Home / Browse projects / Raigarh, Maharashtra / Belmac Riverside - III A BLDG

Completed No litigation declared Residential / Group Housing project

Belmac Riverside - III A BLDG

By SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

RG-MH-14464 · RERA P52000022972 · Last updated on MahaRERA portal: 19 Jun 2024

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
9 of 11Construction stages donefurthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Belmac Riverside - III A BLDG is a Residential / Group Housing project by SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED in Raigarh, Maharashtra, registered with MahaRERA as P52000022972 on 6 Nov 2019. The registration is recorded completed; possession was promised by 15 Aug 2024. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBelmac Riverside - III A BLDG
  • TypeResidential / Group Housing
  • Location
    • GAT NO. 99/1
    • 99/2/1
    • 99/2/2
    • 99/3/1
    • Akurli Village
    • Akurli
    • Panvel
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000022972
  • ReraGenie IDRG-MH-14464

Builder

  • NameSUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED
  • Entity typeCompany
  • Company SecretoryROHAN CHINCHKAR
  • Managing DirectorVIDIP VINOD JATIA
  • Other registrations9 more →
  • Completed10 of 10
  • Declared earlier projects2 →

Key dates

this monthRegisteredNov 2019PromisedAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Nov 2019
  • Promised completion15 Aug 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Belmac Riverside - III A BLDGNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Belmac Riverside - III A BLDG: 82% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Jun 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed22

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots22
Closed/Covered13
Open Space9

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,829 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Namita JatiaMumbai CityMumbai City
Vidip JatiaMumbai CityMumbai City
Orion TrustMumbai CityMumbai City

Approvals and building plan

Permissible FSI2773.94
Proposed, not sanctioned2,774 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch101-104, Tulsiani Chambers, Freepress, Journal Marg, Nariman Point, Mumbai - 400 021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSangeeta Mojage
EngineerShrimant Dymagol
Chartered AccountantShilpa Bansal
PartnerRole in project
SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED-

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC006000000408139vikas kitkeVidip Jatia18/11/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Oct 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Oct 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 6 Sep 2023

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Wing A.pdf19 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Ph 3 A wing Form 5.pdf19 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Riverside Belmac III A Building.pdf16 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Riverside Belmac III A Building.pdf16 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Riverside Belmac III A Building.pdf16 Nov 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 PIII A wing Final.pdf14 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase III Bldg A 3062023.pdf6 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase III Bldg A 30062023.pdf6 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase III Bldg A 30062023.pdf6 Sep 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC of Phase III A wing 14082023.pdf6 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Wing A 31032023.pdf4 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate Wing A 31032023.pdf4 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase III A wing as on 31032023.pdf4 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2 A PIII-A - FY 2022-23.pdf22 Jun 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PHASE III A wing.pdf22 Jun 2023
Other - LegalFile: Reply of show cause with supporting documents.pdf14 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 -III-Awing_compressed.pdf22 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 _ Phase III- A Wing_compressed.pdf22 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A _ Phase III A wing.pdf21 Feb 2023
Other - LegalFile: Explanation to MahaRERA.PDF16 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PIII-A wing _Dec 2022_.pdf7 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: RERA-Form-5 Tower III-A Belmac Riverside.pdf6 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format P-III-A Wing.pdf4 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate _P-III A Wing_.pdf4 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 PIII-A wing _September 2022.pdf4 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Wing A.pdf6 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New Format Engineer Certificate Wing A_compressed.pdf6 Dec 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Wing A_compressed.pdf6 Dec 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New Format Wing III Building A.pdf11 Nov 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate Wing III Building A.pdf11 Nov 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate Riverside III Wing A.pdf11 Nov 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase 2 A Wing 31122021.PDF27 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3 A Wing 31122021_compressed.pdf27 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 A Wing_compressed.pdf27 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 A Wing 310321.pdf1 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PH 3 Form 1.pdf18 Sep 2021
Declaration about Commencement CertificateFile: Phase III.pdf15 Sep 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase 3_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A Wing III_compressed.pdf15 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A Form Phase III_compressed.pdf15 Sep 2021
Disclosure of sold/ booked inventoryFile: Phase III.pdf15 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 Riverside Phase 3 Done.pdf15 Sep 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase III_compressed.pdf17 May 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase III_compressed.pdf17 May 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase 3 Tower A 311220 Final.pdf17 May 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Phase III Signed.pdf18 Nov 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase III.pdf18 Nov 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Phase 3 A Wing Form 3.pdf18 Nov 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 Riverside Phase 3 Tower A.pdf18 Nov 2020
Copy of the legal title reportFile: Legal title report.pdf19 Oct 2019
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf17 Oct 2019
Proforma of Allotment letterFile: Proforma agreement to sell.pdf17 Oct 2019
Layout approvalFile: Layout Plan.pdf7 Oct 2019
Building plan approvalFile: Building Plan.pdf7 Oct 2019
PAN CardFile: SHHL PAN.pdf7 Oct 2019
Details of encumbrancesFile: Details of encumbrances.PDF7 Oct 2019
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf7 Oct 2019
Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf7 Oct 2019
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf7 Oct 2019
Declaration in FORM BFile: Form B Declaration.pdf7 Oct 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Belmac Riverside - III A BLDG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Akurli Village5,900+ in Raigarh

Builder: SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED

SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED has 10 registrations on MahaRERA, including Belmac Residences E and Belmac Residences D. Its filings disclose 2 earlier MahaRERA projects: declares 1 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Belmac Riverside - III A BLDG is delayed beyond 15 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Belmac Riverside - III A BLDG?

The registered promoter entity is SUPREME HOLDINGS & HOSPITALITY (INDIA) LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Belmac Riverside - III A BLDG?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Belmac Riverside - III A BLDG?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Belmac Riverside - III A BLDG?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Belmac Riverside - III A BLDG?

The professionals named in the filing: Architect: Sangeeta Mojage; Engineer: Shrimant Dymagol; Chartered Accountant: Shilpa Bansal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Belmac Riverside - III A BLDG?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Belmac Riverside - III A BLDG. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Belmac Riverside - III A BLDG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.