Home / Browse projects / Mumbai Suburban, Maharashtra / Avyukta Neelkamal

Registered No litigation declared Residential / Group Housing project

Avyukta Neelkamal

By Shivoham Associates

RG-MH-41311 · RERA P51800035115 · Last updated on MahaRERA portal: 9 Jun 2026

Source: official MahaRERA filing

Red flags

  • Possession 1 months past the filed date
  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Sep 2026Possession promised1 month past this date
11 of 11Construction stages doneevery applicable stage filed complete
105 of 151Units unsoldnot recorded sold or booked
2Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Avyukta Neelkamal is a Residential / Group Housing project by Shivoham Associates in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800035115 on 10 May 2022. Possession was promised by 1 Sep 2026 and is now 1 months past that date. 46 of the 151 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.

At a glance

Project

  • NameAvyukta Neelkamal
  • TypeResidential / Group Housing
  • Location
    • D. D. Borge Marg
    • Borivali (West)
    • Borivali
    • Mumbai Suburban
    • 400092
  • Pincode400092
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800035115
  • ReraGenie IDRG-MH-41311

Builder

  • NameShivoham Associates
  • Entity typePartnership
  • PartnersRahul Jain, Tejraj Jain Jain, Hetal Ajmera, Milan Ajmera, Puneet Ajmera, Vishal Ajmera
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

1 months past promisethis monthRegisteredMay 2022PromisedSep 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 May 2022
  • Promised completion1 Sep 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

30%46 of 151 units booked
189.9%Work done, per cost certificate

Figures as on 9 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avyukta NeelkamalNA27231510151

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 9 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Avyukta Neelkamal: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 9 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,479 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on2 Sep 2025
LandownerVillageDistrict
Eksar Neelkamal CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMUNICIPAL CORPORATION OF GREATER MUMBAI
Permissible FSI9375.39
Proposed, not sanctioned9,375 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBorivali West
Estimated costRs 22.81 cr
Cost incurredRs 43.32 cr
Work done189.93%
BuildingWingEstimatedIncurred
Avyukta NeelkamalNARs 22.81 crRs 43.32 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUNIL JAIN
EngineerHaresh Patel
EngineerJACOB BASTYAW DSOUZA
Chartered AccountantJayesh Kokhani
Chartered AccountantNEHALI & CO
PartnerRole in project
Shivoham Associates-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC12603664Shivoham AssociatesJIMIT LALIT JANANI13/06/2026
CC12604099Saket Rajaram SawantShivoham Associates01/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Feb 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Feb 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Jul 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM 1.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf9 Jun 2026
Withdrawal Update Form 2File: FORM 2 DEC 25.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf9 Jun 2026
Withdrawal Update Form 3File: FORM 3.pdf9 Jun 2026
Withdrawal Update Form 1File: FORM NO 1.pdf8 Jun 2026
Withdrawal Update Form 2File: FORM 2.pdf8 Jun 2026
Withdrawal Update Form 3File: FORM NO 3.pdf8 Jun 2026
Withdrawal Update Form 1File: FORM NO1 AVYUKTA NEELKAMAL.pdf2 Jun 2026
Withdrawal Update Form 2File: form 2.pdf2 Jun 2026
Withdrawal Update Form 3File: form 3.pdf2 Jun 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM NO1 - AVYUKTA NEELKAMAL.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: AVYUKTA NEELKAMAL - OCT TO DEC 2024.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - NEELKAMAL.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf16 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: 2428832_FurtherCC_signed.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 11 23.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 04 23.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 04 24.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 05 22.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 09 22.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 05 23.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf10 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AVYUKTA NEELKAMAL.pdf1 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: 2223 Form 5 Annual Audit Report AVYUKTA NEELKAMAL.pdf4 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 old.pdf25 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 New.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 old.pdf25 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 New-compressed.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 New_compressed.pdf25 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf6 May 2022
Building plan approvalFile: 1.pdf28 Apr 2022
Building plan approvalFile: 2.pdf28 Apr 2022
Building plan approvalFile: 3.pdf28 Apr 2022
Building plan approvalFile: 4.pdf28 Apr 2022
Building plan approvalFile: 5.pdf28 Apr 2022
Building plan approvalFile: 6.pdf28 Apr 2022
Building plan approvalFile: 7.pdf28 Apr 2022
Building plan approvalFile: 8.pdf28 Apr 2022
Building plan approvalFile: 9.pdf28 Apr 2022
Building plan approvalFile: 10.pdf28 Apr 2022
Building plan approvalFile: 11.pdf28 Apr 2022
Building plan approvalFile: 12.pdf28 Apr 2022
Building plan approvalFile: 13.pdf28 Apr 2022
Building plan approvalFile: 14.pdf28 Apr 2022
Building plan approvalFile: 15.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 1.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 2.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 3.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 4.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 5.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 6.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 7.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 9.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 10.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 12.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 14.pdf28 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: 15.pdf28 Apr 2022
PAN CardFile: SHIVOHAM ASSOCIATES PAN CARD.pdf21 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: CC 01.pdf6 Apr 2022
Declaration about Commencement CertificateFile: Declaration on CC.pdf6 Apr 2022
CERSAI detailsFile: CERSAI Search Report.pdf8 Mar 2022
Details of encumbrancesFile: Encumbarance Letter.pdf7 Mar 2022
Proforma of Allotment letterFile: AFS.pdf7 Mar 2022
Proforma of Allotment letterFile: LETTER OF ALLOTMENT (RERA).pdf7 Mar 2022
Declaration in FORM BFile: Form B_compressed.pdf26 Feb 2022
Layout approvalFile: IOD 02.pdf24 Feb 2022
Copy of the legal title reportFile: MRERA Title.pdf24 Feb 2022
Copy of Layout Approval (in case of layout)File: IOD 02.pdf24 Feb 2022

How this compares with Mumbai Suburban

30%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Avyukta Neelkamal on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borivali (West)6,700+ in Mumbai Suburban

2 kmAvyukta NeelkamalCompleted 44Lapsed / revoked 22Other 44Dot size: filed unitsN

Filed coordinates, straight-line distance. 110 registered projects within 2 km.

Builder: Shivoham Associates

Shivoham Associates has 2 registrations on MahaRERA, including Avyukta Breeze and Avyukta Neelkamal. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Avyukta Neelkamal is delayed beyond 1 Sep 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Avyukta Neelkamal?

The registered promoter entity is Shivoham Associates, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Avyukta Neelkamal?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Avyukta Neelkamal?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Avyukta Neelkamal?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Avyukta Neelkamal?

The professionals named in the filing: Architect: SUNIL JAIN; Engineer: Haresh Patel; Engineer: JACOB BASTYAW DSOUZA; Chartered Accountant: Jayesh Kokhani; Chartered Accountant: NEHALI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Avyukta Neelkamal?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Avyukta Neelkamal. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Avyukta Neelkamal to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.