Home / Browse projects / Palghar, Maharashtra / BACHRAJ LIFESPACE

Completed No litigation declared Residential / Group Housing project

BACHRAJ LIFESPACE

By BACHRAJ DEVELOPERS

RG-MH-03102 · RERA P99000020455 · Last updated on MahaRERA portal: 21 Jul 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

BACHRAJ LIFESPACE is a Residential / Group Housing project by BACHRAJ DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000020455 on 11 Apr 2019. The registration is recorded completed; possession was promised by 1 Dec 2024.

At a glance

Project

  • NameBACHRAJ LIFESPACE
  • TypeResidential / Group Housing
  • Location
    • Y K NAGAR NX
    • NEAR BIG BAZAR
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401303
  • Pincode401303
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000020455
  • ReraGenie IDRG-MH-03102

Builder

  • NameBACHRAJ DEVELOPERS
  • Entity typeOthers
  • PartnersVIKAS DEVICHAND CHOPRA, ANIL DEVICHAND CHOPRA, KALPESH MOTILAL MEHTA, MOTILAL JUGRAJ MEHTA
  • PartnersVIKAS CHOPRA chopra, ANIL CHOPRA chopra, KALPESH MEHTA mehta, MOTILAL MEHTA mehta, BACHRAJ DEVELOPERS LLP chopra
  • Other registrations3 more →
  • Completed2 of 4
  • Declared earlier projects7 →

Key dates

this monthRegisteredApr 2019PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on11 Apr 2019
  • Promised completion1 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING A,B,C,DNA210000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 Jul 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

WING A,B,C,D: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 21 Jul 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed231

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots231
Closed/Covered231

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area9,180 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI21003.0
Proposed, not sanctioned21,003 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchATLANTA BUILDING,NARIMAN POINT, MUMBAI-400021

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectEN CON
EngineerSANJAY NARANG
Chartered AccountantLABHCHAND SINGHVI
PartnerRole in project
BACHRAJ DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Apr 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Dec 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Dec 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 25 Jan 2023

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Form 5 fy 22-23.pdf21 Jul 2023
Other - FinanceFile: Bachraj Lifespace -Form 5-22-23.pdf22 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: BACHRAJ LIFESPACE SOCIETY CERITIFICATE.pdf19 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECTS CERTIFICATE.pdf29 Mar 2023
Architect’s Certificate on Completion of Project (Form 4)File: FORM 4 ARCHITECTS CERTIFICATE.pdf2 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC.pdf25 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect form 1 dec 22.pdf11 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer form 2 dec 22.pdf11 Jan 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: form 2a MARCH 22.pdf22 Dec 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 FY 21-22.pdf22 Dec 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1 SEPT 22.pdf13 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2 SEPT 22.pdf13 Oct 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: society registration certificate.pdf30 Aug 2022
Certificates of CA (Form 3)File: CA fORM 3 june 22.pdf12 Jul 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT FORM 1 JUNE 22.pdf8 Jul 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER FORM 2 JUNE 22.pdf8 Jul 2022
Disclosure of sold/ booked inventoryFile: sold and unsold june22.pdf8 Jul 2022
OtherFile: form 5 FY 21-22.pdf30 May 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Form 01 march 22.pdf15 Apr 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer Form 02 march 22.pdf15 Apr 2022
Disclosure of sold/ booked inventoryFile: sold unsold list march 22.pdf1 Apr 2022
OtherFile: form 2a quarter ending march 22.pdf1 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1 Architect certificate.pdf14 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Engineer Certificate.pdf8 Jan 2022
Disclosure of sold/ booked inventoryFile: sold units dec 2021.pdf29 Dec 2021
OtherFile: FORM-2A oct to dec 21.pdf28 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate.pdf4 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2.pdf4 Oct 2021
OtherFile: Form 2-A september 2021.pdf29 Sep 2021
Disclosure of sold/ booked inventoryFile: Disclosure Of Sold.pdf28 Sep 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect form 1 June 21.pdf4 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer form 2 June 21.pdf4 Aug 2021
Certificates of CA (Form 3)File: CA Form 3 april 21 to june 21.pdf30 Jul 2021
OtherFile: form 2A jun21.pdf30 Jul 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Form 5 FY 20-21.pdf8 Jun 2021
Disclosure of sold/ booked inventoryFile: DISCOLSURE OF SOLD BOOKED INVENTORY-compressed.pdf7 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quarter ending March 21quarter ending March 21.pdf5 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A quarter ending March 21quarter ending March 21.pdf5 May 2021
OtherFile: Form 2A quarter ending March 21quarter ending March 21.pdf2 Apr 2021
Details of encumbrancesFile: MORTGAGE.pdf11 Mar 2021
Details of encumbrancesFile: BAJAJ FINANCE.pdf11 Mar 2021
Proforma of Allotment letterFile: DRAFT AGREMENT AFTER TDR.pdf11 Mar 2021
OtherFile: FORM 2A OCT TO DEC 2020.pdf5 Jan 2021
Layout approvalFile: LAYOUT.pdf19 Dec 2020
Layout approvalFile: CFC PLAN.pdf19 Dec 2020
Layout approvalFile: A WING - 2 - 1.pdf19 Dec 2020
Layout approvalFile: B WING - 3 - 1.pdf19 Dec 2020
Layout approvalFile: C WING - 4 - 1.pdf19 Dec 2020
Layout approvalFile: D WING - 5 - 1.pdf19 Dec 2020
Building plan approvalFile: FINAL CC 2020 LIFESPACE.pdf19 Dec 2020
Layout approvalFile: FINAL CC 2020 LIFESPACE.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: FINAL CC 2020 LIFESPACE.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: CFC PLAN.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: A WING - 2 - 1.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: B WING - 3 - 1.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: C WING - 4 - 1.pdf19 Dec 2020
Copy of Layout Approval (in case of layout)File: D WING - 5 - 1.pdf19 Dec 2020
Building Plan Approval (IOD)File: FINAL CC 2020 LIFESPACE.pdf19 Dec 2020
Commencement Certificates / NA Order for plotted developmentFile: FINAL CC 2020 LIFESPACE.pdf19 Dec 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: RERA_FORM_5_ financial year 19-20.pdf1 Oct 2020
OtherFile: 0010_201001095250_001.pdf1 Oct 2020
OtherFile: 0010_201001095250_001.pdf1 Oct 2020
OtherFile: RERA 2A FORM_compressed.pdf2 Jul 2020
OtherFile: RERA_FORM_5_ financial year 19-20.pdf20 Jun 2020
Details of Restarting of Construction work post lockdownFile: construction status.pdf16 Jun 2020
Certificates of CA (Form 3)File: Rera Certificate-compressed.pdf30 Apr 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A qaurter ending March 2020.pdf2 Apr 2020
Certificates of CA (Form 3)File: CA Form 3 for quarter ending December 2019.pdf8 Jan 2020
PAN CardFile: Bachraj Pan Card.pdf4 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: June-2019 Form 2A.pdf4 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Sep-2019 From 2A.pdf4 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Dec-2019 Form 2A.pdf4 Jan 2020
Certificates of CA (Form 3)File: CA Form 3 October 2019.pdf16 Oct 2019
Certificates of CA (Form 3)File: form 3 - JULY 2019.pdf5 Aug 2019
Proforma of Allotment letterFile: lifespace SALE agreement.pdf5 Aug 2019
Certificates of CA (Form 3)File: CA Form 3.pdf9 Apr 2019
Building plan approvalFile: cc-1 (1).pdf8 Apr 2019
Building plan approvalFile: cc-2.pdf8 Apr 2019
Details of encumbrancesFile: no encumberance declaration.pdf8 Apr 2019

Promoter's earlier projects7

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise1 delivered late2 under way, not due yet
ProjectLocationFlatsStatusPromisedDelivered
BACHRAJ LEGEND WING Dp99000051803PLOT B / 24 B/3, B/4, OLD VIVA COLLEGE CROSS ROAD, VIRAR WEST, OPP SWAMI SAMARTH COMLEX,NEAR PENINSULA PARK, Vasai-Virar City (M Corp), Vasai, Palghar, 401303, MAHARASHTRA-Certificate SignedDec 2027Not due yet
BACHRAJ LEGEND WING ABCp99000051433OLD VIVA COLLEGE CROSS ROAD,VIRAR WEST376OngoingDec 2027Not due yet
BACHRAJ LIFESPACEY K NAGAR NX . VIRAR WEST527CompletedDec 2023Jan 2023
BACHRAJ LANDMARKAVENUE L-3 GLOBAL CITY VIRAR WEST602CompletedDec 2018Dec 2018
BACHRAJ RESIDENCYDONGRE NEXT TO RUSTOMJEE INT SCHOOL VIRAR WEST154CompletedDec 2015Oct 2015
BACHRAJ PARADISEAVENUE A-3B GLOBAL CITY VIRAR WEST135CompletedAug 2014Jul 2014
BACHRAJ AVENUESECTOR 5 PADMAVATI NAGAR BOLINJ VIRAR WEST70CompletedDec 2012Late, Mar 2013

How this compares with Palghar

31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BACHRAJ LIFESPACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NEAR BIG BAZAR3,200+ in Palghar

2 kmBACHRAJ LIFESPACECompleted 20Lapsed / revoked 16Other 10Dot size: filed unitsN

Filed coordinates, straight-line distance. 46 registered projects within 2 km.

Builder: BACHRAJ DEVELOPERS

BACHRAJ DEVELOPERS has 4 registrations on MahaRERA, including BACHRAJ LANDMARK and BACHRAJ LIFESPACE. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if BACHRAJ LIFESPACE is delayed beyond 1 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BACHRAJ LIFESPACE?

The registered promoter entity is BACHRAJ DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BACHRAJ LIFESPACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BACHRAJ LIFESPACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BACHRAJ LIFESPACE?

The professionals named in the filing: Architect: EN CON; Engineer: SANJAY NARANG; Chartered Accountant: LABHCHAND SINGHVI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BACHRAJ LIFESPACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BACHRAJ LIFESPACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BACHRAJ LIFESPACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.