Home / Browse projects / Raigarh, Maharashtra / Balaji Palms Phase - 1

Completed No litigation declared Residential / Group Housing project

Balaji Palms Phase - 1

By Balaji Vishwakarma Associates

RG-MH-03066 · RERA P52000020435 · Last updated on MahaRERA portal: 12 Apr 2024

Source: official MahaRERA filing

Red flags

  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
33 of 33Construction stages doneacross 3 buildings; every applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

Balaji Palms Phase - 1 is a Residential / Group Housing project by Balaji Vishwakarma Associates in Raigarh, Maharashtra, registered with MahaRERA as P52000020435 on 10 Apr 2019. The registration is recorded completed; possession was promised by 30 Dec 2022.

At a glance

Project

  • NameBalaji Palms Phase - 1
  • TypeResidential / Group Housing
  • Location
    • Chendhre
    • Alibag
    • Raigarh
    • 402201
  • Pincode402201
  • RERA no.P52000020435
  • ReraGenie IDRG-MH-03066

Builder

  • NameBalaji Vishwakarma Associates
  • Entity typePartnership
  • Other registrations1 more →
  • Completed2 of 2

Key dates

this monthRegisteredApr 2019PromisedDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 Apr 2019
  • Promised completion30 Dec 2022
  • Revised completionNone
  • Buildings3 building records
  • Documents filed87 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
D WingNA60000
E WingNA60000
F WingNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 12 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

33 of 33 construction stages are filed complete across 3 buildings.

D Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
E Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
F Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 12 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed51

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots51
Closed/Covered32
Open Space19
BuildingClosed/CoveredOpen SpaceTotal
D Wing6915
E Wing10414
F Wing16622

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,338 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI2745.42
Proposed, not sanctioned2,745 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGreat Galaria Plot No 20 Sector 4 Nerul west Navi Mumbai 400706

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectERY Spaces Architects and Engineers
EngineerShri Samarth Agarwal
Chartered AccountantRutuja Narsingh & Associates
PartnerRole in project
Balaji Vishwakarma Associates-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000013944Dec 2022 → Dec 2023

Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 May 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 3 Apr 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 3 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Apr 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 14 Mar 2024

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase 1 31-03-2024.pdf12 Apr 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Balaji Palms P1 with declaration.pdf30 Mar 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC dated 11th March 2024.pdf14 Mar 2024
Certificates of CA (Form 3)File: Form 3 - Balaji Palms Phase 1 as on Dec 2023.pdf9 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Balaji Palms PH 1 as on Dec 2023.pdf4 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Balaji Palms as PH 1 on Dec 2023.pdf4 Jan 2024
Certificates of CA (Form 3)File: Form 3- Balaji Palms Phase 1 as on 30-09-2023.pdf18 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Phase I as on 2022-23.pdf12 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- Balaji Palms Phase 1 as on 29-09-2023.pdf7 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Balaji Palms Phase 1.pdf7 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1- PHASE - 1.pdf18 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Engineer Certificate BP- Phase I.pdf18 Jul 2023
Certificates of CA (Form 3)File: Form 3- Balaji Palms Phase 1 as on 30-06-2023.pdf18 Jul 2023
Disclosure of sold/ booked inventoryFile: Bajali Palms Phase I Mar 23 - Circular 29.pdf8 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Q4_BVA_Phase I_FY 22-23.pdf4 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Q4_BVA_Phase I_FY 22-23.pdf4 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Palms Phase I Sept 22 - Form 2.pdf3 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Balaji Palms Phase I Dec 22 - Form 2.pdf3 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2- Balaji Palms Phase 1 as on March 2023.pdf3 May 2023
Certificates of CA (Form 3)File: Form 3- Balaji Palms Phase 1 as on 30-09-2022.pdf3 May 2023
Certificates of CA (Form 3)File: Form 3- Balaji Palms Phase 1 as on 31-12-2022.pdf3 May 2023
Certificates of CA (Form 3)File: Form 3- Balaji Palms Phase 1 as on 31-03-2023.pdf3 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ARCHITECT'S CERTIFICATE FORM 4 AS PER NEW FORMAT (3).pdf30 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_Balaji Palms Phase 1_FY 20-21.pdf24 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5_FY 21-22_Balaji Palms Phase-I.pdf24 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Balaji Palms Phase 1 June 2022.pdf10 Sep 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Balaji Palms Phase 1 June 2022.pdf19 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Balaji Palms Phase 1 June 2022.pdf19 Jul 2022
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase 1 June 2022_compressed.pdf19 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Balaji Palms Phase-1 31-03-2022.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2-Balaji Palms Phase-1 31-03-2022_compressed.pdf8 Jul 2022
CERSAI detailsFile: Balaji Palms.pdf8 Jul 2022
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-1 31-03-2022_compressed (1).pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: Balaji Palms Phase 1 Sold Feb 2022.pdf14 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form-1_Q3_BVA_Phase-1_FY 21-22_compressed.pdf17 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2_Q3_BVA_Phase-1_FY 21-22.pdf17 Jan 2022
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-1 31-12-2021 compressed.pdf17 Jan 2022
Certificates of CA (Form 3)File: Revised Form 3 Balaji Palms Phase-1 sept 21.pdf17 Nov 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Q2 (1)_rotated_compressed.pdf2 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BALAJI PALMS PH-I Form 2 Q2.pdf2 Nov 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-1 Dec 2020.pdf24 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms Phase-1 Jun 2021.pdf13 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-1 Jun 2021.pdf13 Aug 2021
Disclosure of sold/ booked inventoryFile: Balaji Vishwakarma_compressed.pdf13 Aug 2021
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-1 Jun 2021.pdf13 Aug 2021
Declaration about Commencement CertificateFile: Balaji Palms Phase -I_compressed.pdf5 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ery Space RERA BVA March 21 form 1 (1).pdf8 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Signed Copy_Q4_March 2021_compressed.pdf8 Jul 2021
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-1 Mar 21 (1).pdf7 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - Balaji Palms Phase 1.pdf30 Jan 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Balaji Palms Phase-1.pdf30 Jan 2021
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase I Dec 2020.pdf30 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms Phase-1 June 2020.pdf3 Dec 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms Phase-1 Sept 2020_compressed.pdf3 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-1 Jun 2020_compressed.pdf3 Dec 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-1 Sept 2020_compressed.pdf3 Dec 2020
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase I June 2020_compressed.pdf3 Dec 2020
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase I Sept 2020_compressed.pdf3 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 FY 2019 -2020.pdf8 Oct 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BALJI PALMS EC 130320_compressed.pdf16 Sep 2020
Certificates of CA (Form 3)File: Revised Form 3 Balaji Palms Phase I compressed.pdf16 Sep 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BALJI PALMS EC 13012020_compressed.pdf21 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms.pdf14 Feb 2020
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-I.pdf8 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms Phase-I_compressed.pdf21 Dec 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-I.pdf21 Dec 2019
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-I_compressed.pdf21 Dec 2019
Proforma of Allotment letterFile: Rera Agreement.pdf18 Sep 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 Balaji Palms Phase-I-compressed.pdf24 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Balaji Palms Phase-I-compressed.pdf24 Jul 2019
Certificates of CA (Form 3)File: Form 3 Balaji Palms Phase-I.pdf24 Jul 2019
Copy of the legal title reportFile: TITLE CLEARANCE CERTIFICATE (ALIHAG)08019_0002_compressed.pdf7 May 2019
Building plan approvalFile: APPROVED PLAN-1-min.pdf3 Apr 2019
Building plan approvalFile: APPROVED PLAN-2-min.pdf3 Apr 2019
Layout approvalFile: APPROVED PLAN-1-min.pdf3 Apr 2019
Layout approvalFile: APPROVED PLAN-2-min.pdf3 Apr 2019
PAN CardFile: PANCARD - BALAJI VISHWAKARMA ASSOCIATES19019.pdf3 Apr 2019
Copy of the legal title reportFile: Title Certificate.pdf3 Apr 2019
Details of encumbrancesFile: balaji encumbrance.pdf3 Apr 2019
Copy of Layout Approval (in case of layout)File: APPROVED PLAN-1-min.pdf3 Apr 2019

How this compares with Raigarh

20%of Raigarh projects moved their completion datethis one has not
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Balaji Palms Phase - 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Alibag5,900+ in Raigarh

Builder: Balaji Vishwakarma Associates

Balaji Vishwakarma Associates has 2 registrations on MahaRERA, including Balaji Palms Phase - 1 and Balaji Palms Phase -II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if Balaji Palms Phase - 1 is delayed beyond 30 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Balaji Palms Phase - 1?

The registered promoter entity is Balaji Vishwakarma Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Balaji Palms Phase - 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Balaji Palms Phase - 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Balaji Palms Phase - 1?

The professionals named in the filing: Architect: ERY Spaces Architects and Engineers; Engineer: Shri Samarth Agarwal; Chartered Accountant: Rutuja Narsingh & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Balaji Palms Phase - 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Balaji Palms Phase - 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Balaji Palms Phase - 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.