BACHRAJ LEGEND WING ABC
RG-MH-05532 · RERA P99000051433 · Last updated on MahaRERA portal: 6 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 45.00 crore secured on the land, in favour of Bajaj Housing Finance Limited
- The declared charge does not appear in the CERSAI report on the filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
BACHRAJ LEGEND WING ABC is a Residential / Group Housing project by BACHRAJ DEVELOPERS in Palghar, Maharashtra, registered with MahaRERA as P99000051433 on 14 Jun 2023. Possession is promised by 1 Dec 2027. 266 of the 376 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.
At a glance
Project
- NameBACHRAJ LEGEND WING ABC
- TypeResidential / Group Housing
- Location
- OLD VIVA COLLEGE CROSS ROAD
- VIRAR WEST
- OPP SWAMI SAMARTH COMPLEX
- NEAR PENINSULA PARK
- Vasai-Virar City (M Corp)
- Vasai
- Palghar
- 401303
- Pincode401303
- MapView location on Google Maps (as filed on RERA)
- RERA no.P99000051433
- ReraGenie IDRG-MH-05532
Builder
- NameBACHRAJ DEVELOPERS
- Entity typeOthers
- PartnersVIKAS DEVICHAND CHOPRA, ANIL DEVICHAND CHOPRA, KALPESH MOTILAL MEHTA, MOTILAL JUGRAJ MEHTA
- PartnersVIKAS CHOPRA chopra, ANIL CHOPRA chopra, KALPESH MEHTA mehta, MOTILAL MEHTA mehta, BACHRAJ DEVELOPERS LLP chopra
- Other registrations3 more →
- Completed2 of 4
- Declared earlier projects7 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Jun 2023
- Promised completion1 Dec 2027
- Revised completionNone
- Buildings3 building records
- Documents filed130 files
Current status
Figures as on 6 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 21 | 19 | 142 | 0 | 142 |
| WING B | NA | 22 | 20 | 117 | 0 | 117 |
| WING C | NA | 22 | 20 | 117 | 0 | 117 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 6 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 95%.
WING A95%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 85% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING B96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
WING C96%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 80% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 6 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 70% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 60% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 90% |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 70% |
| Open Parking | No | Not applicable |
Parking filed158
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| WING A | 61 | 61 |
| WING B | 49 | 49 |
| WING C | 48 | 48 |
Land and ownership1
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| DATTAKRUPA DEVELOPERS | Vasai-Virar City (M Corp) | Palghar |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 23.50 cr | Rs 22.03 cr |
| WING B | NA | Rs 23.50 cr | Rs 22.03 cr |
| WING C | NA | Rs 23.50 cr | Rs 22.03 cr |
| - | NA | Rs 5.00 cr | Rs 3.00 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SAMEER R DESAI |
| Engineer | APTE ASSOCIATES |
| Engineer | pankaj kamothi |
| Chartered Accountant | Rank & Associates |
| Chartered Accountant | Himanshu Jain |
| Chartered Accountant | Labhchand Singhvi |
| Partner | Role in project |
|---|---|
| BACHRAJ DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 May 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 30 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 30 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 30 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 1 Dec 2027
Documents filed130
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 130 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2025-2026)File: FORM 5 ABC WING 25-26.pdf | 6 May 2026 |
| Form 2A (FY 2025-2026)File: form 2A ABC.pdf | 23 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 wing aabc mar 26.pdf | 15 Apr 2026 |
| Withdrawal Update Form 2File: FORM-02 ABC ENGINEER CERTIFICATE NO -12.pdf | 15 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 ABC wing .pdf | 15 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1 ABC WING dec 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER WING ABC dec 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC DEC 25.pdf | 13 Jan 2026 |
| Withdrawal Update Form 1File: FORM 1 WING ABC_compressed.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 WING ABC_compressed.pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: APTE FORM 2 WING ABC_compressed (1).pdf | 13 Oct 2025 |
| Withdrawal Update Form 2File: APTE FORM 2 WING ABC_compressed (1).pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC SEPT 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC SEPT 25.pdf | 13 Oct 2025 |
| Withdrawal Update Form 1File: FORM 1 D WING JUNE 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 D WING JUNE 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER WING ABC june 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER WING ABC june 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC JUNE 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC JUNE 25.pdf | 17 Sep 2025 |
| Withdrawal Update Form 1File: FORM 1 D WING JUNE 25.pdf | 16 Jul 2025 |
| Withdrawal Update Form 1File: FORM 1 D WING JUNE 25.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER WING ABC june 25.pdf | 16 Jul 2025 |
| Withdrawal Update Form 2File: FORM 2 ENGINEER WING ABC june 25.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING D JUNE 25.pdf | 16 Jul 2025 |
| Withdrawal Update Form 3File: CA FORM 3 WING ABC JUNE 25.pdf | 16 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Engineer Certificate Wing ABC.pdf | 29 May 2025 |
| Form 5 (FY 2024-2025)File: form 5 abc.pdf | 29 May 2025 |
| Form 1File: FORM 1 ABC WING MAR 25.pdf | 27 May 2025 |
| Form 2File: FORM 2 ENGINEER WING ABC MAR 25.pdf | 27 May 2025 |
| Form 3File: CA FORM 3 WING ABC MARCH 25.pdf | 27 May 2025 |
| Disclosure of Sold and Booked InventoryFile: disclosure SOLD -UNSOLD WING ABC MARCH 25.pdf | 27 May 2025 |
| Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD WING ABC MARCH -25.pdf | 30 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Wing ABC.pdf | 26 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate no -2 ABC.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sameer desai Architect ABC_compressed.pdf | 8 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 WING ABC DEC 24.pdf | 15 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABC WING DEC 24.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER WING ABC DEC 24.pdf | 3 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER WING D SEPT 24.pdf | 22 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABC WING SEPT 24.pdf | 17 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 WING ABC SEPT 24.pdf | 17 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Wing ABC March 24.pdf | 20 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 WING ABC JUNE 24.pdf | 17 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABC WING JUNE 24.pdf | 11 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A ABC WING MARCH 24.pdf | 11 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER wing ABC june 24.pdf | 6 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of Sold Wing ABC_compressed.pdf | 5 Jul 2024 |
| Layout approvalFile: 2 Layout - Highlighted_FSI bifurcation.pdf | 30 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Layout - Highlighted_FSI bifurcation.pdf | 30 Apr 2024 |
| Other - LegalFile: CC Verified_Bachraj ABC_mail sent Confirmation image.pdf | 29 Apr 2024 |
| Other - TechnicalFile: CC Verified_Bachraj ABC_mail sent Confirmation image.pdf | 29 Apr 2024 |
| Layout approvalFile: 2 Layout - Highlighted_FSI bifurcation.pdf | 27 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Layout - Highlighted_FSI bifurcation.pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 revised ABC CERTIFICATE_compressed (1).pdf | 27 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ABC FORM 3.pdf | 13 Apr 2024 |
| Layout approvalFile: 2 Layout - Highlighted.pdf | 12 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Layout - Highlighted.pdf | 12 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form 2A ABC WING MARCH 24.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA FORM 3 WING ABC MARCH 24.pdf | 11 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ABC WING MARCH 24.pdf | 9 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure SOLD -UNSOLD WING ABC MARCH 24.pdf | 9 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER wing ABC March 24.pdf | 8 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 ENGINEER wing ABC March 24.pdf | 8 Apr 2024 |
| Layout approvalFile: 2 Layout.PDF | 30 Jan 2024 |
| Layout approvalFile: 3 Podium Floor Plan.PDF | 30 Jan 2024 |
| Layout approvalFile: 4 Wing A combined.pdf | 30 Jan 2024 |
| Layout approvalFile: 5 Wing B combined.pdf | 30 Jan 2024 |
| Layout approvalFile: 6 Wing C combined.pdf | 30 Jan 2024 |
| Layout approvalFile: 7 Section and Elevation.PDF | 30 Jan 2024 |
| Building plan approvalFile: REVISED ASS ORDER.pdf | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 2 Layout.PDF | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 3 Podium Floor Plan.PDF | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 4 Wing A combined.pdf | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 5 Wing B combined.pdf | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 6 Wing C combined.pdf | 30 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: 7 Section and Elevation.PDF | 30 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: REVISED ASS ORDER.pdf | 30 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 CC-REVISED DEVELOPEMENT PERMISSION_compressed (2).pdf | 30 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration about CC_Bachraj ABC.pdf | 30 Jan 2024 |
Promoter's earlier projects7
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| BACHRAJ LEGEND WING Dp99000051803 | PLOT B / 24 B/3, B/4, OLD VIVA COLLEGE CROSS ROAD, VIRAR WEST, OPP SWAMI SAMARTH COMLEX,NEAR PENINSULA PARK, Vasai-Virar City (M Corp), Vasai, Palghar, 401303, MAHARASHTRA | - | Certificate Signed | Dec 2027 | Not due yet |
| BACHRAJ LEGEND WING ABCp99000051433 | OLD VIVA COLLEGE CROSS ROAD,VIRAR WEST | 376 | Ongoing | Dec 2027 | Not due yet |
| BACHRAJ LIFESPACE | Y K NAGAR NX . VIRAR WEST | 527 | Completed | Dec 2023 | Jan 2023 |
| BACHRAJ LANDMARK | AVENUE L-3 GLOBAL CITY VIRAR WEST | 602 | Completed | Dec 2018 | Dec 2018 |
| BACHRAJ RESIDENCY | DONGRE NEXT TO RUSTOMJEE INT SCHOOL VIRAR WEST | 154 | Completed | Dec 2015 | Oct 2015 |
| BACHRAJ PARADISE | AVENUE A-3B GLOBAL CITY VIRAR WEST | 135 | Completed | Aug 2014 | Jul 2014 |
| BACHRAJ AVENUE | SECTOR 5 PADMAVATI NAGAR BOLINJ VIRAR WEST | 70 | Completed | Dec 2012 | Late, Mar 2013 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Palghar
Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.
Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 130 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep BACHRAJ LEGEND WING ABC on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP SWAMI SAMARTH COMPLEX,NEAR PENINSULA PARK3,200+ in Palghar
Filed coordinates, straight-line distance. 316 registered projects within 2 km.
Mayfair Virar Gardens Cluster-VI
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS CLUSTER IV
MAYFAIR HOUSING
MAYFAIR VIRAR GARDENS BUILDING NO 17, 18, 19,
MAYFAIR HOUSING
Agarwal Infinity
Laxminarayan Prabhudayal Agarwal
GOKUL HARI ANANTA
Mehta Ventures
GOKUL NAKSHATRA II
JSB HOMEMAKERS PRIVATE LIMITED
See every Palghar project, with the district possession charts
Builder: BACHRAJ DEVELOPERS
BACHRAJ DEVELOPERS has 4 registrations on MahaRERA, including BACHRAJ LANDMARK and BACHRAJ LIFESPACE. Its filings disclose 7 earlier MahaRERA projects: declares 4 of 5 past projects completed on time. Read the full track record. See more projects on the Palghar district page.
Frequently asked questions
What are my rights if BACHRAJ LEGEND WING ABC is delayed beyond 1 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of BACHRAJ LEGEND WING ABC?
The registered promoter entity is BACHRAJ DEVELOPERS, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in BACHRAJ LEGEND WING ABC?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for BACHRAJ LEGEND WING ABC?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at BACHRAJ LEGEND WING ABC?
The professionals named in the filing: Architect: SAMEER R DESAI; Engineer: APTE ASSOCIATES; Engineer: pankaj kamothi; Chartered Accountant: Rank & Associates; Chartered Accountant: Himanshu Jain; Chartered Accountant: Labhchand Singhvi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BACHRAJ LEGEND WING ABC?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback