B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS
RG-MH-64037 · RERA P50500051862 · Last updated on MahaRERA portal: 16 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS is a Plotted project by Ishwar Kawduji Mahakalkar in Nagpur, Maharashtra, registered with MahaRERA as P50500051862 on 7 Jul 2023. Possession is promised by 31 Dec 2027. 23 of the 54 units on this registration are recorded sold or booked.
At a glance
Project
- NameB K MAHAKALKAR LAND DEVELOPERS AND BUILDERS
- TypePlotted
- Location
- Kamptee Road
- Bhilgaon
- Kamptee
- Nagpur
- 441002
- Pincode441002
- RERA no.P50500051862
- ReraGenie IDRG-MH-64037
Builder
- NameIshwar Kawduji Mahakalkar
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Jul 2023
- Promised completion31 Dec 2027
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed80 files
Current status
Figures as on 16 Jul 2026, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities15
As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 90% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 90% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| ARUN KAWDUJI MAHAKALKAR | Bhilgaon | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| - | NA | Rs 2.10 cr | Rs 1.75 cr |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Shekhar Vibhute |
| Engineer | RAMDAS V WAGH |
| Chartered Accountant | A S MUNDADA & CO. |
| Partner | Role in project |
|---|---|
| Ishwar Kawduji Mahakalkar | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 20 Jun 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jun 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: MAHAKALKAR FORM-1 JUNE-26.pdf | 16 Jul 2026 |
| Withdrawal Update Form 2File: MAHAKALKAR FORM-2 JUNE-26.pdf | 16 Jul 2026 |
| Withdrawal Update Form 3File: MAHAKALKAR FORM-3 JUNE-26_compressed.pdf | 16 Jul 2026 |
| Withdrawal Update Form 1File: FORM-1 MAR-26 MAHAKALKAR.pdf | 19 Apr 2026 |
| Withdrawal Update Form 2File: FORM-2 MAR-26 MAHAKALKAR.pdf | 19 Apr 2026 |
| Withdrawal Update Form 3File: FORM-3 MAR-26 MAHAKALKAR_compressed.pdf | 19 Apr 2026 |
| Withdrawal Update Form 1File: Arch Cert Mar24mahakalkar.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM - 1 JUNE 2025.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 1File: FORM-1 MAHAKALKAR DEC-25.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: Eng Cert Mar24 Mahakalkar.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE MAHAKALKAR JUN2025.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 2File: FORM-2 MAHAKALKAR DEC-25.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Mar24 Mahakalkar_compressed.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: Form 3 Mar24 Mahakalkar_compressed.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: FORM-3 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: FORM-3 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: FORM-3 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: FORM-3 SEPT25 MAHAKALKAR.pdf | 26 Mar 2026 |
| Withdrawal Update Form 3File: FORM-3 MAHAKALKAR DEC-25.pdf | 26 Mar 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 june 25.pdf | 10 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 MAHAKALKAR JUN 2025_compressed.pdf | 10 Jul 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE MAHAKALKAR JUN2025.pdf | 10 Jul 2025 |
| Disclosure of sold/ booked inventoryFile: soLDBooKED INVENTORY JUN 2025.pdf | 10 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: MAHAKALKAR MAR25 FORM-1.pdf | 23 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mar25 form-3 mahakalkar_compressed.pdf | 23 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: mar25 form-2 mahakalkar.pdf | 23 May 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: mar25 form-2A mahakalkar.pdf | 23 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: mahakalkar form 1.pdf | 23 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: mahakalkar form3 dec24.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahakal kal form 2 December 24.pdf | 23 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Mahakal kal form 2 December 24.pdf | 23 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: sold and sold inventory mahakalkar dec24.pdf | 23 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: sept24 from 1 mahakalkar.pdf | 7 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: sept24 from3 mahakalkar.pdf | 7 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: sept24 from2 mahakalkar.pdf | 7 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FOrm 1 mahakalkar june 24.pdf | 8 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 mahakalkar june 24_compressed.pdf | 8 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: fORM 2 MAHAKALKAR JUNE24.pdf | 8 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Dec 2023.pdf | 25 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch Cert Mar24mahakalkar.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Cert dec 2023.pdf | 25 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Cert Mar24 Mahakalkar.pdf | 25 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Eng Cert Mahakalkar.pdf | 25 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec23 Mahakalkar_compressed.pdf | 25 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar24 Mahakalkar_compressed.pdf | 25 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form - 1 arc cer 30-9-23.pdf | 19 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Kaagaz_20231019_135113253240.pdf | 19 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: sold booked inventory 12-10-23 (1).pdf | 19 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: A S mundada mahakalkr 12OCT23.pdf | 19 Oct 2023 |
| Details of encumbrances concerned to FinanceFile: MX-M315NV_20230627_192223.pdf | 27 Jun 2023 |
| Details of encumbrances concerned to LegalFile: MX-M315NV_20230627_192223.pdf | 27 Jun 2023 |
| Building plan approval or NA orderFile: MAP_compressed.pdf | 20 Jun 2023 |
| Building plan approval or NA orderFile: NA Order 27Jan23.pdf | 20 Jun 2023 |
| Copy of the legal title reportFile: Legal Title Report.pdf | 20 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP_compressed.pdf | 20 Jun 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: NA Order 27Jan23.pdf | 20 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Cert mahakalkar.pdf | 20 Jun 2023 |
| Proforma of Allotment letterFile: annexure 1 model form of allotment letter.pdf | 20 Jun 2023 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Certificate(2).pdf | 19 Jun 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance Certificate(2).pdf | 19 Jun 2023 |
| Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf | 19 Jun 2023 |
| Declaration in FORM BFile: form B.pdf | 19 Jun 2023 |
| CERSAI detailsFile: CERSAI SR MAHAKALKAR.pdf | 19 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: disclosure of interest in other real estate organization.pdf | 19 Jun 2023 |
| Proforma of Agreement for saleFile: Agreement to Sale Proforma.pdf | 19 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A declaration about seprate bank account for real estate project.pdf | 19 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: deviation report with respect to allotment letter.pdf | 19 Jun 2023 |
| Deviation Report with respect to model copy of AgreementFile: deviation report model copy of agreement.pdf | 19 Jun 2023 |
| PAN CardFile: pan.pdf | 31 Mar 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: NMRDA_compressed (1).pdf | 21 Mar 2023 |
| Layout approvalFile: layout map.pdf | 20 Mar 2023 |
| Copy of Layout Approval (in case of layout)File: layout map.pdf | 20 Mar 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bhilgaon2,800+ in Nagpur
KESAR GATEWAY
KESAR GATEWAY PVT LTD
ORANGE CITY HEIGHTS
SANJAY GANPATRAO PATIL
HBA PARK
HBA CONSTRUCTION COMPANY PVT.LTD
JAY AMBE NAGAR
RAMESHWAR SUGHANCHAND BAWANKAR
Green Town
M/s Green Town Developers
ARMORS ESTATE
ARMORS DEVELOPERS PRIVATE LIMITED
See every Nagpur project, with the district possession charts
Builder: Ishwar Kawduji Mahakalkar
Ishwar Kawduji Mahakalkar has 1 registration on MahaRERA, including B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS?
The registered promoter entity is Ishwar Kawduji Mahakalkar, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS?
The professionals named in the filing: Architect: Shekhar Vibhute; Engineer: RAMDAS V WAGH; Chartered Accountant: A S MUNDADA & CO.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in B K MAHAKALKAR LAND DEVELOPERS AND BUILDERS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback