Completed No litigation declared Residential / Group Housing project

Balaji Symphony phase 2

By Vinay Agrawal

RG-MH-11392 · RERA P52000000754 · Last updated on MahaRERA portal: 8 Jul 2021

Source: official MahaRERA filing

Red flags

  • 34 complaints at MahaRERA
  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2020Possession promisedregistration recorded completed
44 of 44Construction stages doneacross 4 buildings; every applicable stage filed complete
34Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

Balaji Symphony phase 2 is a Residential / Group Housing project by Vinay Agrawal in Raigarh, Maharashtra, registered with MahaRERA as P52000000754 on 23 Jul 2017. The registration is recorded completed; possession was promised by 30 Dec 2020. The completion date has moved by 12 months from the original filing. 34 complaints are on record with the regulator.

At a glance

Project

  • NameBalaji Symphony phase 2
  • TypeResidential / Group Housing
  • Location
    • PANVEL
    • Akurli
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000000754
  • ReraGenie IDRG-MH-11392

Builder

  • NameVinay Agrawal
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredJul 2017First promiseDec 2019Revised toDec 2020Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on23 Jul 2017
  • Promised completion30 Dec 2020
  • Revised completionRevised to 30 Dec 2020 (originally 31 Dec 2019)
  • Buildings4 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA360000
Wing FNA360000
Wing GNA350000
Wing HNA360000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 8 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

44 of 44 construction stages are filed complete across 4 buildings.

Wing A100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing F100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing G100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing H100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes95%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes95%
Landscaping & Tree PlantingYes10%
Street LightingYes90%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes95%
Solid Waste Management And DisposalYes95%
Water conservation /Rain water harvestingYes90%
Energy managemcntYes98%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes98%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
Wing A11
Wing F11
Wing G11
Wing H11

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area10,771 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI42439.15
Proposed, not sanctioned42,439 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNeel Avenue,Plot No-5 Sector-19,Panvel Matheran Road , New Panvel-410206

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastos pati
ArchitectSpace Age consultants
EngineerEpicons Consultants Pvt ltd
PartnerRole in project
Vinay Agrawal-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000005276Dec 2019 → Jun 2020

Reason as filed by the promoterThat initially the application for Occupation Certificate was to be made manually in the office of competent authority being CIDCO. Accordingly, the Promoter has filed a manual application dated 30.12.2019 before the competent authority for obtaining Occupation Certificate.

Complaints filed with MahaRERA34

Case no.ComplainantRespondentFiled
CC006000000056428Mr. I. V. SwaminathanMr. Vinay Shravankumar Agarwal03/10/2018
CC006000000194211DR SHIVAHAR VIJAY SONAWANEVinay Agrawal, Balaji Symphony07/10/2020
CC006000000057012Mukul Kumar ChailVinay Shravankumar Agrawal04/12/2018
CC006000000057913Surender SinghVinay Shravankumar Agrawal08/02/2019
CC006000000100214Noorjahan Bashir QureshiBalaji Symphony19/07/2019
CC006000000171784Noorjahan QureshiBalaji Symphony06/12/2019
CC006000000171751AMRITA CHAKRABORTY AND SOUMEN CHAKRABORTYM/S BALAJI SYMPHONY THROUGH PROPRIETOR MR. VINAY AGARWAL03/12/2019
CC006000000171931Samir Radhesham AgarwalM/s Balaji Symphony02/01/2020
CC006000000182073Rupesh ThakurVinay Shravankumar Agrawal04/01/2020
CC006000000193534GOKULDAS SHANKARANVinay Shravan Agrawal18/07/2020
CC006000000193712Dr. Vidyasindhu Anantrao Sejao & Dr. Aarti V. SejaoVinay Agarwal Sole Proprietor of M/s Balaji Symphony12/08/2020
CC006000000194045Shabana Kishan MalladiVinay Agarwal17/09/2020
CC006000000194670ZAMIR IBRAHIM KAZIBALAJI SYMPHONY THROUGH ITS PROPRIETOR VINAY S AGRAWAL06/11/2020
CC006000000195102Kedar DigheVinay Agarwal, Promoter Balaji Symphony Phase- II01/12/2020
CC006000000195566Balaji SymphonyNoorjahan Bashir Qureshi11/01/2021
CC006000000195567Balaji SymphonyShabana Kishan Malladi11/01/2021
CC006000000195568Balaji SymphonyJamir Ibrahim Kazi11/01/2021
CC006000000195569Balaji SymphonyPrakash Laxman Kudekar11/01/2021
CC006000000196435Vinay AgrawalNoorjahan Bashir Qureshi24/03/2021
CC006000000196437Vinay AgrawalShabana Kishan Malladi24/03/2021
CC006000000196438Vinay AgrawalAmrita Chakraborty24/03/2021
CC006000000196439Vinay AgrawalDr. Sejao Vidyasindhu Anantrao24/03/2021
CC006000000196440Vinay AgrawalGokuldas Shankaran24/03/2021
CC006000000196444Vinay AgrawalDr. Shivahar Vijay Sonawane24/03/2021
CC006000000196952Vinay AgrawalRakesh Trivedi27/05/2021
CC006000000209627Vinay AgrawalI.V. Swaminathan08/01/2022
CC006000000396061Vinod Agrawal1. Noorjahan Qureshi 2. Bashir M. Qureshi05/06/2023
CC006000000397321Vinod AgrawalManohar Udaykant Jha31/08/2023
CC006000000196067Mr. Manohar Udaykant JhaMr. Vinay Shravan Agrawal, proprietor of Balaji Symphony19/02/2021
CC006000000198233Suhas Dinkar VeerVinay Agarwal04/09/2021
CC006000000364724Mrugesh Babanrao PawarVinay Agrawal14/03/2023
CC006000000209367RAHUL ASHOK KALAMBEMr. Vinay K. Agarwal02/02/2022
CC006000000209825Dharampal GedamMr. Vinay K. Agarwal13/02/2022
CC006000000292301VISHAL SURESH KHANAVKARVinay Agarwal11/08/2022

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Aug 2020

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Club House - Completion Certificate.pdf8 Jul 2021
OtherFile: Completion Certificate - Podium Amenities.pdf8 Jul 2021
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - P II.pdf2 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BP-92_Part OC_letter_NIAMS.pdf5 Aug 2020
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: BP-92_Part OC_compressed.pdf5 Aug 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-WORK PROGRESS 30062020-1_.pdf30 Jun 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: RERA-WORK PROGRESS 30062020-1_.pdf30 Jun 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: phase 2 30-06-2020.pdf30 Jun 2020
Details of Restarting of Construction work post lockdownFile: Status of Project-Balaji Symphony.pdf30 Jun 2020
Certificates of CA (Form 3)File: Form3 - Phase II.pdf25 May 2020
Certificates of CA (Form 3)File: Annx - PII.pdf25 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1 - Phase II.pdf16 May 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - P II.pdf16 May 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Phase-2_compressed.pdf10 Feb 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-PII.pdf10 Feb 2020
Certificates of CA (Form 3)File: Form 3 PII.pdf10 Feb 2020
Certificates of CA (Form 3)File: Sch-PII.pdf10 Feb 2020
OtherFile: Virtually completion certificate Phase II_compressed.pdf30 Dec 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - P II.pdf19 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - P II.pdf19 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - P II.pdf19 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - P II.pdf19 Oct 2019
Certificates of CA (Form 3)File: Form 3 - P II.pdf19 Oct 2019
Certificates of CA (Form 3)File: Form 3 - P II - Annx.pdf19 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - PII.pdf10 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - PII.pdf10 Apr 2019
Certificates of CA (Form 3)File: Form3 - Phase II.pdf10 Apr 2019
Certificates of CA (Form 3)File: Sold Unsold - Phase II.pdf10 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - PII.pdf11 Feb 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - PII.pdf11 Feb 2019
Certificates of CA (Form 3)File: FORM 3 PII.pdf11 Feb 2019
Certificates of CA (Form 3)File: Form 3 - P II-F.pdf4 Dec 2018
Certificates of CA (Form 3)File: Form 3 - P III-F.pdf4 Dec 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - P II.pdf29 Nov 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - P II.pdf29 Nov 2018
Certificates of CA (Form 3)File: Form 3 - Phase II.pdf29 Nov 2018
Certificates of CA (Form 3)File: Sold Unsold - P II.pdf29 Nov 2018
Certificates of CA (Form 5)File: Form 5 Phase 2.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - P II.pdf31 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Consultant 2.pdf31 Aug 2018
Certificates of CA (Form 3)File: Phase 2 - 1.pdf22 Jun 2018
Certificates of CA (Form 3)File: Phase 2 - (3).pdf22 Jun 2018
Certificates of CA (Form 3)File: Phase 2 - (2).pdf22 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Phase 2.pdf4 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Phase II.pdf1 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Phase II.pdf1 Mar 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Phase II.pdf1 Mar 2018
Certificates of CA (Form 3)File: Form 3 - Phase II.pdf1 Mar 2018
Certificates of CA (Form 3)File: Sold Annexure - Phase II.pdf1 Mar 2018
Certificates of CA (Form 3)File: Unsold Annexure - Phase II.pdf1 Mar 2018
Layout approvalFile: LAYOUT PLAN.pdf21 Jul 2017
Building plan approvalFile: RERA PLAN.pdf21 Jul 2017
Copy of the legal title reportFile: Title certificates.pdf21 Jul 2017
Details of encumbrancesFile: Certificate for RERA-Phase -2.pdf21 Jul 2017
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf21 Jul 2017
Building Plan Approval (IOD)File: RERA PLAN.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC1.pdf21 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC2.pdf21 Jul 2017
Proforma of Allotment letterFile: Undertaking.pdf21 Jul 2017
Proforma of Allotment letterFile: AFS_BalajiSymphony_Phase_II_20_07_2017.pdf21 Jul 2017
OtherFile: Additional Declaration.pdf21 Jul 2017
OtherFile: Amenities.pdf21 Jul 2017
PAN CardFile: Vinay Agrawal pan.pdf20 Jul 2017
Declaration in FORM BFile: New Doc 2017-07-20 (1).pdf20 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AFGH Architect Certificate.pdf20 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: AFGH Engineer Certificate.pdf20 Jul 2017
Certificates of CA (Form 3)File: AFGH CA Certificate.pdf20 Jul 2017
Certificates of CA (Form 3)File: AFGH(SOLD).pdf20 Jul 2017
Certificates of CA (Form 3)File: AFGH(UNSOLD).pdf20 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Symphony phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

2 kmBalaji Symphony phase 2Completed 33Lapsed / revoked 13Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 85 registered projects within 2 km.

Builder: Vinay Agrawal

Vinay Agrawal has 4 registrations on MahaRERA, including Balaji Symphony and Balaji Symphony phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Balaji Symphony phase 2 is delayed beyond 30 Dec 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Symphony phase 2?

The registered promoter entity is Vinay Agrawal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Symphony phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Balaji Symphony phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Balaji Symphony phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Symphony phase 2?

The professionals named in the filing: Architect: Vastos pati; Architect: Space Age consultants; Engineer: Epicons Consultants Pvt ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Symphony phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Symphony phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Symphony phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.