Home / Browse projects / Nagpur, Maharashtra / ARMORS ESTATE

Registration lapsed No litigation declared Plotted project

ARMORS ESTATE

By ARMORS DEVELOPERS PRIVATE LIMITED

RG-MH-38815 · RERA P50500051030 · Last updated on MahaRERA portal: 12 Aug 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 7 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2026Possession promised7 months past this date
119 of 119Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

ARMORS ESTATE is a Plotted project by ARMORS DEVELOPERS PRIVATE LIMITED in Nagpur, Maharashtra, registered with MahaRERA as P50500051030 on 22 May 2023. Possession was promised by 31 Mar 2026 and is now 7 months past that date. 0 of the 119 units on this registration are recorded sold or booked.

At a glance

Project

  • NameARMORS ESTATE
  • TypePlotted
  • Location
    • Kh. No. 136-A & 136-B
    • MOUZA RANALA
    • TAHSIL KAMPTEE
    • NAGPUR
    • Ranala
    • Kamptee
    • 441002
  • Pincode441002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500051030
  • ReraGenie IDRG-MH-38815

Builder

  • NameARMORS DEVELOPERS PRIVATE LIMITED
  • Entity typeCompany
  • DirectorSHARDA ANAND KHOBRAGADE
  • Managing DirectorANAND NARAYANRAO KHOBRAGADE
  • Other registrations1 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

7 months past promisethis monthRegisteredMay 2023PromisedMar 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on22 May 2023
  • Promised completion31 Mar 2026
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed88 files

Current status

0%0 of 119 units booked

Figures as on 12 Aug 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 12 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 12 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyNoNot applicable
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area43,235 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNMRDA
Permissible FSI47557.96
Proposed, not sanctioned47,558 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJARIPATKA NAGPUR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.Kiran Digamber Purohit
EngineerPankaj Ashokrao Landge
Chartered AccountantCA SANDEEP VIRANI
PartnerRole in project
ARMORS DEVELOPERS PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: FORM 1-Q1.pdf12 Aug 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE-Q1-ARMORS ESTATES.pdf12 Aug 2025
Form 3File: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf12 Aug 2025
Form 3File: FORM 3-RERA ARMORS DEVELOPERS-Q2.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM 3-RERA ARMORS DEVELOPERS-Q2.pdf12 Aug 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE-Q2-ARMORS ESTATE.pdf12 Aug 2025
Form 1File: FORM1-Q2.pdf12 Aug 2025
Form 1File: FORM1-Q3.pdf12 Aug 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE-Q3-ARMORS ESATE.pdf12 Aug 2025
Form 3File: FORM 3-RERA ARMORS DEVELOPERS-Q3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM 3-RERA ARMORS DEVELOPERS-Q3.pdf12 Aug 2025
Form 3File: FORM 3-RERA ARMORS DEVELOPERS-Q4.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM 3-RERA ARMORS DEVELOPERS-Q4.pdf12 Aug 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE-Q4-ARMORS ESATE.pdf12 Aug 2025
Form 1File: FORM1-Q4.pdf12 Aug 2025
Form 1File: FORM-1 ARCHITECT'S CERTIFICATE-Q1-Armors Estate.pdf12 Aug 2025
Form 2File: FORM-2 ENGINEER CERTIFICATE-Q1-24-25.pdf12 Aug 2025
Form 3File: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf12 Aug 2025
Form 1File: Armors Estate-Form-1.pdf12 Aug 2025
Form 2File: Armors Estate-Form-2.pdf12 Aug 2025
Form 3File: Armors Estate-Form-3_.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Armors Estate-Form-3.pdf12 Aug 2025
Form 1File: Form 1.pdf12 Aug 2025
Form 2File: Form 2.pdf12 Aug 2025
Form 3File: Form 3.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Form 3.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Armors Estate-Form-1.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Armors Estate-Form-3_.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Armors Estate-Form-2.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf11 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1 ARCHITECT'S CERTIFICATE-Q1-Armors Estate.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q1-24-25.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q4.pdf23 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-Q1.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-Q2.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-Q3.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1-Q4.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q1-ARMORS ESTATES.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q2-ARMORS ESTATE.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q3-ARMORS ESATE.pdf14 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q4-ARMORS ESATE.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q2.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q3.pdf14 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 ARCHITECT'S CERTIFICATE-Q1-Armors Estate.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 ARCHITECT'S CERTIFICATE-Q2-Armors Estate.pdf15 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form-1 ARCHITECT'S CERTIFICATE-Q3-Armors Estate.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q1-ARMORS ESTATES.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q2-ARMORS ESTATE.pdf15 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM-2 ENGINEER CERTIFICATE-Q3-ARMORS ESATE.pdf15 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q1.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q2.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-RERA ARMORS DEVELOPERS-Q3.pdf8 Feb 2024
Copy of the legal title reportFile: Title Verification Report.pdf13 May 2023
Copy of the legal title reportFile: Format A.pdf13 May 2023
Copy of the legal title reportFile: Annexure to Format A.pdf13 May 2023
Other - LegalFile: ANNEXURE A SHARDHA KHOBRAGADE.pdf13 May 2023
Proforma of Agreement for saleFile: Model Form of Agreement for Sale.pdf5 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A SHARDHA KHOBRAGADE.pdf4 May 2023
Other - FinanceFile: Reply to Queries.pdf4 May 2023
Building plan approval or NA orderFile: NMRDA.pdf21 Apr 2023
Layout approvalFile: Sanction Map.pdf21 Apr 2023
Layout approvalFile: Crop of Authority Signature for Better Understanding.pdf21 Apr 2023
Copy of Layout Approval (in case of layout)File: Sanction Map.pdf21 Apr 2023
Copy of Layout Approval (in case of layout)File: Crop of Authority Signature for Better Understanding.pdf21 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: NMRDA.pdf21 Apr 2023
CERSAI detailsFile: Undertaking for no security interest 2.pdf12 Apr 2023
PAN CardFile: PAN CARD Application to Income Tax.pdf10 Apr 2023
Declaration about Commencement CertificateFile: Decleration of Commencement Certificate-Format D.pdf10 Apr 2023
Declaration in FORM BFile: FORM B.pdf10 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report.pdf10 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf10 Apr 2023
Deviation Report with respect to Allotment letterFile: No Deviation-Allotment Letter.pdf10 Apr 2023
Deviation Report with respect to model copy of AgreementFile: No Deviation-AFS.pdf10 Apr 2023
Building plan approval or NA orderFile: NA ORDER-ORIGINAL SIGN_.pdf8 Apr 2023

How this compares with Nagpur

0%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is among them

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ARMORS ESTATE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAGPUR2,800+ in Nagpur

2 kmARMORS ESTATECompleted 10Lapsed / revoked 7Other 11Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: ARMORS DEVELOPERS PRIVATE LIMITED

ARMORS DEVELOPERS PRIVATE LIMITED has 2 registrations on MahaRERA, including ARMORS NAGAR and ARMORS ESTATE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What does it mean that ARMORS ESTATE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ARMORS ESTATE is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ARMORS ESTATE?

The registered promoter entity is ARMORS DEVELOPERS PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ARMORS ESTATE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ARMORS ESTATE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ARMORS ESTATE?

The professionals named in the filing: Architect: Mr.Kiran Digamber Purohit; Engineer: Pankaj Ashokrao Landge; Chartered Accountant: CA SANDEEP VIRANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ARMORS ESTATE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ARMORS ESTATE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ARMORS ESTATE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.