Home / Browse projects / Raigarh, Maharashtra / BALAJI ZOWIE

Registered No litigation declared Residential / Group Housing project

BALAJI ZOWIE

By GOVIND RADHURAM JAIDHARA

RG-MH-05570 · RERA P52000051582 · Last updated on MahaRERA portal: 22 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Internal walls, 97%
29 of 53Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

BALAJI ZOWIE is a Residential / Group Housing project by GOVIND RADHURAM JAIDHARA in Raigarh, Maharashtra, registered with MahaRERA as P52000051582 on 27 Jun 2023. Possession is promised by 31 May 2027. 24 of the 53 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBALAJI ZOWIE
  • TypeResidential / Group Housing
  • Location
    • SECTOR 23
    • VILLAGE PANCHANAND TALOJA
    • Chal
    • Panvel
    • Raigarh
    • 410208
  • Pincode410208
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000051582
  • ReraGenie IDRG-MH-05570

Builder

  • NameGOVIND RADHURAM JAIDHARA
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed82 files

Current status

45%24 of 53 units booked
70.8%Work done, per cost certificate

Figures as on 22 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BALAJI ZOWIENA7748553

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 22 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 97%.

BALAJI ZOWIE: 90% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises97%
Sanitary Fittings within the flats / premises97%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.97%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.97%

Progress on shared amenities15

As on 22 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Open Space37

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area894 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on21 Mar 2026

Approvals and building plan

Sanctioning authorityCIDCO
Permissible FSI3487.3
Proposed, not sanctioned3,436 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSECTOR 17 VASHI NAVI MUMBAI
Estimated costRs 10.35 cr
Cost incurredRs 7.32 cr
Work done70.76%
BuildingWingEstimatedIncurred
BALAJI ZOWIENARs 9.49 crRs 7.21 cr
-NARs 85.50 lakhRs 11.81 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSIDDHANT V KHADE
ArchitectENTITTY ARCHITECTS
EngineerRAAJESHK LADHAD
EngineerSTRUCTURAL CONCEPT DESIGNS PVT LTD
Chartered AccountantHEMANT RAJENDRA KOTHARI
Chartered AccountantH R KOTHARI & ASSOCIATES
Chartered AccountantVIKAS GUDADINNI & CO
PartnerRole in project
RELIABLE REALTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 2File: Form 2 - 31-03-2026.pdf22 Apr 2026
Withdrawal Update Form 3File: Form 3 - 31-03-2026.pdf22 Apr 2026
Form 1File: FORM 1 - 31-12-2025.pdf20 Jan 2026
Form 2File: FORM 2 - 31-12-2025.pdf20 Jan 2026
Form 3File: FORM 3 - 31-12-2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY - 31-12-2025.pdf20 Jan 2026
Form 1File: FORM 1 ARCHITECT CERTIFICATE.pdf17 Oct 2025
Form 2File: FORM 2 ENGINEER CERTIFICATE.pdf17 Oct 2025
Form 3File: FORM 3 CA CERTIFICATE.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD.pdf17 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 2024 2025.pdf17 Oct 2025
Form 1File: FORM 1.pdf17 Jul 2025
Form 2File: FORM 2.pdf17 Jul 2025
Form 3File: FORM 3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOUSER OF SOLD AND UNSOLD INVENTORY.pdf17 Jul 2025
Form 1File: ARCHITECT CERTIFICATE.pdf10 Jul 2025
Form 2File: ENGINEER CERTIFICATE.pdf10 Jul 2025
Form 3File: CA CERTIFICATE.pdf10 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD INVENTORY.pdf10 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_11zon.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1)_compressed.pdf16 Jan 2025
Disclosure of sold/ booked inventoryFile: Disclosure of SOLD AND UNSOLD INVENTORY.pdf16 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf23 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold inventory.pdf23 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf23 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (3).pdf22 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (3).pdf22 Oct 2024
Declaration about Commencement CertificateFile: Declaration of CC.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Declartion of Sold and unsold.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer_Certificate_Balaji Zowie.pdf11 May 2024
Declaration about Commencement CertificateFile: Declaration about CC.pdf13 Mar 2024
Disclosure of sold/ booked inventoryFile: LIST OF INVENTORIES.pdf9 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_BALAJI ZOWIE.pdf9 Mar 2024
Layout approvalFile: HPSC0762 (1).pdf5 Mar 2024
Building plan approvalFile: HPSC0767 (1).pdf5 Mar 2024
Copy of Layout Approval (in case of layout)File: HPSC0762 (1).pdf5 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSC0767 (1).pdf5 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: DOC016 (1).PDF5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Rera certificate New updated .pdf5 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: STRUCTURAL CERTIFICATE.pdf5 Mar 2024
Proforma of Agreement for saleFile: AFS.pdf5 Mar 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION (1).pdf5 Mar 2024
Proforma of Agreement for saleFile: Agreeement for sale_upload.pdf20 Jun 2023
Deviation Report with respect to model copy of AgreementFile: Deviation_merged_upload.pdf20 Jun 2023
Disclosure of sold/ booked inventoryFile: RELIABLE_DECLARATION_FLAT UPLOAD-2-3.pdf6 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3_CA_Certificate_updated_.pdf6 Jun 2023
Other - TechnicalFile: RELIABLE_DECLARATION_FLAT UPLOAD-1.pdf6 Jun 2023
Details of encumbrances concerned to FinanceFile: legal Encumberance_upload.pdf2 Jun 2023
Details of encumbrances concerned to LegalFile: legal Encumberance_upload.pdf2 Jun 2023
Declaration in FORM BFile: DOC440.PDF2 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank_Declaration.PDF2 Jun 2023
Other - TechnicalFile: Sent file_RERA AFS Reliable Builders 1004.pdf2 Jun 2023
Other - TechnicalFile: Payment Schedule - BALAJI ZOWIE.pdf2 Jun 2023
Details of encumbrances concerned to FinanceFile: Finance Encumb.pdf6 May 2023
Details of encumbrances concerned to LegalFile: Finance Encumb.pdf6 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Certificate.pdf6 May 2023
Layout approvalFile: TALOJA PLAN-3-4.pdf5 May 2023
Building plan approvalFile: TALOJA PLAN-1-2.pdf5 May 2023
Copy of the legal title reportFile: SEARCH TITLE report.pdf5 May 2023
Copy of Layout Approval (in case of layout)File: TALOJA PLAN-3-4.pdf5 May 2023
Building Plan Approval / NA Order for plotted developmentFile: TALOJA PLAN-1-2.pdf5 May 2023
Commencement Certificates / NA Order for plotted developmentFile: TALOJA CERTIFICATE.pdf5 May 2023
Proforma of Allotment letterFile: Proforma Letter Of Allotment.pdf5 May 2023
Other - LegalFile: Association certificate.pdf5 May 2023
PAN CardFile: Pan Card Govind R Jaidhara.pdf29 Apr 2023
Details of encumbrances concerned to FinanceFile: legal Encumberance_upload.pdf29 Apr 2023
Details of encumbrances concerned to LegalFile: legal Encumberance_upload.pdf29 Apr 2023
Declaration about Commencement CertificateFile: Form D.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE.pdf29 Apr 2023
CERSAI detailsFile: CERSAI.pdf29 Apr 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
BALAJI ANCHALPLOT NO B46 ULWE PANVEL 41020642CompletedDec 2018Dec 2018

How this compares with Raigarh

45%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BALAJI ZOWIE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VILLAGE PANCHANAND TALOJA5,900+ in Raigarh

2 kmBALAJI ZOWIECompleted 62Lapsed / revoked 15Other 77Dot size: filed unitsN

Filed coordinates, straight-line distance. 154 registered projects within 2 km.

Builder: GOVIND RADHURAM JAIDHARA

GOVIND RADHURAM JAIDHARA has 3 registrations on MahaRERA, including BALAJI AURA and BALAJI AANCHAL. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if BALAJI ZOWIE is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BALAJI ZOWIE?

The registered promoter entity is GOVIND RADHURAM JAIDHARA, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BALAJI ZOWIE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BALAJI ZOWIE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BALAJI ZOWIE?

The professionals named in the filing: Architect: SIDDHANT V KHADE; Architect: ENTITTY ARCHITECTS; Engineer: RAAJESHK LADHAD; Engineer: STRUCTURAL CONCEPT DESIGNS PVT LTD; Chartered Accountant: HEMANT RAJENDRA KOTHARI; Chartered Accountant: H R KOTHARI & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BALAJI ZOWIE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BALAJI ZOWIE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BALAJI ZOWIE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.