ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / BELLA VISTA

Completed No litigation declared Others project

BELLA VISTA

By SIDHARTH ENTERPRISES

RG-MH-30758 · RERA P51800031740 · Last updated on MahaRERA portal: 27 May 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 3 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 83 documents Report an error

BELLA VISTA is a Others project by SIDHARTH ENTERPRISES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031740 on 8 Nov 2021. The registration is recorded completed; possession was promised by 31 Dec 2026.

At a glance

Project

  • NameBELLA VISTA
  • TypeOthers
  • Location
    • NA
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031740
  • ReraGenie IDRG-MH-30758

Builder

  • NameSIDHARTH ENTERPRISES
  • Entity typePartnership
  • PartnersCHETAN DALICHAND SHAH, SANJAY DALICHAND SHAH, PARESH DALICHAND SHAH
  • Declared earlier projects3 →

Key dates

this monthRegisteredNov 2021PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on8 Nov 2021
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed83 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
OMKAMAL NIKETAN CHS LTDNA190000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

OMKAMAL NIKETAN CHS LTD: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 27 May 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed74

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots74
Closed/Covered74

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,280 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
OMKAMAL NIKETANCHS LTDBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI4319.09
Proposed, not sanctioned4,319 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA-DEV PRESTIGE , AZAD NAGAR, VEERA DESAI ROAD, ANDHERI WEST , MUMBAI-400058

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. DP ASSOCIATES Mr. Priyank Bhatt/ Mr. Devang Mody
EngineerMr. Jinesh Ashok Choksi
Chartered AccountantPradeepkumar Singhi & Associates
PartnerRole in project
SIDHARTH ENTERPRISES-

Litigation declared1

CaseCourtStatus
3788/2022HIGHT COURT BOMBAYNO INTERIM RELIEF AS ON DATE PENDING FOR ADMISSION

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Oct 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Feb 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 22 May 2024

Documents filed83

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 83 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERIFICATE.pdf27 May 2024
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4.pdf27 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BELLA VISTA.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERTIFICATE BELLA-VISTA.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S RERA CERTIFICATE.pdf22 May 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate.pdf22 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 23-24.pdf7 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 FY 23-24.pdf7 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S RERA CERTIFICATE 02042024.pdf5 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE BELLA-VISTA.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD-BOOKED INVENTORY DETAILS.pdf5 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-03-2024.pdf5 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Inventory_31-12-23.pdf4 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 31-12-2023.pdf4 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S RERA CERTIFICATE.pdf3 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BELLA -VISTA ENGINEER CERTIFICATE.pdf3 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S RERA CERTIFICATE 03102023.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate 30-09-2023.pdf6 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: QUALITY ASSURANCE CERTIFICTE 30-09-2023.pdf6 Oct 2023
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf6 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE30092023.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 FY 22-23.pdf27 Sep 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S RERA CERTIFICATE 30 06 2023 (1).pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf5 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY 30062023.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE BELLA VISTA 30062023.pdf5 Jul 2023
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD-BOOKED INVENTORY DETAILS.pdf7 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE 31-03-2023.pdf7 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf6 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf6 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE.pdf6 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT RERA CFT 31 12 2022.pdf6 Jan 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE.pdf6 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY ASSURANCE CERTIFICATE.pdf6 Jan 2023
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD-BOOKED INVENTORY DETAILS 31122022.pdf6 Jan 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE_31122022.pdf6 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: OM -KAMAL SOCIETY REGISTRATION CERTIFICATE.pdf28 Oct 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf11 Oct 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf11 Oct 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE.pdf11 Oct 2022
Disclosure of sold/ booked inventoryFile: DISCLOUSRE OF SOLD-BOOKED INVENTORY.pdf11 Oct 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf11 Oct 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 21-22.pdf30 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE.pdf8 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf8 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf7 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf7 Jul 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE CERTIFICATE.pdf7 Jul 2022
Disclosure of sold/ booked inventoryFile: Discloser of Sold Booked Inventory.pdf7 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf7 Apr 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf7 Apr 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE.pdf7 Apr 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE.pdf7 Apr 2022
OtherFile: QUALITY ASSURANCE CERTIFICATE.pdf7 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf28 Feb 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 1.pdf10 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE 1.pdf10 Jan 2022
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD - BOOKED INVENTORY AS ON 31-12-2021.pdf10 Jan 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE AS ON 31-12-2021.pdf10 Jan 2022
Copy of the legal title reportFile: Title Certificate (as per RERA).pdf29 Oct 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf22 Oct 2021
Building plan approvalFile: PLANS-1-4.pdf21 Oct 2021
Building plan approvalFile: PLANS-5-6.pdf21 Oct 2021
Building plan approvalFile: PLANS-7-8.pdf21 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS-1-4.pdf21 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS-5-6.pdf21 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: PLANS-7-8.pdf21 Oct 2021
Declaration about Commencement CertificateFile: DeclarationaboutCC.pdf21 Oct 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf21 Oct 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf21 Oct 2021
OtherFile: QUALITY ASSURANCE CERTIFICATE.pdf21 Oct 2021
Building plan approvalFile: IOD ISSUE.pdf19 Oct 2021
Layout approvalFile: BMC APPROVED LAYOUT PLAN.pdf19 Oct 2021
Copy of Layout Approval (in case of layout)File: BMC APPROVED LAYOUT PLAN.pdf19 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: IOD ISSUE.pdf19 Oct 2021
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf19 Oct 2021
Proforma of Allotment letterFile: PROFORMA FOR AGREEMENT FOR SALE.pdf19 Oct 2021
PAN CardFile: SIDHARTH ENTERPRISES PAN CARD COPY.pdf27 Sep 2021

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
LAXMI FLAT OWNERS CHS LTDSHAHAJI RAJE MARG VILE PARLE EAST MUMBAI 40005749CompletedApr 2017Apr 2017
STATE BANK OF INDIA EMPLOYEES CHS LTDVEERA DESAI ROAD AZAD NAGAR ROAD NO 3 ANDHERI WEST MUMBAI43CompletedAug 2016Aug 2016
KANDIVALI TRIVENI CHS LTDRAMGALLI KANDIVALI WEST MUMBAI 40006730CompletedJun 2016Jun 2016

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BELLA VISTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NA6,700+ in Mumbai Suburban

2 kmBELLA VISTACompleted 165Lapsed / revoked 98Other 223Dot size: filed unitsN

Filed coordinates, straight-line distance. 486 registered projects within 2 km.

Builder: SIDHARTH ENTERPRISES

SIDHARTH ENTERPRISES has 1 registration on MahaRERA, including BELLA VISTA. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BELLA VISTA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BELLA VISTA?

The registered promoter entity is SIDHARTH ENTERPRISES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BELLA VISTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BELLA VISTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BELLA VISTA?

The professionals named in the filing: Architect: M/s. DP ASSOCIATES Mr. Priyank Bhatt/ Mr. Devang Mody; Engineer: Mr. Jinesh Ashok Choksi; Chartered Accountant: Pradeepkumar Singhi & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BELLA VISTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BELLA VISTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BELLA VISTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.