Home / Browse projects / Mumbai Suburban, Maharashtra / Bathia Building No 2

Completed No litigation declared Residential / Group Housing project

Bathia Building No 2

By M/s. SAMARPAN SPACES

RG-MH-91765 · RERA P51800032562 · Last updated on MahaRERA portal: 25 Oct 2024

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 60 documents Report an error

Bathia Building No 2 is a Residential / Group Housing project by M/s. SAMARPAN SPACES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800032562 on 11 Jan 2022. The registration is recorded completed; possession was promised by 31 Dec 2024.

At a glance

Project

  • NameBathia Building No 2
  • TypeResidential / Group Housing
  • Location
    • 18.3 Meter Road
    • Borivali West
    • Mumbai
    • Opp Shastri Nagar Petrol Pump
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • RERA no.P51800032562
  • ReraGenie IDRG-MH-91765

Builder

  • NameM/s. SAMARPAN SPACES
  • Entity typePartnership
  • GSTIN27ADZFS0919A1ZV
  • PartnersRAJAN JAYSINH KAPADIA, ASHOK SUNIL SINHA
  • Declared earlier projects4 →

Key dates

this monthRegisteredJan 2022PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Jan 2022
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed60 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bathia Building No 2NA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Bathia Building No 2: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 25 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area879 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on24 Sep 2024
LandownerVillageDistrict
Jaysinh V KapadiaBorivaliMumbai Suburban
Bathia Building No 2BorivaliMumbai Suburban

Approvals and building plan

Permissible FSI2846.05
Proposed, not sanctioned2,846 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSVP Road Chamunda Circle Borivali West

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKiran Rokadia
ArchitectNilesh Makwana
EngineerAshish Ved
Chartered AccountantNilesh J Panchal PANCHAL
PartnerRole in project
M/s. SAMARPAN SPACES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Nov 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Jan 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 17 Aug 2024

Documents filed60

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ( BATHIA RERA PROJECT COMPLETION CERTIFICATE) SIGNED (1).pdf25 Oct 2024
Form 5 (FY 2021-2022)3 Oct 2024
Form 5 (FY 2023-2024)File: CA Form- 5 (FY 2023-24).pdf3 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf17 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form- 5 (FY 2022-23).pdf1 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA Form- 5 (FY 2023-24).pdf1 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineer Certificate 2023 to 2024.pdf23 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM 2A Engineer Certificate 2022 to 2023.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Other Rera Project- Ashok final.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Other Rera Project- Jaysinh Final.pdf16 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declaration of Other Rera Project- Rajan Final.pdf16 May 2024
Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf11 May 2024
Details of encumbrances concerned to LegalFile: Details of encumbrances concerned to Legal.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: Information of Sold-Booked Inventory.pdf11 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declartion of Other Real Estate - Ashok.pdf11 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declartion of other Real Estate - Jaysingh.pdf11 May 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Declartion of Other Real Estate - Rajan.pdf11 May 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declartion about Separte Bank Account.pdf11 May 2024
Deviation Report with respect to Allotment letterFile: Deviation Report with respect to Allotment letter.pdf11 May 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report with respect to model copy of Agreement.pdf11 May 2024
Disclosure of sold/ booked inventoryFile: Bathia Inventory 300923.pdf16 Oct 2023
Disclosure of sold/ booked inventoryFile: bathia inventery 06052023.pdf7 May 2023
Disclosure of sold/ booked inventoryFile: inventory as on 310323.pdf17 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: FULL CC.pdf1 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a AS ON 31032022.pdf20 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - 31032022.pdf16 Jan 2023
Commencement Certificates / NA Order for plotted developmentFile: full cc A wing 8 floor.pdf7 Jan 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: society regitration certificate.pdf7 Jan 2023
Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf4 Nov 2022
Disclosure of sold/ booked inventoryFile: Flat Inventory.pdf16 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC A Wing full n B wing 3rd floor.pdf12 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: CC A wing full B wing 3rd floor.pdf17 Jun 2022
Copy of the legal title reportFile: Legal Title Report .pdf8 Jan 2022
Copy of the legal title reportFile: index - II DA.pdf8 Jan 2022
Copy of the legal title reportFile: Power of Attorney-Index 2_compressed.pdf8 Jan 2022
Copy of the legal title reportFile: Form B Declaration.pdf8 Jan 2022
CERSAI detailsFile: (16) CERSAI_Search_Report_200227706593_For_Asset_Based_Search_08_01_2022_11_05_42_204.pdf8 Jan 2022
CERSAI detailsFile: CERSAI REPORT SUB- DECLARATION (1).pdf8 Jan 2022
Building plan approvalFile: bldg plan1 RERA (1).pdf3 Jan 2022
Building plan approvalFile: bldg plan1 RERA (2).pdf3 Jan 2022
Building plan approvalFile: bldg plan1 RERA (3).pdf3 Jan 2022
Building plan approvalFile: bldg plan1 RERA (4).pdf3 Jan 2022
Building plan approvalFile: bldg plan 5 RERA (5).pdf3 Jan 2022
Details of encumbrancesFile: SELF DECLARATION REGARDING ENCUMBRACES.pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan1 RERA (1).pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan1 RERA (2).pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan1 RERA (3).pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan1 RERA (4).pdf3 Jan 2022
Building Plan Approval / NA Order for plotted developmentFile: bldg plan 5 RERA (5).pdf3 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: Comencement Certificate.pdf3 Jan 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf3 Jan 2022
Declaration in FORM BFile: form B Delaration RERA.pdf3 Jan 2022
Layout approvalFile: (4) LAYOUT PLAN.pdf1 Nov 2021
PAN CardFile: (1) Samarpan Pan Card.pdf1 Nov 2021
Copy of Layout Approval (in case of layout)File: (4) LAYOUT PLAN.pdf1 Nov 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: (9) Architect Certificate Form-1.pdf1 Nov 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: (10) Engineer's Certificate Form 2.pdf1 Nov 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: (12) CA Certificate Form 3.pdf1 Nov 2021
Proforma of Allotment letterFile: (19) allotment letter.pdf1 Nov 2021
Proforma of Allotment letterFile: (19) AGREEMENT FOR SALE.pdf1 Nov 2021

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Gokul Gagan Co Op Housing Society LtdFactory Lane Borivali West Mumbai 40009228CompletedDec 2017Dec 2017
Samarpan PalaceDattapada Road Borivali East Mumbai 40006635CompletedOct 2015Oct 2015
Durga Co Op Housing Society LtdBhausaheb Parab Marg Dahisar West Mumbai 40006824CompletedOct 2015May 2015
Ram Ashish CHS LtdDattapada Road Borivali East Mumbai 40006618CompletedMay 2015May 2015

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bathia Building No 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Opp Shastri Nagar Petrol Pump6,700+ in Mumbai Suburban

Builder: M/s. SAMARPAN SPACES

M/s. SAMARPAN SPACES has 1 registration on MahaRERA, including Bathia Building No 2. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Bathia Building No 2 is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bathia Building No 2?

The registered promoter entity is M/s. SAMARPAN SPACES, a partnership as per the filing. Its GSTIN 27ADZFS0919A1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bathia Building No 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bathia Building No 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bathia Building No 2?

The professionals named in the filing: Architect: Kiran Rokadia; Architect: Nilesh Makwana; Engineer: Ashish Ved; Chartered Accountant: Nilesh J Panchal PANCHAL. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bathia Building No 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bathia Building No 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bathia Building No 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.