Home / Browse projects / Raigarh, Maharashtra / BALAJI VISTA
BALAJI VISTA
RG-MH-62308 · RERA P52000046718 · Last updated on MahaRERA portal: 24 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 55.00 crore secured on the land, in favour of VARSHA BUILDCON
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BALAJI VISTA is a Others project by VARSHA BUILDCON in Raigarh, Maharashtra, registered with MahaRERA as P52000046718 on 1 Sep 2022. Possession is promised by 31 May 2027.
At a glance
Project
- NameBALAJI VISTA
- TypeOthers
- Location
- Plot no. 32
- Sector no. 17
- Navi Mumbai
- New Panvel
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000046718
- ReraGenie IDRG-MH-62308
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on1 Sep 2022
- Promised completion31 May 2027
- Revised completionNone
- Buildings1 building record
- Documents filed168 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| BALAJI VISTA | NA | 17 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 24 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 90%.
BALAJI VISTA: 84% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 60% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 90% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 65% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 50% |
Progress on shared amenities15
As on 24 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 30% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed212
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SATISH V AHUJA AND ASSOCIATES |
| Engineer | RAMESH KURAJIBHAI BABARIA |
| Chartered Accountant | A K SARAWGI & COMPANY |
| Chartered Accountant | VIKAS KUMAR |
| Partner | Role in project |
|---|---|
| VARSHA BUILDCON | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Jun 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 May 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 May 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Nov 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 May 2027
Documents filed168
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 168 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: Form 1 Balaji Vista March 26.pdf | 24 Apr 2026 |
| Form 2File: Form 2 Balaji Vista March 26.pdf | 24 Apr 2026 |
| Form 3File: Form 3 Balaji Vista March 26.pdf | 24 Apr 2026 |
| Disclosure of Sold and Booked InventoryFile: Balaji Vista Disclosure of Sold and Booked Inventory March 26.pdf | 24 Apr 2026 |
| Form 1File: Form 1 Balaji Vista Dec 2025.pdf | 23 Jan 2026 |
| Form 2File: Form 2 Balaji Vista Dec 2025.pdf | 23 Jan 2026 |
| Form 3File: Form 3 Balaji Vista Dec 2025.pdf | 23 Jan 2026 |
| Disclosure of Sold and Booked InventoryFile: Balaji Vista Disclosure of Sold and Booked Inventory Dec 2025.pdf | 23 Jan 2026 |
| Form 5 (FY 2024-2025)File: Form 5 FY 24-25 Balaji Vista.pdf | 14 Nov 2025 |
| Form 1File: FORM 1 Sept 2025.pdf | 8 Nov 2025 |
| Form 2File: BALAJI VISTA FORM 2 Sept 2025.pdf | 8 Nov 2025 |
| Form 3File: Form 3 Balaji Vista Sept 2025.pdf | 8 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloure of sold and booked Sept 2025.pdf | 8 Nov 2025 |
| Form 1File: FORM 1 June 2025.pdf | 5 Nov 2025 |
| Form 2File: FORM 2 June 2025.pdf | 5 Nov 2025 |
| Form 3File: Form 3 Balaji Vista June 2025.pdf | 5 Nov 2025 |
| Disclosure of Sold and Booked InventoryFile: Discloure of sold and booked June 2025.pdf | 5 Nov 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 3.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 4.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 5.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 6.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 7.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 8.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 9.pdf | 19 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 10.pdf | 19 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 3.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 4.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 5.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 6.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 7.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 8.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 9.pdf | 19 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 10.pdf | 19 May 2025 |
| Layout approvalFile: BLUE PRINT PAGE 1.pdf | 1 May 2025 |
| Layout approvalFile: BLUE PRINT PAGE 2.pdf | 1 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 1.pdf | 1 May 2025 |
| Building plan approvalFile: BLUE PRINT PAGE 2.pdf | 1 May 2025 |
| Copy of Layout Approval (in case of layout)File: BLUE PRINT PAGE 1.pdf | 1 May 2025 |
| Copy of Layout Approval (in case of layout)File: BLUE PRINT PAGE 2.pdf | 1 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 1.pdf | 1 May 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BLUE PRINT PAGE 2.pdf | 1 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 23 to March 23_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April 23 to June 23_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July 23 to Sept 23_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct 23 to Dec 23_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 24 to March 24_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 April 24 to June 24_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 July 24 to Sept 24_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Oct 24 to Dec 24_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Jan 25 to March 25_c.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Oct 22 to Dec 22.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - April 24 to June 24.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Jan 25 to March 25_c.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Oct 24 to Dec 24_c.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - July 24 to Sept 24.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan 24 to March 24.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan 24 to June 24.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - July 23 to Sept 23_c.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - April 23 to June 23.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan 23 to March 23.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Oct 22 to Dec 22_c.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - July 22 to Sept 22_c.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Oct 23 to Dec 23_c.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July 23 to Sept 23.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 25 to March 25_c.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct 24 to Dec 24_c.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July 24 to Sept 24_c.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April 24 to June 24_c.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 24 to March 24.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct 23 to Dec 23.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 April 23 to June 23.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Jan 23 to March 23.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Oct 22 to Dec 22.pdf | 30 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 July 22 to Sept 22.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked - Dec 2024.pdf | 30 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold-Booked - Mar 2025.pdf | 30 Apr 2025 |
| Declaration about Commencement CertificateFile: FORMATE -D.pdf | 30 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A-2024-25.pdf | 30 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BALAJIVISTAFORM131122024.pdf | 20 Feb 2025 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BALAJI SHRUSHTI | PLOT NO 7-B SECTOR 13 NAVI MUMBAI M. CORP. THANE 400706 | 51 | Completed | Dec 2021 | Jan 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 168 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BALAJI VISTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Navi Mumbai5,900+ in Raigarh
Filed coordinates, straight-line distance. 317 registered projects within 2 km.
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: VARSHA BUILDCON
VARSHA BUILDCON has 3 registrations on MahaRERA, including BALAJI SHRUSHTI and BALAJI VISTA. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if BALAJI VISTA is delayed beyond 31 May 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BALAJI VISTA?
The registered promoter entity is VARSHA BUILDCON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BALAJI VISTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BALAJI VISTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BALAJI VISTA?
The professionals named in the filing: Architect: SATISH V AHUJA AND ASSOCIATES; Engineer: RAMESH KURAJIBHAI BABARIA; Chartered Accountant: A K SARAWGI & COMPANY; Chartered Accountant: VIKAS KUMAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BALAJI VISTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback