Home / Browse projects / Thane, Maharashtra / AWASARE HEIGHTS

Registered No litigation declared Residential / Group Housing project

AWASARE HEIGHTS

By RAJKUMAR TULJARAM ASWANI

RG-MH-06760 · RERA P51700053942 · Last updated on MahaRERA portal: 19 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
5 of 11Construction stages donefurthest along: Staircases, 85%
5 of 15Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 57 documents Report an error

AWASARE HEIGHTS is a Residential / Group Housing project by RAJKUMAR TULJARAM ASWANI in Thane, Maharashtra, registered with MahaRERA as P51700053942 on 11 Dec 2023. Possession was promised by 30 Sep 2026 and is now 1 months past that date. 10 of the 15 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameAWASARE HEIGHTS
  • TypeResidential / Group Housing
  • Location
    • SHAHAPUR
    • Shahapur (CT)
    • Thane
    • 421601
  • Pincode421601
  • RERA no.P51700053942
  • ReraGenie IDRG-MH-06760

Builder

  • NameRAJKUMAR TULJARAM ASWANI
  • Entity typeIndividual
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

1 months past promisethis monthRegisteredDec 2023PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Dec 2023
  • Promised completion30 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed57 files

Current status

67%10 of 15 units booked
68.1%Work done, per cost certificate

Figures as on 19 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 1NA6515015

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 19 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 85%.

BUILDING NO 1: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed19

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots19
Closed/Covered19

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area399 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2025
LandownerVillageDistrict
RAJENDRA AWASAREKalyanThane
SAVITA BAGALEKalyanThane

Approvals and building plan

Sanctioning authorityAssistant Director Town Planning. Shahapur
Permissible FSI893.47
Proposed, not sanctioned893 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKONARK PLAZA, SAPANA TALKIES, SAPANA GARDEN, DIST THANE, ULHASNAGAR - 421003
Estimated costRs 2.19 cr
Cost incurredRs 1.49 cr
Work done68.1%
BuildingWingEstimatedIncurred
BUILDING NO 1NARs 2.03 crRs 1.49 cr
-NARs 15.44 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKARANJALI ARCH JALNAPURE
EngineerJAI TALREJA
Chartered AccountantGIRISH TARWANI
Chartered AccountantVINESH AHUJA
PartnerRole in project
RAJKUMAR TULJARAM ASWANI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Oct 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Oct 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed57

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 Q3.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2 Q3.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 signed Dec 25.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 Mar 26 signed.pdf19 Jun 2026
Withdrawal Update Form 1File: Form 1 signed.pdf19 Apr 2026
Withdrawal Update Form 2File: Form 2 signed.pdf19 Apr 2026
Withdrawal Update Form 3File: Form 3 signed.pdf19 Apr 2026
Form 5 (FY 2024-2025)File: Mahadev Homes Form 5.pdf1 Nov 2025
Form 1File: Architect.pdf12 Aug 2025
Form 2File: engineer.pdf12 Aug 2025
Form 3File: Ca certificate.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold 30-6 signed.pdf12 Aug 2025
Form 1File: architect 1.pdf12 Aug 2025
Form 2File: Engineer 1.pdf12 Aug 2025
Form 3File: Ca certificate.pdf12 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold 31-3 signed.pdf12 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mahadev H.pdf4 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Mahadev Q3.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mahadev H.pdf4 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mahadev Q3.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mahadev H.pdf4 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Mahadev Q3.pdf4 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mahadev Homes.pdf17 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Mahadev Homes.pdf17 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf26 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer.pdf26 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA1_merged.pdf26 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf20 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Enginner.pdf20 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certif.pdf20 Jun 2024
Proforma of Agreement for saleFile: NEW AGREEMENT FOR SALE.pdf28 Nov 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement (1).pdf28 Nov 2023
Other - TechnicalFile: CC VERIFICATION LETTER.pdf10 Nov 2023
Declaration about Commencement CertificateFile: Commencement Declaration.pdf28 Oct 2023
Copy of the legal title reportFile: TITLE REPORT.pdf27 Oct 2023
Details of encumbrances concerned to FinanceFile: f and l.pdf16 Oct 2023
Details of encumbrances concerned to LegalFile: f and l.pdf16 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf16 Oct 2023
CERSAI detailsFile: CERSAI_Search_Report_200283065841_For_Asset_Based_Search_09_10_2023_22_29_22_296.pdf9 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate (2).pdf9 Oct 2023
CERSAI detailsFile: Cersai Declaration.pdf7 Oct 2023
Proforma of Allotment letterFile: allotment letter_11zon.pdf7 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank.pdf7 Oct 2023
Layout approvalFile: scan0339( PLAN)_11zon.pdf4 Oct 2023
Building plan approvalFile: scan0339( PLAN)_11zon.pdf4 Oct 2023
PAN CardFile: Pan Card.pdf4 Oct 2023
Copy of Layout Approval (in case of layout)File: scan0339( PLAN)_11zon.pdf4 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: scan0339( PLAN)_11zon.pdf4 Oct 2023
Declaration in FORM BFile: Proprietor FORM B.pdf4 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architecture.pdf4 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cert.pdf4 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest Declaration.pdf4 Oct 2023
Deviation Report with respect to Allotment letterFile: Deviation 2.pdf4 Oct 2023

How this compares with Thane

67%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AWASARE HEIGHTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SHAHAPUR7,600+ in Thane

Builder: RAJKUMAR TULJARAM ASWANI

RAJKUMAR TULJARAM ASWANI has 2 registrations on MahaRERA, including MAHADEV RESIDENCY and AWASARE HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AWASARE HEIGHTS is delayed beyond 30 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AWASARE HEIGHTS?

The registered promoter entity is RAJKUMAR TULJARAM ASWANI, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AWASARE HEIGHTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for AWASARE HEIGHTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AWASARE HEIGHTS?

The professionals named in the filing: Architect: KARANJALI ARCH JALNAPURE; Engineer: JAI TALREJA; Chartered Accountant: GIRISH TARWANI; Chartered Accountant: VINESH AHUJA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AWASARE HEIGHTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AWASARE HEIGHTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AWASARE HEIGHTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.