Home / Browse projects / Raigarh, Maharashtra / BANSIDHAR

Registered No litigation declared Others project

BANSIDHAR

By KAMAL DEVELOPERS

RG-MH-98818 · RERA P52000046733 · Last updated on MahaRERA portal: 18 Feb 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

BANSIDHAR is a Others project by KAMAL DEVELOPERS in Raigarh, Maharashtra, registered with MahaRERA as P52000046733 on 1 Sep 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameBANSIDHAR
  • TypeOthers
  • Location
    • THANA NAKA ROAD
    • PANVEL
    • Raigarh
    • 410206
  • Pincode410206
  • RERA no.P52000046733
  • ReraGenie IDRG-MH-98818

Builder

  • NameKAMAL DEVELOPERS
  • Entity typePartnership
  • PartnerJITESH LALCHAND JAIN
  • Other registrations2 more →
  • Completed1 of 3

Key dates

this monthRegisteredSep 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Sep 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed69 files

Current status

72.1%Work done, per cost certificate

Figures as on 18 Feb 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BANSIDHARNA90000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

BANSIDHAR: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 18 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes50%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed23

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots23
Closed/Covered23

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area671 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
KALAWATI RATANCHAND KARWAPanvelRaigarh
PUSHPA NANDLAL KARWAPanvelRaigarh

Approvals and building plan

Sanctioning authorityPanvel Municipal Corporation
Permissible FSI2224.78
Proposed, not sanctioned2,225 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGR FLR SHOP NO 2 OFFICE NO 2 FIRST FLR AND MEZZANINE FLR KARNALA ROYAL PANVEL 410206
Estimated costRs 12.00 cr
Cost incurredRs 8.65 cr
Work done72.08%
BuildingWingEstimatedIncurred
BANSIDHARNARs 10.00 crRs 8.62 cr
-NARs 2.00 crRs 2.60 lakh

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDHARTH SHIRUR
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
Chartered AccountantNDS & ASSOCIATES
Chartered AccountantDipika Patel & Co
Chartered AccountantManish Kumar Gupta & Co
PartnerRole in project
KAMAL DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA20122518873Dec 2025 → Dec 2026

Reason as filed by the promoterThe project is under construction but because of the following reasons the promoter would not get the project finally completed within the completion date of 31th December, 2025: 1. The promoter was not able to procure the skilled labour for the construction due to unfavourable labour market, whereby the labour migrated to their home state to exercise their electoral franchise in other states. 2. The promoter has suffered adverse climate condition at the construction site due to heavy rains of Mumbai costal causing water logging for weeks at the site. 3. The construction activities were advers

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Jul 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Jul 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Jul 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Jul 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Architect Certificate 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 Engineer Certificate 31-12-2025.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 CA Certificate 31-12-2025.pdf18 Feb 2026
Form 1File: Form 1 Architect's Certificate 30-9-2025.pdf6 Dec 2025
Form 2File: Form 2 Engineers Certificate 30-9-2025.pdf6 Dec 2025
Form 3File: Form 3 CA Certificate 30-9-2025.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of Sold-Booked Inventories- 30-06-2025.pdf6 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 FY 2024-25 - Kamal Developers.pdf6 Dec 2025
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3 CA Certificate 31-03-2025.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_of_Sold-Booked_Inventories-31-03-2025.pdf15 Oct 2025
Form 1File: Form 1.pdf15 Oct 2025
Form 2File: Form 2.pdf15 Oct 2025
Form 3File: Form 3 CA Certificate 30-06-2025.pdf15 Oct 2025
Disclosure of Sold and Booked InventoryFile: 1_Disclosure_of_Sold-Booked_Inventories-30-06-2025.pdf15 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf24 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 31-12-2024.pdf24 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf24 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annul Report-Form 5 FY 2023-24.pdf19 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Annul Report-Form 5 FY 2023-24.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf15 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New.pdf15 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architects Certificate.pdf2 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate.pdf2 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf16 Oct 2023
Proforma of Allotment letterFile: Final AFS RERA UPDATED 1.pdf22 Aug 2022
Proforma of Allotment letterFile: ALLOTMENT LETTER 1.pdf22 Aug 2022
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf1 Aug 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT REPORT.pdf1 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA CERTIFICATE.pdf1 Aug 2022
Deviation Report with respect to model copy of AgreementFile: NO DEVIATION AGREEMENT FOR SALE.pdf1 Aug 2022
Layout approvalFile: LAYOUT PLAN 232 1.pdf30 Jul 2022
Layout approvalFile: LAYOUT PLAN 232 2.pdf30 Jul 2022
Building plan approvalFile: LAYOUT PLAN 232 1.pdf30 Jul 2022
Building plan approvalFile: LAYOUT PLAN 232 2.pdf30 Jul 2022
Copy of the legal title reportFile: TITLE REPORT.pdf30 Jul 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN 232 1.pdf30 Jul 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN 232 2.pdf30 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN 232 1.pdf30 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: LAYOUT PLAN 232 2.pdf30 Jul 2022
Declaration in FORM BFile: FORM B PROMOTER.pdf30 Jul 2022
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE TO FINANCE.pdf21 Jul 2022
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: NO ENCUMBRANCE OR ESCROW BANK ACCOUNT.pdf21 Jul 2022
Deviation Report with respect to Allotment letterFile: NO DEVIATION ALLOTMENT LETTER.pdf21 Jul 2022
Details of encumbrances concerned to LegalFile: ENCUMBRANCES LETTER.pdf20 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf20 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER CERTFICATE.pdf20 Jul 2022
CERSAI detailsFile: Undertaking Regarding No Security Interest CERSAI.pdf20 Jul 2022
PAN CardFile: PAN CARD.pdf12 Jul 2022

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BANSIDHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

Builder: KAMAL DEVELOPERS

KAMAL DEVELOPERS has 3 registrations on MahaRERA, including LAYOUT and AURUM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if BANSIDHAR is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BANSIDHAR?

The registered promoter entity is KAMAL DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BANSIDHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BANSIDHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BANSIDHAR?

The professionals named in the filing: Architect: SIDDHARTH SHIRUR; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Chartered Accountant: NDS & ASSOCIATES; Chartered Accountant: Dipika Patel & Co; Chartered Accountant: Manish Kumar Gupta & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BANSIDHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BANSIDHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BANSIDHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.