Home / Browse projects / Raigarh, Maharashtra / Balaji Avvante - Building No. 11 and 12
Balaji Avvante - Building No. 11 and 12
RG-MH-80824 · RERA P52000047141 · Last updated on MahaRERA portal: 5 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 4 months past the filed date
- 2 complaints at MahaRERA
- Completion date moved by 6 months
- 1 extension taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Balaji Avvante - Building No. 11 and 12 is a Others project by Vishesh Greenscape LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000047141 on 10 Oct 2022. Possession was promised by 30 Jun 2026 and is now 4 months past that date. The completion date has moved by 6 months from the original filing. 110 of the 217 units on this registration are recorded sold or booked, and 14 of 22 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NameBalaji Avvante - Building No. 11 and 12
- TypeOthers
- Location
- Survey No -139/3 and 13 Others
- Vakadi
- Panvel
- Vakadi
- Panvel
- Raigarh
- 410206
- Pincode410206
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52000047141
- ReraGenie IDRG-MH-80824
Builder
- NameVishesh Greenscape LLP
- Entity typePartnership
- PartnersJayesh Rajnikant Mehta, Devendra Krishan Kedia, Vinay Shravankumar Agrawal, Sumeet Rajendraprasad Bhalotia
- Declared earlier projects1 →
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on10 Oct 2022
- Promised completion30 Jun 2026
- Revised completionRevised to 30 Jun 2026 (originally 31 Dec 2025)
- Buildings2 building records
- Documents filed64 files
Current status
Figures as on 5 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building No -11 Wing - A,B,C,D | NA | 5 | 5 | 100 | 8 | 108 |
| Building No -12 Wing - A,B,C,D | NA | 5 | 5 | 109 | 0 | 109 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 5 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
14 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 97%.
Building No -11 Wing - A,B,C,D90%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 97% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Building No -12 Wing - A,B,C,D78%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 87% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 90% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 5 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 10% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 10% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Parking filed76
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Building No -11 Wing - A,B,C,D | 29 | 29 |
| Building No -12 Wing - A,B,C,D | 47 | 47 |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building No -11 Wing - A,B,C,D | NA | Rs 11.26 cr | Rs 11.26 cr |
| Building No -12 Wing - A,B,C,D | NA | Rs 11.26 cr | Rs 11.26 cr |
| - | NA | Rs 45.97 lakh | Rs 45.97 lakh |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Vastospati |
| Engineer | SK Consultants & Engineers |
| Chartered Accountant | NB Sayed & Associates |
| Chartered Accountant | Pranav Bhaskaran & Associates |
| Partner | Role in project |
|---|---|
| Vishesh Greenscape LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWe are in the process of applying for the Occupancy Certificate (OC), however, there is likely to be a delay in receiving the necessary approval from the concerned authorities. In light of this, we kindly request an extension to allow sufficient time for the completion of all formalities and receipt of the OC.
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| SM12500149 | Bhakti Achrekar | Vishesh Greenscape LLP | 25/09/2025 |
| CC12603398 | Rabeek Ismail Syed | Vishesh Greenscape LLP | 03/06/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Sep 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 17 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed64
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: Form 5 Balaji Avvante - Building No 11 and 12 FY 2024-25.pdf | 5 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 - Balaji Avvante Building No 11 and 12 as March 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Balaji Avvante Building No 11 and 12 as March 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Balaji Avvante as on Sept 2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - Balaji Avvante Building No 11 and 12 as March 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Balaji Avvante as on Dec 2025.pdf | 17 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 - Balaji Avvante Building No 11 and 12 as March 2026.pdf | 17 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Balaji Avvante as on June 2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 1File: Form 1 - Balaji Avvante as on Sept 2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Balaji Avvante as on June 2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 2File: Form 2 - Balaji Avvante as on Sept 2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Balaji Avvante as on 30-06-2025.pdf | 6 Nov 2025 |
| Withdrawal Update Form 3File: Form 3 - Balaji Avvante as on Sept 2025.pdf | 6 Nov 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Balaji Avvante as on March 2025.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on 31-03-2025.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante as on March 2025.pdf | 17 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Balaji Avvante Building No 11 and 12 - FY 2023-24.pdf | 1 Mar 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on Dec 2024.pdf | 10 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante as on Dec 2024.pdf | 10 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Circular 29 - Balaji Avvante.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on Sept 2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante Sept 2024.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante as on June 2024.pdf | 12 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on June 2024.pdf | 12 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: CIRCULAR 29 - Balaji Avvante as on March 2024.pdf | 1 Jun 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante March 24.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on 31-03-2024.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante Dec 23.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on 31-12-2023.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Balaji Avvante as on 30-09-2023.pdf | 28 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Balaji Avvante as on 30-09-2023.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Balaji Avvante Building No 11 and 12 as on 2022-23.pdf | 30 Sep 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Balaji Avvante- Plinth Certificate.pdf | 17 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Balaji Avvante as on June 2023.pdf | 4 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Balaji Avvante as on 30-06-2023.pdf | 4 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Balaji Avvante as on March 2023.pdf | 1 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Balaji Avvante as on 31-03-2023.pdf | 1 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2- Balaji Avvante as on December 2022.pdf | 23 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3- Balaji Avvante as on December 2022.pdf | 23 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Balaji Avvante_compressed (1).pdf | 4 Mar 2023 |
| Proforma of Allotment letterFile: AFS-Balaji Avvante_28-09-2022.pdf | 28 Sep 2022 |
| Declaration in FORM BFile: Affidavit cum declaration_rotated (1).pdf | 24 Sep 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Balaji Avvante Form 3 RERA (2)_compressed.pdf | 24 Sep 2022 |
| Proforma of Allotment letterFile: Allotment Letter _ Balaji Avvate_05092022.pdf | 24 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 6 (2).pdf | 24 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - Balaji Avvante_compressed.pdf | 24 Sep 2022 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance Letter- Dues.pdf | 22 Sep 2022 |
| Details of encumbrances concerned to LegalFile: No Encumbrance Letter-Litigation.pdf | 22 Sep 2022 |
| Layout approvalFile: PLAN BALAJI Avvante_1-1_11zon.pdf | 15 Sep 2022 |
| Building plan approvalFile: PLAN BALAJI Avvante_2-4_11zon (2).pdf | 15 Sep 2022 |
| Building plan approvalFile: PLAN BALAJI Avvante_13-14_11zon.pdf | 15 Sep 2022 |
| Building plan approvalFile: PLAN BALAJI Avvante_15-16_11zon.pdf | 15 Sep 2022 |
| Building plan approvalFile: PLAN BALAJI Avvante_17-19_11zon.pdf | 15 Sep 2022 |
| PAN CardFile: 6 (2).pdf | 15 Sep 2022 |
| Copy of the legal title reportFile: 1 Copy of the legal title report (2).pdf | 15 Sep 2022 |
| Copy of Layout Approval (in case of layout)File: PLAN BALAJI Avvante_1-1_11zon.pdf | 15 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN BALAJI Avvante_2-4_11zon (2).pdf | 15 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN BALAJI Avvante_13-14_11zon.pdf | 15 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN BALAJI Avvante_15-16_11zon.pdf | 15 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN BALAJI Avvante_17-19_11zon.pdf | 15 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development (1).pdf | 15 Sep 2022 |
| Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf | 15 Sep 2022 |
| CERSAI detailsFile: CERSAI_Search_Report_200247233151_For_Asset_Based_Search_15_09_2022_17_04_21_072.pdf | 15 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: DEVIATION REPORT ALLOTMENT LETTER_0001.pdf | 15 Sep 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 64 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Balaji Avvante - Building No. 11 and 12 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Vakadi , Panvel5,900+ in Raigarh
SHREE RAM DELTA
Shreenathji Enterprises
Brillante
Callista Realty Limited
SAI SUNCITY PHASE 3
Chariot Properties LLP
ANANDAM PHASE - II
TODAY GLOBAL HOMES
Maximus Residency Phase-I
Superb Maa Developers LLP
Sai Vrindavan Dham
KT & LK SWEET HOMES
See every Raigarh project, with the district possession charts
Builder: Vishesh Greenscape LLP
Vishesh Greenscape LLP has 1 registration on MahaRERA, including Balaji Avvante - Building No. 11 and 12. Its filings disclose 1 earlier MahaRERA project, none completed yet. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What does it mean that Balaji Avvante - Building No. 11 and 12 shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Balaji Avvante - Building No. 11 and 12 is delayed beyond 30 Jun 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Balaji Avvante - Building No. 11 and 12?
The registered promoter entity is Vishesh Greenscape LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Balaji Avvante - Building No. 11 and 12?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Balaji Avvante - Building No. 11 and 12?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Balaji Avvante - Building No. 11 and 12?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Balaji Avvante - Building No. 11 and 12?
The professionals named in the filing: Architect: Vastospati; Engineer: SK Consultants & Engineers; Chartered Accountant: NB Sayed & Associates; Chartered Accountant: Pranav Bhaskaran & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Balaji Avvante - Building No. 11 and 12?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback