Home / Browse projects / Mumbai Suburban, Maharashtra / BANK OF INDIA EMPLOYEES SUKHADA CHSL

Registered No litigation declared Others project

BANK OF INDIA EMPLOYEES SUKHADA CHSL

By M/S HIRANI REALTORS

RG-MH-05977 · RERA P51800051922 · Last updated on MahaRERA portal: 20 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 6 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 6 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
65 of 78Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 81 documents Report an error

BANK OF INDIA EMPLOYEES SUKHADA CHSL is a Others project by M/S HIRANI REALTORS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051922 on 13 Jul 2023. Possession is promised by 9 Dec 2026. The completion date has moved by 6 months from the original filing. 13 of the 78 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBANK OF INDIA EMPLOYEES SUKHADA CHSL
  • TypeOthers
  • Location
    • RAM MANDIR ROAD
    • BORIVALI WEST
    • Eksar
    • Borivali
    • Mumbai Suburban
    • 400091
  • Pincode400091
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800051922
  • ReraGenie IDRG-MH-05977

Builder

  • NameM/S HIRANI REALTORS
  • Entity typePartnership
  • GSTIN27AAFFH2508B1ZX
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersHASMUKH RAJMAL HIRANI, HASMUKH DEVICHAND SHAH
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2023First promiseJun 2026Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Jul 2023
  • Promised completion9 Dec 2026
  • Revised completionRevised to 9 Dec 2026 (originally 10 Jun 2026)
  • Buildings1 building record
  • Documents filed81 files

Current status

17%13 of 78 units booked
73.5%Work done, per cost certificate

Figures as on 20 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BANK OF INDIA EMPLOYEES SUKHADA CHSLNA222170878

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

BANK OF INDIA EMPLOYEES SUKHADA CHSL: 63% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.95%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed95

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots95
Closed/Covered95

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,973 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Jul 2025

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI6391.22
Proposed, not sanctioned6,385 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSHOP NO 2-6 SHROFF ARCADE SODAWALA LANE NEAR PROBODHAN MUMBAI 400092
Estimated costRs 34.00 cr
Cost incurredRs 25.00 cr
Work done73.53%
BuildingWingEstimatedIncurred
BANK OF INDIA EMPLOYEES SUKHADA CHSLNARs 33.00 crRs 25.00 cr
-NARs 1.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSarc Architects Sanjay S Neve Sunil S Jain
EngineerRAJKUMAR BHONDE
Chartered AccountantANKUSH GUPTA & ASSOCIATES
Chartered AccountantSHRADHA SHAH
Chartered AccountantB MAHESHWARI & CO
PartnerRole in project
M/S HIRANI REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18052620998Jun 2026 → Dec 2026

Reason as filed by the promoterWe respectfully submit that approximately 70-75% of the project work has already been completed. The remaining 25-30% of the construction and allied development work is expected to require an additional period of around 3-4 months for completion. Further, upon completion of the balance work, the Promoter shall apply for the Full Occupancy Certificate (OC) from the concerned Government Authority. Since the approval and issuance of the Full OC is dependent upon the process and timelines of the concerned Government Authority, the same may require an additional period of approximately 2-3 months.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 1 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 9 Dec 2026

Documents filed81

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 81 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1- 18-07-2026.pdf20 Jul 2026
Withdrawal Update Form 1File: Form 1- 18-07-2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - 19-07-2026.pdf20 Jul 2026
Withdrawal Update Form 2File: Form 2 - 19-07-2026.pdf20 Jul 2026
Withdrawal Update Form 3File: CA CERTIFICATE_SUKHADA CHSL.pdf20 Jul 2026
Withdrawal Update Form 3File: CA CERTIFICATE_SUKHADA CHSL.pdf20 Jul 2026
Form 2A (FY 2023-2024)File: Form 2A_23-24_ Hirani Realtor.pdf26 May 2026
Form 2A (FY 2024-2025)File: Form 2A_24-25_Hirani Realtors.pdf26 May 2026
Form 2A (FY 2025-2026)File: Form 2A_25-26_Hirani Realtors.pdf26 May 2026
Form 5 (FY 2023-2024)File: FORM 5 2023-2024.pdf26 May 2026
Withdrawal Update Form 1File: Architect Certificate_Sukhada.pdf27 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate_Sukhada.pdf27 Apr 2026
Withdrawal Update Form 3File: CA Certificate_Sukhada.pdf27 Apr 2026
Withdrawal Update Form 1File: Sukhada Final Form 1 Sign.pdf23 Jan 2026
Withdrawal Update Form 2File: Sukhada Final Form 2 Sign.pdf23 Jan 2026
Withdrawal Update Form 3File: Sukhada Final Form 3 Sign.pdf23 Jan 2026
Form 5 (FY 2024-2025)File: Sukahda - Form 5 - Mar 25.pdf8 Nov 2025
Withdrawal Update Form 1File: Form 1 15-10-2025.pdf18 Oct 2025
Withdrawal Update Form 2File: Form 2 15-10-2025.pdf18 Oct 2025
Withdrawal Update Form 3File: Form 3 17-10-2025.pdf18 Oct 2025
Building plan approvalFile: BUILDING PLAN 1.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 2.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 3.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 4.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 5.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 6.pdf18 Aug 2025
Building plan approvalFile: BUILDING PLAN 7.pdf18 Aug 2025
Layout approvalFile: LAY OUT PLAN-PAGE 1-2.pdf18 Aug 2025
Building plan approvalFile: PLAN 17012025.pdf31 Jul 2025
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE JUNE 25.pdf31 Jul 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE JUNE25.pdf31 Jul 2025
Withdrawal Update Form 3File: CERTIFICATE - SUKHADA 01-08-2024.pdf31 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-09-04-2025.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 14-04-2025.pdf1 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 10-04-2025.pdf1 May 2025
Commencement Certificates / NA Order for plotted developmentFile: Sukhada_FurtherCC_signed 12-03-2025.pdf1 May 2025
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf1 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 08-01-2025.pdf14 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 07-01-2025.pdf14 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 07-01-2025.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-25-10-2024.pdf29 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BOIE Sukhda Engineer Certificate -20-10-2024.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 14-10-2024.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sukhada CHS form 2 -31- 07- 2024.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 17-04-2024.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CERTIFICATE - SUKHADA 01-08-2024.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 11-07-2024.pdf13 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bank Of India Employees Sukhada CHSl.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-01-04-2024.pdf11 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 16-01-2024.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Further CC.pdf20 Jan 2024
Declaration about Commencement CertificateFile: Further CC Decleration.pdf20 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 15-01-2024.pdf19 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 15-01-2024_compressed.pdf19 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEERS CERTIFICATE Sukhada.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Forrm 3-19-10-2023-SUKHADA.pdf21 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: _Forrm 3-19-10-2023-SUKHADA_.pdf21 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-07-10-2023 SUKHADA.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: DocScanner Jul 11, 2023 16-02_compressed.pdf11 Jul 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance Legal.pdf29 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance Legal.pdf29 Jun 2023
Copy of the legal title reportFile: Sukhada Title Report Format A_compressed.pdf24 Jun 2023
Building plan approvalFile: IOD Plan compressed.pdf17 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: IOD Plan compressed.pdf17 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: null.pdf17 Jun 2023
Declaration about Commencement CertificateFile: Format D.pdf17 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf17 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SCAN_20230623_145106358.pdf17 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SCAN_20230614_122738589.pdf14 Jun 2023
Proforma of Agreement for saleFile: Agreement for sale sukhada_compressed_compressed_compressed.pdf5 Jun 2023
Declaration in FORM BFile: FORM B_compressed.pdf3 Jun 2023
Layout approvalFile: Block Location Plan.pdf1 Jun 2023
PAN CardFile: PAN CARD.pdf1 Jun 2023
Details of encumbrances concerned to FinanceFile: No Encumbrance to Finance.pdf1 Jun 2023
Details of encumbrances concerned to LegalFile: No Encumbrance to Finance.pdf1 Jun 2023
Copy of Layout Approval (in case of layout)File: Block Location Plan.pdf1 Jun 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf1 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: revised form 3_compressed.pdf1 Jun 2023
Proforma of Allotment letterFile: Allotment letter_compressed.pdf1 Jun 2023
Deviation Report with respect to Allotment letterFile: No deviation allotment.pdf1 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BANK OF INDIA EMPLOYEES SUKHADA CHSLPLOT NO 316 EKSAR RAM MANDIR ROAD BORIWALI WEST MUMBAI 40009160OngoingJun 2026Jun 2026

How this compares with Mumbai Suburban

17%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 6 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BANK OF INDIA EMPLOYEES SUKHADA CHSL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI WEST6,700+ in Mumbai Suburban

2 kmBANK OF INDIA EMPLOYEES Completed 143Lapsed / revoked 84Other 215Dot size: filed unitsN

Filed coordinates, straight-line distance. 442 registered projects within 2 km.

Builder: M/S HIRANI REALTORS

M/S HIRANI REALTORS has 2 registrations on MahaRERA, including BANK OF INDIA EMPLOYEES SUKHADA CHSL and Dollars Avenue CHSL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BANK OF INDIA EMPLOYEES SUKHADA CHSL is delayed beyond 9 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BANK OF INDIA EMPLOYEES SUKHADA CHSL?

The registered promoter entity is M/S HIRANI REALTORS, a partnership as per the filing. Its GSTIN 27AAFFH2508B1ZX can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BANK OF INDIA EMPLOYEES SUKHADA CHSL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BANK OF INDIA EMPLOYEES SUKHADA CHSL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BANK OF INDIA EMPLOYEES SUKHADA CHSL?

The professionals named in the filing: Architect: Sarc Architects Sanjay S Neve Sunil S Jain; Engineer: RAJKUMAR BHONDE; Chartered Accountant: ANKUSH GUPTA & ASSOCIATES; Chartered Accountant: SHRADHA SHAH; Chartered Accountant: B MAHESHWARI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BANK OF INDIA EMPLOYEES SUKHADA CHSL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BANK OF INDIA EMPLOYEES SUKHADA CHSL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BANK OF INDIA EMPLOYEES SUKHADA CHSL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.