Completed No litigation declared Residential / Group Housing project

AVON VISTA PROJECT -1

By NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD

RG-MH-09132 · RERA P52100000371 · Last updated on MahaRERA portal: 4 Oct 2023

Source: official MahaRERA filing

Red flags

  • 5 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
29 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 0%
5Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

AVON VISTA PROJECT -1 is a Residential / Group Housing project by NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100000371 on 15 Jul 2017. The registration is recorded completed; possession was promised by 29 Jun 2022. The completion date has moved by 18 months from the original filing. 5 complaints are on record with the regulator.

At a glance

Project

  • NameAVON VISTA PROJECT -1
  • TypeResidential / Group Housing
  • Location
    • PUNE
    • Mahalunge
    • Mulshi
    • 410501
  • Pincode410501
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100000371
  • ReraGenie IDRG-MH-09132

Builder

  • NameNAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD
  • Entity typePartnership
  • PartnersHEMANT DATTAJI NAIKNAVARE, GAURI HEMANT NAIKNAVARE, RAJESH MADANMOHAN CHOUDHARY
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2017First promiseDec 2020Revised toJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Jul 2017
  • Promised completion29 Jun 2022
  • Revised completionRevised to 29 Jun 2022 (originally 30 Dec 2020)
  • Buildings3 building records
  • Documents filed108 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A1 BUILDINGNA240000
B1 BUILDINGNA240000
CLUB HOUSENA20000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Oct 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

29 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 0%.

A1 BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B1 BUILDING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
CLUB HOUSE64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Oct 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered4
Open Space14
BuildingClosed/CoveredOpen SpaceTotal
A1 BUILDING279
B1 BUILDING279

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,678 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SYNERGY DEVELOPMENT CORPORATION PVT LTDPune (M Corp.)Pune
HEMANT DATTAJI NAIKNAVAREPune (M Corp.)Pune
SHRIKANT PURSHOTTAM PARANJAPEPune (M Corp.)Pune

Approvals and building plan

Permissible FSI11579.75
Proposed, not sanctioned10,579 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchINDRAPUSHTI OPP FC COLLEGE GATE NO 2 PUNE 411004

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURI NAIKNAVARE
EngineerKRUPALI KADAM
PartnerRole in project
NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008868Dec 2020 → Dec 2021

Reason as filed by the promoterWe have registered our project by the name “Avon Vista” (for Buildings A1, B1, Club house) bearing MAHARERA Registration No. P-52100000371. . The date of completion of the said project initially was 30.06.2020, which was then extended to 30.12.2020 due to the prevalent Covid-19 pandemic lock down, as per the guidelines of the Authority. It is pertinent to note that the Competent Authority i.e. PMRDA had issued the Commencement Certificate for the said Building with sanctioned Building Plan for 21 floors. Now though the said Building A1 is complete in all respect, the OC is pending only for the

Complaints filed with MahaRERA5

Case no.ComplainantRespondentFiled
CC005000000085260Sameep Anand BhoganAnand Naiknavare01/03/2021
CC005000000096043Nilesh PatilNAIKNAVARE DEVELOPERS PVT LTD22/09/2021
CC005000000096044Vaibhav KhamgaonkarNAIKNAVRE DEVELOPS PVT LTD22/09/2021
CC005000000096088Aditya GosaviNaikNavare Profile Construction Pvt Ltd04/10/2021
CC005000000269451Amol Suryakant GavhaneNaiknavare Profile constructions PVT LTD15/09/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jun 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 26 Dec 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 20 Jan 2023

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Avon Vista Pro1.pdf4 Oct 2023
Architect’s Certificate on Completion of Project (Form 4)File: Avon Vista Pro1 FORM 4 -ARCH CERTIFICATE- A1-B1-CLUBHOUSE.pdf10 Apr 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Avon Vista 1 - FY 31-03-2021.pdf15 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Avon Vista 1 FY 31-03-2022.pdf15 Feb 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVON VISTA CLUB HOUSE COMPLETION CERTIFICATE 2019.pdf20 Jan 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Avon Vista A1,B1.pdf18 Jan 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: AVON PRO 1 FORM 1 JUN SEPT 22.pdf14 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PRO 01 ARCH CERT 30042022.pdf4 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 15042022.pdf18 Apr 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 03012022.pdf6 Jan 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 03012022.pdf6 Jan 2022
Status of Formation of Legal Entity (Society/Co Op etc.)File: Avon Vista Society Formation Certificate.pdf20 Dec 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Avon Vista A1 Bldg Compl.pdf8 Dec 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 02102021.pdf7 Oct 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 02102021.pdf7 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ca letter 2020-2021.pdf16 Aug 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGG CERT 05082021.pdf11 Aug 2021
Certificates of CA (Form 5)File: AvonVistaProject1.pdf9 Aug 2021
Certificates of CA (Form 5)File: NPCPL_Project 1 Annexure.pdf9 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: AvonVistaProject1 2019-2020.pdf9 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 05082021.pdf6 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: RERA Certificate- Phase 1 2018-19.pdf28 Jul 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVON VISTA B1 BLDG COMPLETION CERTIFICATE.pdf28 Jul 2021
Layout approvalFile: Avon vista lower lvl parking.pdf9 Jun 2021
Layout approvalFile: Avon vista sanction LAYOUT.pdf9 Jun 2021
Layout approvalFile: Avon vista sanction layout1.pdf9 Jun 2021
Layout approvalFile: Avon vista schmatic section.pdf9 Jun 2021
Layout approvalFile: Avon vista upper lvl parking.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: Avon vista lower lvl parking.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: Avon vista sanction LAYOUT.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: Avon vista sanction layout1.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: Avon vista schmatic section.pdf9 Jun 2021
Copy of Layout Approval (in case of layout)File: Avon vista upper lvl parking.pdf9 Jun 2021
OtherFile: Avon Vista- Society Registration Certificate.pdf30 Apr 2021
OtherFile: AVON VISTA B1 BLDG COMPLETION CERTIFICATE 2020.pdf28 Apr 2021
OtherFile: CHRONOLOGY.pdf28 Apr 2021
OtherFile: avon vista.pdf28 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 01 ENGGCERT 27042021.pdf27 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ 01 ARCH CERT 16042021.pdf19 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVON VISTA A1 PART COMPLETION.pdf19 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: AVON VISTA B1 BLDG COMPLETION CERTIFICATE 2020-compressed.pdf19 Apr 2021
OtherFile: AVON VISTA A1 PART COMPLETION.pdf15 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: A1-OC.pdf14 Apr 2021
Architect’s Certificate on Completion of Project (Form 4)File: Architect Letter Avon Vista A1.pdf14 Apr 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ 1 ENGG CERT 19012021.pdf19 Jan 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PROJ01 ARCH CERT 26062020.pdf7 Jul 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: PROJ01 ENGG CERT 26062020.pdf7 Jul 2020
OtherFile: Water lifting Application.pdf21 Feb 2020
OtherFile: Water lifting Application.pdf21 Feb 2020
OtherFile: Nhai Bombay Office order for Avon Vista .pdf21 Feb 2020
OtherFile: ELECTRICAL CONNECTION LINE.pdf21 Feb 2020
Certificates of CA (Form 5)File: RERA Certificate Phase 1.pdf17 Feb 2020
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch 1312020.pdf13 Jan 2020
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng 1312020.pdf13 Jan 2020
Building plan approvalFile: A1 BLDG RERA AREA.pdf26 Dec 2019
Building plan approvalFile: B1 BLDG RERA AREA.pdf26 Dec 2019
Building Plan Approval (IOD)File: A1 BLDG RERA AREA.pdf26 Dec 2019
Building Plan Approval (IOD)File: B1 BLDG RERA AREA.pdf26 Dec 2019
Proforma of Allotment letterFile: Index-II AVON VISTA PROJECT 1.pdf12 Nov 2019
Proforma of Allotment letterFile: AVON VISTA AGREEMENT PROJECT 1.pdf12 Nov 2019
OtherFile: CREDAINDPL MEM CERT 2020.pdf4 Nov 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT 15102019.pdf16 Oct 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGCERT 15102019.pdf16 Oct 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERT PHASE1.pdf18 Jul 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERT PHASE1.pdf18 Jul 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH 19-4-19.pdf19 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG 19-4-19.pdf19 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch18119.pdf18 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng18119.pdf18 Jan 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch16102018.pdf15 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng16102018.pdf15 Oct 2018
Certificates of CA (Form 5)File: Naiknavareavon.pdf30 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHCERTIFICATEAVON.pdf16 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGCERTIFICATEAVON.pdf16 Jul 2018
PAN CardFile: PAN npcpl.pdf25 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHCERTIFICATE2.pdf16 Apr 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGCERTIFICATE2.pdf16 Apr 2018
Proforma of Allotment letterFile: ALLOTMENT LETTER AND AGREEMENT TO SELL.pdf8 Feb 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Avon Vista-Architect Certificate 23june2017.pdf15 Jan 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGCERTIFICATE1512018.pdf15 Jan 2018

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVON VISTA PROJECT -1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near PUNE13,700+ in Pune

2 kmAVON VISTA PROJECT -1Completed 125Lapsed / revoked 47Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 270 registered projects within 2 km.

Builder: NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD

NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD has 2 registrations on MahaRERA, including AVON VISTA PROJECT -1 and AVON VISTA PROJECT 3. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if AVON VISTA PROJECT -1 is delayed beyond 29 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVON VISTA PROJECT -1?

The registered promoter entity is NAIKNAVARE PROFILE CONSTRUCTIONS PVT LTD, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVON VISTA PROJECT -1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVON VISTA PROJECT -1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVON VISTA PROJECT -1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVON VISTA PROJECT -1?

The professionals named in the filing: Architect: GAURI NAIKNAVARE; Engineer: KRUPALI KADAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVON VISTA PROJECT -1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVON VISTA PROJECT -1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVON VISTA PROJECT -1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.