ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / AVISAA

Registered No litigation declared Others project

AVISAA

By NIVASTI DEVELOPERS LLP

RG-MH-56035 · RERA P51700016164 · Last updated on MahaRERA portal: 30 Jan 2026

Source: official MahaRERA filing

Red flags

  • 15 complaints at MahaRERA
  • Completion date moved by 74 months
  • 1 extension taken
  • Rs 91.32 crore secured on the land, in favour of LIC Housing Finance Ltd
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedmoved 74 months from the original
5 of 11Construction stages donefurthest along: Staircases, 97%
26 of 70Units unsoldnot recorded sold or booked
15Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

AVISAA is a Others project by NIVASTI DEVELOPERS LLP in Thane, Maharashtra, registered with MahaRERA as P51700016164 on 20 Apr 2018. Possession is promised by 31 Dec 2030. The completion date has moved by 74 months from the original filing. 44 of the 70 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 15 complaints are on record with the regulator.

At a glance

Project

  • NameAVISAA
  • TypeOthers
  • Location
    • PLOT NO 7A SECTOR NO 13
    • SANPADA PALM BEACH
    • Navi Mumbai (M Corp.)
    • Thane
    • 400705
  • Pincode400705
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700016164
  • ReraGenie IDRG-MH-56035

Builder

  • NameNIVASTI DEVELOPERS LLP
  • Entity typePartnership
  • GSTIN27AAMFN7787P2ZZ
  • PartnersASHWIN PRABHUDAS VORA, NIMISH PRAVINCHANDRA VORA, RAJESH NARENDRA VORA, MAYUR ANIL RAIGANGAR, MITALI LUV VORA

Key dates

this monthRegisteredApr 2018First promiseOct 2024Revised toDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on20 Apr 2018
  • Promised completion31 Dec 2030
  • Revised completionRevised to 31 Dec 2030 (originally 30 Oct 2024)
  • Buildings1 building record
  • Documents filed128 files

Current status

63%44 of 70 units booked
60.9%Work done, per cost certificate

Figures as on 30 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AVISAANA3938482270

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 97%.

AVISAA: 64% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.58%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered114
Open Space12

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,049 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofLIC Housing Finance Ltd
Secured amountRs 91.32 crore
CERSAI search filedYes
Declared on12 Jan 2026

Approvals and building plan

Sanctioning authorityNavi Mumbai Municipal Corporation
Permissible FSI4568.99
Proposed, not sanctioned4,569 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Central Facility Building APMC 1 Phase 2 Masala Market Vashi Navi Mumbai 400705
Estimated costRs 41.56 cr
Cost incurredRs 25.29 cr
Work done60.86%
BuildingWingEstimatedIncurred
AVISAANARs 40.70 crRs 25.29 cr
-NARs 86.00 lakh-

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAJESH RADHAKISHAN CHANDA
EngineerCSE CONSULTANTS
EngineerBharat Dave
EngineerSomnath Dhanaji Kale
Chartered AccountantRASIKLAL SHAH & ASSOCIATES
Chartered AccountantP V K & CO
Chartered AccountantH R RATHI & CO
Chartered AccountantN B Sayed & Associates
PartnerRole in project
NIVASTI DEVELOPERS LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51700025747Oct 2024 → Dec 2030

Reason as filed by the promoterWe hereby submit this application seeking an extension of the registration period under Section 7(3) of the Maharashtra Real Estate Regulatory Authority Act. The project was started prior to outbreak of COVID-19, which had an impact on real estate project for nearly 2 years, from March 2020 to February 2022 which has severely impacted the availability of labour and disrupted the supply chain, causing significant delays in the construction activities. This has resulted in slow progress in construction. However, we are trying to complete the project at the earliest. Kindly process our applicatio

Complaints filed with MahaRERA15

Case no.ComplainantRespondentFiled
CC12401097Aditya DagaNIVASTI DEVELOPERS LLP11/12/2024
CC12401121Gaurav Ajay SarafNIVASTI DEVELOPERS LLP13/12/2024
CC12500408Kamlesh DadlaniNIVASTI DEVELOPERS LLP07/02/2025
CC12501440Ashok DayaramaniNIVASTI DEVELOPERS LLP29/04/2025
CC12501443Ashok DayaramaniNIVASTI DEVELOPERS LLP29/04/2025
CC12503823Rajesh ViswanathanNIVASTI DEVELOPERS LLP01/11/2025
CC12501966Rakesh Bhawarlala khatriNIVASTI DEVELOPERS LLP16/06/2025
CC12502902Rajesh Kumar DagaNIVASTI DEVELOPERS LLP18/08/2025
CC12503654NIVASTI DEVELOPERS LLPBhawarlal Bisanlal Khatri14/10/2025
CC12503655NIVASTI DEVELOPERS LLPAditya Rajesh Daga14/10/2025
CC12503656NIVASTI DEVELOPERS LLPGaurav Ajay Saraf14/10/2025
CC12503657NIVASTI DEVELOPERS LLPKamlesh Dadlani14/10/2025
CC12503817Sagar KaleNIVASTI DEVELOPERS LLP31/10/2025
CC12504590Om Khemraj GahlotNIVASTI DEVELOPERS LLP23/12/2025
CC12601269NIVASTI DEVELOPERS LLPSagar Kale09/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Apr 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Apr 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 -30-09-25.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM 2 30-09-25.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3 30-09-25.pdf30 Jan 2026
Withdrawal Update Form 1File: Form 1 - 30-06-25.pdf21 Jan 2026
Withdrawal Update Form 2File: Form 2 30-06-25.pdf21 Jan 2026
Withdrawal Update Form 3File: Form 3 20-06-25_compressed.pdf21 Jan 2026
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 (4).pdf3 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: FORM 5 H R RATHI FY 2018-19.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 H R RATHI 2019-20.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 H R RATHI 2020-21.pdf2 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 H R RATHI FY 2021-22.pdf2 Jan 2025
Declaration in FORM BFile: FORM B.pdf1 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: FORMAT A.pdf1 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXTURE A.pdf1 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 31-03-2024.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 30-09-2024.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 30-06-2024.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 31-12-2023.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 30-9-2023.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 31-03-2023.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 DATED 31-12-2022.pdf31 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: BHARAT DAVE 30-06-2023.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 1 Form 2A 19-20 ONLH 30 12 2024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2 Form 2A 20-21 ONLH 30 12 2024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 3 Form 2A 21-22 ONLH 30 12 2024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 4 Form 2A 22-23 ONLH 30 12 2024.pdf31 Dec 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 5 Form 2A 23-24 ONLH 30 12 2024.pdf31 Dec 2024
Certificates of CA (Form 3)File: 1 FORM 3 1-4-23 to 30-6-23_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: 2 FORM 3 1-7-23 to 30-9-23_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: 3 FORM 3 1-10-23 to 31-12-2023_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: 4 FORM 3 1-1-2024 TO 31-03-2024_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: 5 FORM 3 1-4-24 to 30-6-24_compressed.pdf28 Dec 2024
Certificates of CA (Form 3)File: 6 FORM 3 1-7-24 to 30-9-24_compressed.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 30-09-2022.pdf28 Dec 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM -2 30-06-2022.pdf28 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: H R RATHI FORM 5 FY23-24.pdf28 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 CERTIFICATE 30-06-2024.pdf27 Dec 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 CERTIFICATE 30-09-2024.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 FY22-23-F.pdf29 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 30 6 22.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 30 9 22.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 3112 22.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31 3 23.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 30 6 23.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 30 9 23.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31 12 23.pdf24 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31 3 24_compressed.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 Q1 FY 22-23 SIGNED_compressed.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 Q2 FY 22-23 SIGNED_compressed.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 Q3 FY 22-23 SIGNED_compressed.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 Q4 FY 22-23 SIGNED_compressed.pdf24 Apr 2024
Certificates of CA (Form 3)File: FORM 3 FY 21-22_compressed.pdf16 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 FY 21-22.pdf16 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Annual Report On Statement Of Accounts 2020-21.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Annual Report On Statement Of Accounts 2019-20.pdf3 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Annual Report On Statement Of Accounts 2020-21.pdf3 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31-3-2020.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31-3-2021.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: R C Form 1 CERTIFICATE 31-3-2022.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nivasti Engineer Certificate 31-3-20_compressed.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nivasti Engineer Certificate -31-3-21_compressed.pdf17 Feb 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Nivasti Engineer Certificate 31-3-22_compressed.pdf17 Feb 2023
Certificates of CA (Form 3)File: FORM 3 FY 19-20 SIGNED_compressed.pdf17 Feb 2023
Certificates of CA (Form 3)File: FORM 3 FY 20-21 SIGNED_compressed.pdf17 Feb 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-36th Slab.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-37th Slab.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-37th Slab.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-38th Slab_compressed.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-Brick Work.pdf1 Feb 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate.pdf19 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-35th Slab.pdf5 Aug 2021
Certificates of CA (Form 3)File: FORM-3-RERA CA CERTIFICATE.pdf5 Aug 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-33rd Slab.pdf30 Jun 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-34th Slab.pdf30 Jun 2021
Details of encumbrancesFile: ENCUMBRANCES-NIVASTI AVISAA1.pdf24 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - 31st Slab.pdf24 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-32nd Slab.pdf24 May 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-27th slab.pdf2 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-28th Slab.pdf2 Apr 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate-Sanpada-29th Slab.pdf2 Apr 2021

How this compares with Thane

63%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one moved by 74 months
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVISAA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANPADA PALM BEACH7,600+ in Thane

2 kmAVISAACompleted 15Lapsed / revoked 8Other 29Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: NIVASTI DEVELOPERS LLP

NIVASTI DEVELOPERS LLP has 1 registration on MahaRERA, including AVISAA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if AVISAA is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVISAA?

The registered promoter entity is NIVASTI DEVELOPERS LLP, a partnership as per the filing. Its GSTIN 27AAMFN7787P2ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVISAA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVISAA?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVISAA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVISAA?

The professionals named in the filing: Architect: RAJESH RADHAKISHAN CHANDA; Engineer: CSE CONSULTANTS; Engineer: Bharat Dave; Engineer: Somnath Dhanaji Kale; Chartered Accountant: RASIKLAL SHAH & ASSOCIATES; Chartered Accountant: P V K & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVISAA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVISAA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVISAA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.