Home / Browse projects / Solapur, Maharashtra / BALAJI REGENCY

Completed No litigation declared Residential / Group Housing project

BALAJI REGENCY

By AAKRUTI BUILDERS AND DEVELOPERS

RG-MH-74774 · RERA P52600018861 · Last updated on MahaRERA portal: 8 Feb 2025

Source: official MahaRERA filing

Red flags

  • 1 complaint at MahaRERA
  • Completion date moved by 40 months
  • 2 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Solapur registration emailed to you, free during the pilot beta.
Mar 2025Possession promisedregistration recorded completed
18 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
1Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

BALAJI REGENCY is a Residential / Group Housing project by AAKRUTI BUILDERS AND DEVELOPERS in Solapur, Maharashtra, registered with MahaRERA as P52600018861 on 6 Dec 2018. The registration is recorded completed; possession was promised by 31 Mar 2025. The completion date has moved by 40 months from the original filing. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBALAJI REGENCY
  • TypeResidential / Group Housing
  • Location
    • AKKALKOT ROAD
    • BALAJI VILAS NAGAR
    • Solapur North
    • Solapur
    • 413005
  • Pincode413005
  • RERA no.P52600018861
  • ReraGenie IDRG-MH-74774

Builder

  • NameAAKRUTI BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersGURAPPA MALLIKARJUN KAPSE, JYOTI GURAPPA KAPSE, KASHINATH BHIMASHANKAR MAITRI

Key dates

this monthRegisteredDec 2018First promiseNov 2021Revised toMar 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on6 Dec 2018
  • Promised completion31 Mar 2025
  • Revised completionRevised to 31 Mar 2025 (originally 18 Nov 2021)
  • Buildings2 building records
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA100000
WING BNA100000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 8 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

18 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

WING A82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
WING B82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 8 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed14

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots14
Closed/Covered2
Open Space12
BuildingClosed/CoveredOpen SpaceTotal
WING A145
WING B189

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,139 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
AAKRUTI BUILDERS & DEVELOPERSSolapur (M Corp.)Solapur

Approvals and building plan

Permissible FSI1184.39
Proposed, not sanctioned1,183 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANNA CHOWK, SOLAPUR

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL SATYAPAL KHAMITKAR
EngineerSANJAY SHRIHARI JATHADE
EngineerBIPIN SWAMI
Chartered AccountantCA CHANDRAKANT INJAMURI
PartnerRole in project
AAKRUTI BUILDERS AND DEVELOPERS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52600010343Nov 2021 → Mar 2023

Reason as filed by the promoterDELAY DUE TO COVID-19 PANDEMIC

EXT52600018103Nov 2021 → Mar 2025

Reason as filed by the promoterDDDD

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12501370Balaji Kisan PawarAAKRUTI BUILDERS AND DEVELOPERS24/04/2025

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Oct 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Feb 2025

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_Architect Certificate-BALAJI A WING_compressed.pdf8 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1_Architect Certificate-BALAJI B WING_compressed.pdf8 Feb 2025
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ( A WING )_R2.pdf8 Feb 2025
Certificates of CA (Form 3)File: Form 3 (2)_compressed.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate(Akruti Builders)(1) (1).pdf8 Feb 2025
Form 2AFile: Quality Assurance Certificate(Akruti Builders)(1).pdf8 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FORM 4 ( B WING )_R2.pdf8 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: FULL OCCUPANCY.pdf8 Feb 2025
Disclosure of sold/ booked inventoryFile: Booking inventory.pdf8 Feb 2025
Other - TechnicalFile: FORM 4 ( B WING )_R2.pdf8 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Akruti Builders_Architect Certificate.pdf2 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aakruti Builders_Engineer Certificate Form-2 Annexure-B.pdf2 Aug 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Aakruti Builders_Engineer Certificate Form-2A Annexure-C_0001.pdf2 Aug 2024
Disclosure of sold/ booked inventoryFile: Aakruti Builders_Certificate of Sold_Unsold Inventory 1_compressed.pdf2 Aug 2024
Form 2AFile: Annexure c.pdf7 May 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT'S CERTIFICATE.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE.pdf20 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aakruti Form 1 upto Dec 2023_compressed.pdf29 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Aakruti Form 2 upto Dec 2023.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Aakruti Booking Details upto Dec 2023.pdf20 Jan 2024
Certificates of CA (Form 3)File: Aakruti Form 3 upto Dec 2023_compressed.pdf20 Jan 2024
Disclosure of sold/ booked inventoryFile: Format B.pdf9 Dec 2023
Disclosure of sold/ booked inventoryFile: CERTIFICATE OF RECENT.pdf9 Dec 2023
OtherFile: CERTIFICATE OF RECENT.pdf9 Dec 2023
Declaration in FORM BFile: Notary.pdf8 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aakruti_Architect Certificate_Wing-A.pdf8 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: updated architect RERA CERTIFICATE_A-WING_05-12-2023.pdf8 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: updated architect RERA CERTIFICATE_B-WING_05-12-2023.pdf8 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ENGINEER CER 2A.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 20-21.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22.pdf8 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf8 Dec 2023
OtherFile: Format B.pdf8 Dec 2023
Building plan approvalFile: BILDING PERMISHAN.pdf4 Dec 2023
Building Plan Approval (IOD)File: BILDING PERMISHAN.pdf4 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aakruti_Architect Certificate_Wing-A.pdf4 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Aakruti_Architect Certificate_Win-B.pdf4 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE.pdf4 Dec 2023
Form 2AFile: ENGINEER CER 2A.pdf4 Dec 2023
Certificates of CA (Form 3)File: CA Certificate Form 3_compressed.pdf4 Dec 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE FORM 1.pdf22 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE WING B.pdf22 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE FORM 2.pdf22 May 2023
Building plan approvalFile: BILDING PERMISHAN.pdf10 Dec 2022
Building Plan Approval (IOD)File: BILDING PERMISHAN.pdf10 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 ( 09-12-2022).pdf10 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate1 .pdf10 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ( 09-12-2022 ).pdf10 Dec 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM - 2A ( 09-12-2022 ).pdf10 Dec 2022
Building plan approvalFile: BILDING PERMISHAN.pdf7 Dec 2022
Building Plan Approval (IOD)File: BILDING PERMISHAN.pdf7 Dec 2022
Commencement Certificates / NA Order for plotted developmentFile: building permission.pdf7 Dec 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf7 Dec 2022
CERSAI detailsFile: Asset Based Search - 3.pdf5 Feb 2022
CERSAI detailsFile: Asset Based Search - 1.pdf27 Jan 2022
CERSAI detailsFile: Asset Based Search-compressed.pdf20 Jan 2022
OtherFile: 3 001.pdf28 Dec 2021
Disclosure of sold/ booked inventoryFile: FORMAT B_compressed.pdf6 Aug 2021
Declaration about Commencement CertificateFile: FORMAT D.pdf24 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE_compressed.pdf24 Jul 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINNERS CERTIFICATE_compressed.pdf24 Jul 2021
Form 2AFile: Kaagaz_20210723_173900934633-2-4.pdf24 Jul 2021
Disclosure of sold/ booked inventoryFile: SOLD BUILDING CERITIFICATE.pdf24 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM5 CA CERTIFICATE 18-19.pdf24 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5_compressed.pdf24 Jul 2021
Form 2AFile: 2A FORM ENGG.pdf19 Jun 2019
Copy of the legal title reportFile: Legal tital Report 01.pdf23 Nov 2018
Copy of the legal title reportFile: Legal tital Report 02.pdf23 Nov 2018
Details of encumbrancesFile: details of encumbracement on letterhead.pdf23 Nov 2018
Details of encumbrancesFile: 7 12 Utara.pdf23 Nov 2018
OtherFile: Purchase Deed 01.pdf23 Nov 2018
OtherFile: Purchase Deed 02.pdf23 Nov 2018
OtherFile: Purchase Deed 03.pdf23 Nov 2018
OtherFile: Purchase Deed 04.pdf23 Nov 2018
OtherFile: Purchase Deed 05.pdf23 Nov 2018
OtherFile: Purchase Deed 06.pdf23 Nov 2018
OtherFile: Purchase Deed 07.pdf23 Nov 2018
Certificates of CA (Form 3)File: FORM 3CERTIFICATE OF CA.pdf27 Oct 2018
Declaration in FORM BFile: AAKRUTI BULDERS295.pdf23 Oct 2018
Proforma of Allotment letterFile: Deed of Sale.pdf23 Oct 2018

How this compares with Solapur

15%of Solapur projects moved their completion datethis one moved by 40 months
39%of Solapur registrations have lapsed or been cancelledthis one is completed

Computed across the 550+ Solapur projects on ReraGenie, from their own filings.

Keep BALAJI REGENCY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BALAJI VILAS NAGAR550+ in Solapur

Builder: AAKRUTI BUILDERS AND DEVELOPERS

AAKRUTI BUILDERS AND DEVELOPERS has 1 registration on MahaRERA, including BALAJI REGENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Solapur district page.

Frequently asked questions

What are my rights if BALAJI REGENCY is delayed beyond 31 Mar 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BALAJI REGENCY?

The registered promoter entity is AAKRUTI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BALAJI REGENCY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BALAJI REGENCY?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BALAJI REGENCY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BALAJI REGENCY?

The professionals named in the filing: Architect: RAHUL SATYAPAL KHAMITKAR; Engineer: SANJAY SHRIHARI JATHADE; Engineer: BIPIN SWAMI; Chartered Accountant: CA CHANDRAKANT INJAMURI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BALAJI REGENCY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BALAJI REGENCY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BALAJI REGENCY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.