Completed No litigation declared Residential / Group Housing project

Balaji Symphony

By Vinay Agrawal

RG-MH-10675 · RERA P52000001043 · Last updated on MahaRERA portal: 17 Jun 2021

Source: official MahaRERA filing

Red flags

  • 32 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2018Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
32Complaints at MahaRERAon this registration
Jump to the 33 documents Report an error

Balaji Symphony is a Residential / Group Housing project by Vinay Agrawal in Raigarh, Maharashtra, registered with MahaRERA as P52000001043 on 25 Jul 2017. The registration is recorded completed; possession was promised by 31 Dec 2018. 32 complaints are on record with the regulator.

At a glance

Project

  • NameBalaji Symphony
  • TypeResidential / Group Housing
  • Location
    • PANVEL
    • Shilottar Raichur
    • Raigarh
    • 410206
  • Pincode410206
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000001043
  • ReraGenie IDRG-MH-10675

Builder

  • NameVinay Agrawal
  • Entity typeIndividual
  • Other registrations3 more →
  • Completed2 of 4

Key dates

this monthRegisteredJul 2017PromisedDec 2018Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on25 Jul 2017
  • Promised completion31 Dec 2018
  • Revised completionNone
  • Buildings3 building records
  • Documents filed33 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing INA330000
Wing JNA330000
Wing KNA330000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jun 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

Wing I100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing J100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Wing K100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jun 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes98%
Water SupplyYes95%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes98%
Storm Water DrainsYes98%
Landscaping & Tree PlantingYes90%
Street LightingYes90%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes95%
Energy managemcntYes95%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed488

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots488
Closed/Covered488
BuildingClosed/CoveredTotal
Wing I163163
Wing J163163
Wing K162162

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area6,661 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI25908.0
Proposed, not sanctioned25,908 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSai prasad arcade plot no 2, sector 7 kamothe navi mumbai

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVastospati Architects
PartnerRole in project
Vinay Agrawal-

Complaints filed with MahaRERA32

Case no.ComplainantRespondentFiled
CC006000000056324HARISH BHOJA SHETTYVinay Agarwal25/09/2018
CC006000000012641Sanjay PandeyVinay S Agarwal22/01/2018
CC006000000023389Abhishek Vijay MokalVinay Agrawal19/02/2018
CC006000000023476BABJI MUNAGALAVINAY SHRAVANKUMAR AGARWAL13/05/2018
CC006000000023600M KRANTHI KUMARVINAY AGRAWAL05/03/2018
CC006000000023710Murugadass ganeswaranVINAY S AGARWAL18/03/2018
CC006000000044541Dr Satish Ganpati JagdaleMR VINAY SHRAVANKUMAR AGARWAL10/06/2018
CC006000000023868Pournima Sagar JuikarVinay Shravan Agrawal23/03/2018
CC006000000044409Pankaj SharmaVinay Agarwal11/05/2018
CC006000000044495Bimla Sandeep DevadigaVinay Shravankumar Agarwal12/05/2018
CC006000000044537Vinod Yashwant chavanVinay Agrawal17/05/2018
CC006000000054566Rajesh SharmaVinay Agrawal19/05/2018
CC006000000054579Majid Ayub DusteVinay Shravan Agrawal21/05/2018
CC006000000054881Vinay Shravankumar AgrawalRajesh Sharma12/06/2018
CC006000000055069Rahul BandekarVinay Shravankumar Agarwal23/06/2018
CC006000000056381ZAFAR ABBAS RIZVIVinay Agarwal29/09/2018
CC006000000056314MAHESH POPATRAO KAKADEVinay Agarwal24/09/2018
CC006000000056308Dilip Devidas ManeVinay Shravankumar Agrawal26/09/2018
CC006000000056312NITIN PARTEVinay Agarwal24/09/2018
CC006000000056349BALWANT JAGDISH SINGHVinay Agarwal26/09/2018
CC006000000056328BHUSHAN KASHINATH PAWASKARVinay Agarwal25/09/2018
CC006000000056352NALINI ASHOK TAMBEVinay Agarwal27/09/2018
CC006000000056359VINESH VIJAYANVinay Agarwal27/09/2018
CC006000000056384DIPIKA SUYOG PATILVinay Agarwal29/09/2018
CC006000000057331Ajay Shashinath DaveVinay Shravankumar Agrawal16/12/2018
CC006000000057040MARY MAURICE MATHEWSVinay Agarwal26/11/2018
CC006000000057566NAGESHNADKARNIVinay Agarwal06/01/2019
CC006000000057568SHIVKUMAR NADKARNIVinay Agarwal06/01/2019
CC006000000171649Rakesh Trivedivinay agarwal23/11/2019
CC006000000195115Mr Prakash Laxman Kudekar and Mrs Vaishali Laxman KudekarMr Vinay Agarwal through its proprietary concern M/s Balaji Symphony14/12/2020
CC006000000195154Amrut AnakalVinayAgarwal05/12/2020
CC006000000196888Ashok Kumar ChaurasiaMr Vinay Shravankumar Agrawal04/05/2021

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 14 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 22 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 14 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Aug 2020

Documents filed33

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
OtherFile: Completion Certificate - Podium Amenity.pdf17 Jun 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC-IJK only.pdf5 Aug 2020
OtherFile: Progress report - Club House.pdf19 Oct 2019
Certificates of Architect (Form 4)File: Form - Phase I.pdf11 Dec 2018
Certificates of CA (Form 5)File: Form 5 Phase 1.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - P I.pdf31 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers consultant 1.pdf31 Aug 2018
Certificates of CA (Form 3)File: Phase 1 - 1.pdf22 Jun 2018
Certificates of CA (Form 3)File: Phase 1 - 3.pdf22 Jun 2018
Certificates of CA (Form 3)File: Phase 1 - 2.pdf22 Jun 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Phase 1.pdf4 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Phase I.pdf1 Jun 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Phase I.pdf27 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Phase I.pdf27 Feb 2018
Certificates of CA (Form 3)File: Form 3 - Phase I.pdf27 Feb 2018
Certificates of CA (Form 3)File: Sold Annexure - Phase I.pdf27 Feb 2018
Certificates of CA (Form 3)File: Unsold Annexure - Phase I.pdf27 Feb 2018
Layout approvalFile: Final layout submission RERA.pdf22 Jul 2017
Building plan approvalFile: final rera IOD plan.pdf22 Jul 2017
Copy of Layout Approval (in case of layout)File: Final layout submission RERA.pdf22 Jul 2017
Building Plan Approval (IOD)File: final rera IOD plan.pdf22 Jul 2017
Certificates of CA (Form 3)File: IJK (SOLD).pdf19 Jul 2017
Certificates of CA (Form 3)File: IJK (UNSOLD).pdf19 Jul 2017
Proforma of Allotment letterFile: AFS_BalajiSymphony_PhaseI_19_07_2017.pdf19 Jul 2017
OtherFile: Additional Declaration.pdf19 Jul 2017
Declaration in FORM BFile: ilovepdf_jpg_to_pdf.pdf17 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - I J K.pdf15 Jul 2017
PAN CardFile: Vinay Agrawal pan.pdf14 Jul 2017
Copy of the legal title reportFile: Title certificates.pdf14 Jul 2017
Details of encumbrancesFile: Certificate.pdf14 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC2.pdf14 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form_1_-_I_J_K.pdf14 Jul 2017
Certificates of CA (Form 3)File: Form_3.pdf14 Jul 2017

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Symphony on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PANVEL5,900+ in Raigarh

2 kmBalaji SymphonyCompleted 33Lapsed / revoked 13Other 39Dot size: filed unitsN

Filed coordinates, straight-line distance. 85 registered projects within 2 km.

Builder: Vinay Agrawal

Vinay Agrawal has 4 registrations on MahaRERA, including Balaji Symphony and Balaji Symphony phase 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Balaji Symphony is delayed beyond 31 Dec 2018?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Symphony?

The registered promoter entity is Vinay Agrawal, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Symphony?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Balaji Symphony?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Balaji Symphony?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Symphony?

The professionals named in the filing: Architect: Vastospati Architects. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Symphony?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Symphony. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Symphony to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.