
CERSAI detailsFile: CERSAI_Search_Report_200256516019_For_Asset_Based_Search_02_01_2023_13_11_35_117.pdf3 Jan 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold inventory_20230102134225.pdf3 Jan 2023
Status of ConveyanceFile: property card 386_38 23-03-2022.pdf3 Jan 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
AMAR JYOTPLOT NO 41 A COLLECTORS COLONY R C MARG CHEMBUR14CompletedApr 2016Oct 2015

How this compares with Mumbai Suburban

18%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 10 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHAGWAN RESIDENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near COLLECTORS COLONY6,700+ in Mumbai Suburban

2 kmBHAGWAN RESIDENCYCompleted 99Lapsed / revoked 66Other 88Dot size: filed unitsN

Filed coordinates, straight-line distance. 253 registered projects within 2 km.

Builder: V3 PARTNERS

V3 PARTNERS has 3 registrations on MahaRERA, including 117 RESIDENCY and SHIV PARBAT. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BHAGWAN RESIDENCY is delayed beyond 30 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAGWAN RESIDENCY?

The registered promoter entity is V3 PARTNERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAGWAN RESIDENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAGWAN RESIDENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAGWAN RESIDENCY?

The professionals named in the filing: Architect: B H WADHWA AND CHHADVA ASSOCIATES; Engineer: ALPESH KUNJADIA; Chartered Accountant: ASHVIN THUMAR & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAGWAN RESIDENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAGWAN RESIDENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAGWAN RESIDENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.