Home / Browse projects / Mumbai Suburban, Maharashtra / AVENUE WING B

Registered Litigation declared Residential / Group Housing project

AVENUE WING B

By Dharmesh Constructions Private Limited

RG-MH-20699 · RERA P51800004402 · Last updated on MahaRERA portal: 5 Feb 2025

Source: official MahaRERA filing

Red flags

  • Litigation declared, 2 cases
  • 30 complaints at MahaRERA
  • Completion date moved by 66 months
  • 3 extensions taken
  • Rs 150.00 crore secured on the land, in favour of HDFC Limited

Clear

  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 66 months from the original
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 82%
21 of 174Units unsoldnot recorded sold or booked
30Complaints at MahaRERAon this registration
Jump to the 139 documents Report an error

AVENUE WING B is a Residential / Group Housing project by Dharmesh Constructions Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004402 on 9 Aug 2017. Possession is promised by 30 Dec 2026. The completion date has moved by 66 months from the original filing. 153 of the 174 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete. 30 complaints are on record with the regulator.

At a glance

Project

  • NameAVENUE WING B
  • TypeResidential / Group Housing
  • Location
    • Ambedkar Road
    • Kandivali
    • Borivali
    • Mumbai Suburban
    • 400067
  • Pincode400067
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800004402
  • ReraGenie IDRG-MH-20699

Builder

  • NameDharmesh Constructions Private Limited
  • Entity typeCompany
  • ChairpersonMunish Pravin Doshi
  • Other registrations5 more →
  • Completed1 of 6
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredAug 2017First promiseJun 2021Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 Aug 2017
  • Promised completion30 Dec 2026
  • Revised completionRevised to 30 Dec 2026 (originally 30 Jun 2021)
  • Buildings1 building record
  • Documents filed139 files

Current status

88%153 of 174 units booked
58.1%Work done, per cost certificate

Figures as on 5 Feb 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Avenue B wingNA2801740174

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 82%.

Avenue B wing: 59% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure82%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises20%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.15%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities19

As on 5 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes20%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalYes80%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes45%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%
AmenitiesYes0%
2 Level podiumYes100%
StiltYes100%
External PodiumYes44%

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area698 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofHDFC Limited
Secured amountRs 150.00 crore
CERSAI search filedYes
Declared on5 Mar 2026
LandownerVillageDistrict
Dharmesh J. PaunBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI14280.19
Proposed, not sanctioned14,280 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANGA JAMUNA APTS, GR FLOOR, OPP SHOPPERS STOP, S V ROAD, ANDHERI WEST
Estimated costRs 64.13 cr
Cost incurredRs 37.28 cr
Work done58.13%
BuildingWingEstimatedIncurred
Avenue B wingNARs 54.05 crRs 29.73 cr
-NARs 10.08 crRs 7.55 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr.RAJESH ATHA
ArchitectMr.MUKESH BAHADUR of Consultants combined
ArchitectPankaj Kumaria
EngineerSACPL, Mr Nikhil sanghvi.
EngineerKiran Dadasaheb Mulik
Chartered AccountantManoj Shah
Chartered AccountantChampak K. Dedhia
PartnerRole in project
Dharmesh Constructions Private Limited-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800009382Jun 2021 → Jun 2022

Reason as filed by the promoter2016: PLOT BOUNDARY DEMARCATION ISSUE 2016: DUMPING GROUND ISSUE 2016: DEMONITISATION 2017: IMPLEMENTATION OF RERA ACT 2017: GST IMPACT 2018: AMENDMENT IN DCR 2018: 33/38 PROCEEDINGS UNDER SLUMS ACT INITIATED AGAINST TENANTS WHO WERE NOT VACATING 2019: FURTHER 33/38 PROCEEDINGS 2019: ROAD GOING THROUGH OUR PROPERTY INCORRECTLY SHOWN IN DP 2034 TILL DATE: Non-payment of outstanding dues by many flat purchasers affecting the pace of work and delaying the project TILL DATE: CORONA VIRUS- COVID 19 PANDEMIC

EXT51800015056Jun 2021 → Dec 2024

Reason as filed by the promoter• 29 Months Delay - We applied for Plot Demarcation on 27/09/2016 and received it finally on 12/02/2019 from Approving Authority. • 14 Months Delay Till Date - 24 slum tenants had refused to vacate the plot and we had to go to Court to vacate them as per 33(38) provision of Slum Act which is to vacate their respective premises for the purpose of demolition so that further work for the project can commence, hence we have initiated 33(38) proceedings in SRA on 23/10/2018 and obtained order against few non-cooperating members on 13/03/2019. • 13 Months Delay Till Date - Under DCPR 2034 and new DP

EXT51800024747Jun 2021 → Dec 2026

Reason as filed by the promoter• 29 Months Delay - We applied for Plot Demarcation on 27/09/2016 and received it finally on 12/02/2019 from Approving Authority. • 14 Months Delay Till Date 24 slum tenants had refused to vacate the plot and we had to go to Court to vacate them as per 33(38) provision of Slum Act which is to vacate their respective premises for the purpose of demolition so that further work for the project can commence, hence we have initiated 33(38) proceedings in SRA on 23/10/2018 and obtained order against few non-cooperating members on 13/03/2019. • 13 Months Delay Till Date Under DCPR 2034 and new DP, th

Litigation declared2

CaseCourtStatus
68 of 2016/2016Consumer Court State CommissionDisposed Off As Withdrawn with No Order As to Costs
04/2024Consumer Disputes Redressal Commission Maharashtra StateOngoing

Complaints filed with MahaRERA30

Case no.ComplainantRespondentFiled
CC006000000079120Nandkumar PisatDharmesh Constructions Pvt. Ltd.01/06/2019
CC006000000194699Gaurav KapoorDharmesh Constructions Pvt. Ltd.27/10/2020
CC006000000195869SHASHIKANT SHIVRAO MULKIDHARMESH CONSTRUCTIONS PVT LTD THROUGH IT,S CHAIRMAN MUNISH P DOSHI09/02/2021
CC006000000196466sudhir makhijadharmesh constructions pvt limited24/03/2021
CC006000000197157ASHOK SINGHDHARMESH CONSTRUCTIONS PRIVATE LIMITED07/06/2021
CC006000000303736GAURAV KANWARDHARMESH CONSTRUCTION PRIVATE LIMITED21/12/2022
CC006000000364532SHRIRAM SUNDARAM IYERDHARMESH CONSTRUCTIONS PVT LTD27/02/2023
CC006000000364579RAHUL RADHEY PANDEYDHARMESH CONSTRUCTIONS PVT. LTD.02/03/2023
CC006000000375303SAURABH AGRAWALDHARMESH CONSTRUCTION PVT. LTD.19/04/2023
CC006000000396922Deepal Bharatbhai PandyaDharmesh Constructions Pvt. Ltd.04/08/2023
CC006000000428797VANITA HAKHUDHARMESH CONSTRUCTION PRIVATE LIMITED15/01/2024
CC006000000428849VINOD KUMAR HAKHUDHARMESH CONSTRUCTIONS PVT LTD17/01/2024
CC006000000479905Vinayak BhatDharmesh Construction Pvt Ltd02/04/2024
CC006000000480135Aparna SashteDharmesh Construction Pvt Ld19/04/2024
CC006000000480138Yogesh MalvankarDharmesh Construction Pvt Ltd19/04/2024
CC006000000480136Rakesh KhadyeDharmesh Construction Pvt Ltd19/04/2024
CC12400077alex victor pereiraDharmesh Constructions Private Limited11/09/2024
CC12401090SHOUVIK AJOY GHOSHDharmesh Constructions Private Limited10/12/2024
CC12501310Snehasis PalDharmesh Constructions Private Limited21/04/2025
CC12502212sarita Narsinh AvadhaniDharmesh Constructions Private Limited03/07/2025
CC12601524Sagar Kumar Vikrambhai DaveDharmesh Constructions Private Limited19/03/2026
CC12503339BHAGYASHREE BHASKAR PATILDharmesh Constructions Private Limited18/09/2025
CC12602738Gaurav Vijay TapadkarDharmesh Constructions Private Limited11/05/2026
CC12601386Parag Ashok SonavaneDharmesh Constructions Private Limited12/03/2026
CC12601943Arumugam Jaipal HarijanDharmesh Constructions Private Limited01/04/2026
CC12602844Prajwalit Prakash KendeDharmesh Constructions Private Limited15/05/2026
CC12602908Dharyadhar Bhagwan KhobragadeDharmesh Constructions Private Limited17/05/2026
CC12603360Rahul Anand PalkarDharmesh Constructions Private Limited02/06/2026
CC12603406Sachin Dattatray RaneDharmesh Constructions Private Limited03/06/2026
CC12604256priti satish aggarwalDharmesh Constructions Private Limited07/07/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 27 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2026

Documents filed139

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 139 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form 3 Acme Avenue B wing Mar-20.pdf5 Feb 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - April-June FY 2023-24.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - July-September FY 2023-24.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - October-December FY 2023-24.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - January-March FY 2023-24.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate- April-June 2024-25.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate - July-September 2024-25.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Certificate - April-June FY 2023-24_0001.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Certificate - July-September 2023-24.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Certificate - October-December 2023-24.pdf29 Nov 2024
Certificates of CA (Form 3)File: CA Certificate - January-March 2023-24.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - April-June FY 2023-24.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - July-Sept 2023-24.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - October-December 2023-24.pdf29 Nov 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate - January-March 2023-24.pdf29 Nov 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B june 20.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B sept 20.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B dec 20.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B march 21.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B June 21.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B Sept21.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B Dec 21.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B March 22.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B June-22.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B sept 22.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B DEC 22.pdf13 Oct 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: WFH RERA FORM 1 Arch Certi avenue -B March 23.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Avenue B wing june 2020 signed copies.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Avenue B wing sept 2020 signed copies.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Avenue B wing dec 2020 signed copies.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Avenue B wing march 2021 signed copies.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-AVENUE WING B - June 2021.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-AVENUE WING B - Sep 2021.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-AVENUE WING B - Dec 2021.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2-AVENUE WING B - March 2022.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Avenue B Wing Ph 1 - June 22.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Avenue B Wing Ph 1 - Sep 22.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Avenue B Wing Ph 1 - Dec 22.pdf13 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 - Avenue B Wing Ph 1 - March 23.pdf13 Oct 2023
Certificates of CA (Form 3)File: AVENUE WING B MAR 18_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: Acme Avenue Wing B June -20_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: avenue wing b 31 12 2020 Revised_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: Avenue Wing B 31 03 2021 Revised_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL-Form 3- Avenue B Wing - 30 June 2021_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL-Form 3- Avenue B Wing - 30 September 2021_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL-Form 3- Avenue B Wing - 31 December 2021_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL-Form 3- Avenue B Wing - 31 March 2022_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL-Form 3- Avenue B Wing - 30 June 2022_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL Acme Avenue Ph1 Wing B Sep 22_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL Acme Avenue Ph1 Wing B Dec 22_compressed.pdf12 Oct 2023
Certificates of CA (Form 3)File: DCPL Acme Avenue Ph1 Wing B March 23_compressed.pdf12 Oct 2023
CERSAI detailsFile: Debtor Based Search_List_Dharmesh.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Ketan Mehta DCPL.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Mukesh Ajmera DCPL.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Munish Doshi DCPL.pdf1 Sep 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest - Pravin Doshi DCPL.pdf1 Sep 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Avenue C wing Commercial Form 2A.pdf31 Aug 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A - Avenue B Wing Extension.pdf31 Aug 2023
Certificates of CA (Form 3)File: CA Certificate - Avenue Wing B_30-09-17.pdf26 Aug 2023
CERSAI detailsFile: Self Declaration on Report from CERSAI Website.pdf11 Aug 2023
Copy of the legal title reportFile: Title report dsk legal_compressed.pdf7 Aug 2023
Declaration about Commencement CertificateFile: Declaration about CC- Avenue B Wing.pdf7 Aug 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about Separate Bank Account - Avenue B Wing.pdf7 Aug 2023
Details of encumbrances concerned to FinanceFile: document.pdf11 Jul 2023
Details of encumbrances concerned to LegalFile: document.pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 5 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 6 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 7 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf11 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 8 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) .pdf11 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Avenue-B Wing.pdf11 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: C C extended Sale both wings 26052023.pdf27 May 2023
Declaration in FORM BFile: FORM B (AFFIDAVIT SCANNED).pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (APRIL-JUNE,FY 22-23).pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (JULY-SEPT, FY 22-23).pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A (OCT-DEC, FY 22-23).pdf6 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A ( JAN-MARCH, FY 22-23).pdf6 May 2023
Disclosure of sold/ booked inventoryFile: Sold-Booked Inventory List_compressed.pdf2 May 2023
Disclosure of sold/ booked inventoryFile: FORM 4 compressed.pdf2 May 2023
Commencement Certificates / NA Order for plotted developmentFile: C C Revalidation Fees SRA ReceiotRs 9000 Date 08-09-2022.pdf14 Feb 2023
Proforma of Allotment letterFile: ALLOTMENT AVENUE B WING.pdf5 Jan 2023

How this compares with Mumbai Suburban

88%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 66 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep AVENUE WING B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kandivali6,700+ in Mumbai Suburban

2 kmAVENUE WING BCompleted 112Lapsed / revoked 70Other 149Dot size: filed unitsN

Filed coordinates, straight-line distance. 331 registered projects within 2 km.

Builder: Dharmesh Constructions Private Limited

Dharmesh Constructions Private Limited has 6 registrations on MahaRERA, including AVENUE WING B and AVENUE WING A. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if AVENUE WING B is delayed beyond 30 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of AVENUE WING B?

The registered promoter entity is Dharmesh Constructions Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in AVENUE WING B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against AVENUE WING B?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for AVENUE WING B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at AVENUE WING B?

The professionals named in the filing: Architect: Mr.RAJESH ATHA; Architect: Mr.MUKESH BAHADUR of Consultants combined; Architect: Pankaj Kumaria; Engineer: SACPL, Mr Nikhil sanghvi.; Engineer: Kiran Dadasaheb Mulik; Chartered Accountant: Manoj Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in AVENUE WING B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About AVENUE WING B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save AVENUE WING B to a free account